Scheduled Tribes And Scheduled Castes Development Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Scheduled Tribes And Scheduled Castes Development Department - STSCD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date10 Feb 2025
Closing Date28 Feb 2025
Tender Amount₹ 1,17,63,035 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.R.H.G Stone Masonary in C.M (I:6) in F&P including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.

99.28

4486

445380.01

... More
W.B.C.B brick massnary in C.M. (1:6) in Super Structre with cost,convay & royalty etc. complete and as per the direction of the Engineer-in-charge. A) GROUND FLOOR

105.73

5624

594688.96

... More
FIRST FLOOR

128.09

5729

733878.85

... More
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. A) GROUND FLOOR i) Column base & Footing

66.52

6207

412942.86

... More
ii) Plinth Bend

19.2

7071

135776.64

... More
iii) Column & Beam

30.46

15316

466528.41

... More
iv) Lintel Bend

6.77

13795

93395.54

... More
v) Chhaja

19.44

1206

23456.3

... More
vi) Roof Slab

48.41

13356

646607.53

... More
vii) Stair case excluding landing slab

2.31

15195

35102.07

... More
B) FIRST FLOOR i) Column & Beam

29.17

17330

505519.02

... More
ii) Lintel Bend

6.48

15510

100509.34

... More
iii) Chhaja

20.52

1380

28336.07

... More
iv) Roof Slab

45.06

14984

675210.58

... More
v) Stair case excluding landing slab

2.31

17181

39690.19

... More
Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge. A) GROUND FLOOR

241.88

8586

2076926.81

... More
B) FIRST FLOOR

130.24

8874

1155827.9

... More
Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black A) FIRST FLOOR

354.3

384

136263.78

... More
20mm Thick C.P in C.M (1:6) over stone massonaryafter racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.

33.61

279

9407.44

... More
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. A) GROUND FLOOR

952.58

268

255862.99

... More
B) FIRST FLOOR

963.99

275

265482.85

... More
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. A) GROUND FLOOR

334.12

186

62213.14

... More
B) FIRST FLOOR

267.63

193

51893.46

... More
6mm thick C.P. in CM (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with cost, conveyance, royalty, taxes of all materials & complete work. A) GROUND FLOOR

308.51

208

64231.78

... More
B) FIRST FLOOR

299.26

217

64969.35

... More
Fixing Vetrified tiles in dado, skirting & riser of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete. A) GROUND FLOOR

24.13

1336

32237.68

... More
B) FIRST FLOOR

24.85

1355

33691.63

... More
Fixing Vetrified tiles in floors, treads on steps and landing on 20mm thick bed of cement mortar 1:4 (1 cement: 4 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete. A) GROUND FLOOR

271.1

1202

325997.75

... More
B) FIRST FLOOR

261.85

1215

318304.86

... More
Fixing glazed tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. A) GROUND FLOOR

27.18

1006

27367.54

... More
B) FIRST FLOOR

35.61

1020

36322.2

... More
Fixing glazed tiles in dado, skirting and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. A) GROUND FLOOR

39.8

998

39740.3

... More
B) FIRST FLOOR

43.12

1018

43913.41

... More
Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm . A) GROUND FLOOR

387.17

180

69884.19

... More
B) FIRST FLOOR

288.15

187

53970.5

... More
Distempering two coats to wall with distemper A) GROUND FLOOR

1280.53

170

217818.15

... More
B) FIRST FLOOR

1283.77

174

223504.36

... More
Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect. A) GROUND FLOOR

5605.43

71

397985.53

... More
Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete.

134.42

617

83044.68

... More
Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge. A) GROUND FLOOR

153.5

259

39879.3

... More
B) FIRST FLOOR

160.65

266

42813.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.