Scheduled Tribes And Scheduled Castes Development Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_STSCD_81673_4Bid Award Id
ViewTender No
ITDAGNP-02/2022-23Tender Authority
Scheduled Tribes And Scheduled Castes Development Department ViewPurchaser Address
-Website
http://STandSCDevelopmentDepartment
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
R.R.H.G Stone Masonary in C.M (I:6) in F&P including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
49.91
-
3327.8
... More
W.B.C.B brick massnary in C.M. (1:6) in Super Structre with cost,convay & royalty etc. complete and as per the direction of the Engineer-in-charge.GROUND FLOOR
116.95
-
3755.4
... More
FIRST FLOOR
118.09
-
4028.7
... More
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. GROUND FLOOR . Column base & Footing
26.81
-
4886.1
... More
Plinth Bend
11.7
-
5253.7
... More
Column & Beam
24.86
-
10774.8
... More
Lintel Bend
7.02
-
8474.2
... More
Chhaja
19.04
-
794.2
... More
Roof Slab
34.03
-
9154.3
... More
Stair case excluding landing slab
1.99
-
10254.3
... More
FIRST FLOOR Column & Beam
24.56
-
12065.3
... More
Lintel Bend
7.02
-
9306.7
... More
Chhaja
19.04
-
897.3
... More
Roof Slab
32.71
-
10123.2
... More
Stair case excluding landing slab
1.98
-
11439.4
... More
Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.GROUND FLOOR
158.54
-
8711.6
... More
FIRST FLOOR
106.24
-
8926.7
... More
Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size blackFIRST FLOOR
321.02
-
326.3
... More
20mm Thick C.P in C.M (1:6) over stone massonaryafter racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
21.31
-
209.1
... More
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.GROUND FLOOR
491.44
-
199.7
... More
FIRST FLOOR
654.87
-
204.7
... More
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. GROUND FLOOR
337.72
-
139.3
... More
FIRST FLOOR
267.63
-
145.5
... More
6mm thick C.P. in CM (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with cost, conveyance, royalty, taxes of all materials & complete work. GROUND FLOOR
229.28
-
156.9
... More
FIRST FLOOR
219.98
-
163.5
... More
Fixing Vetrified tiles in dado, skirting & riser of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete.GROUND FLOOR
8.84
-
1020.1
... More
FIRST FLOOR
6.46
-
1199.5
... More
Fixing Vetrified tiles in floors, treads on steps and landing on 20mm thick bed of cement mortar 1:4 (1 cement: 4 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete.GROUND FLOOR
57.71
-
917.3
... More
FIRST FLOOR
33.53
-
1091.6
... More
Fixing glazed tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.GROUND FLOOR
36.21
-
785
... More
FIRST FLOOR
36.21
-
795
... More
Fixing glazed tiles in dado, skirting and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.GROUND FLOOR
30.76
-
765.9
... More
FIRST FLOOR
30.76
-
781
... More
1" thick A.S. flooring in C.C. (1:2:4) with12mm size hg chips.GROUND FLOOR
142.95
-
312.5
... More
FIRST FLOOR
142.95
-
313.9
... More
Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm .GROUND FLOOR
378.07
-
138
... More
FIRST FLOOR
286.67
-
143.2
... More
Finishing walls with water proofing cement paint two coats GROUND FLOOR
739.76
-
34.8
... More
FIRST FLOOR
962.43
-
36
... More
Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect.
5562.94
-
85
... More
Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete.
142.12
-
458.4
... More
Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge.GROUND FLOOR
166.94
-
197.6
... More
FIRST FLOOR
147.21
-
202.7
... More
Making RCC Jally as per approved design 2.5 cm to 5 cm thick and fixing in cement mortar in position after cutting the grooves etc. complete including cost of all materials.
5.13
-
220
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements