Sambalpur Development Authority Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Sambalpur Development Authority Tender

Civil And Construction
Road Construction
Opening Date31 Oct 2018
Closing Date15 Nov 2018
Tender Amount₹ 66,33,784 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface.

3000

7815

260.52

... More
Dewatering before & during excavation of work.

230

11799

51.3

... More
Transporting the earth rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum laterite stone and washed gravel by mechanical means within 5.00 Km lead , lift including loading & unloading etc all complete

375

56688

151.17

... More
Construction of Pathway (Paver block)

-

-

-

... More
Earth work in all kinds of soil within 50 M initial lead and 1.5 M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm. And laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge.

284.19

41326

14541.94

... More
Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants etc.all complete required for the work to finished

315.77

156621

496

... More
Cement concrete (1:2:4) with 12 mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, royalty, conveyance, cess, Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

14.21

71474

5029.86

... More
Providing, spreading, laying on road surface and compacting, proper camber layers of paver inter locking blocks minimum 60 mm thickness and inscribed machine mixed and compacted having crushing strength not less then M30 including filling the interstices with sand, watering, brooming, bliding and consolidation with wooden hammer as per OPWD specification and relevent code all cost of materials, cnveyance, royality, labour, cess, GST, T&P required to the work etc. complete to finished items.

1705.16

1532938

899

... More
Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) including all cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete, as per OPWD specification required for the work to finished items of work.

142.1

525819

3700.35

... More
Construction of Bridge

-

-

-

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

1.62

235

14541.94

... More
Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants etc.all complete required for the work to finished items.

0.18

89

496

... More
Cement concrete (1:3:6) with 40 mm size hand broken hard granite H.G.C.B metal including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items.

0.18

697

3875.7

... More
Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. 40

2.67

11610

4348.61

... More
Requirement of HYSD/ MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge, cess.42

2.67

16062

6015.95

... More
Rigid and smooth centering and shuttering for CC/ RCC works in RCC walls and fins including attached pillasters including false work and dismentalling then after casting including cost of materials, cess complete in ground floor.43,46

5.27

2856

542.63

... More
Rigid and smooth centering and shuttering for CC / RCC works including false works and dismantling them after casting including cost of materials complete in ground floor Beam

4.1

2257

550.3

... More
Rigid and smooth centering and shuttering for CC / RCC works including false works and dismantling them after casting including cost of materials complete in ground floor - RCC floor and roof slabs, landings, balconies, projecting sun shades and chajjas upt 4.3m height

8.83

3071

347.84

... More
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer in charge.

1.62

132

8159.66

... More
12mm. Thick cement plaster (1:4) over brick work with cement punning for skirting

6.98

834

119.49

... More
Construction of Store Room

-

-

-

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

13.73

1996

14541.94

... More
Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work.

10.08

4999

496

... More
Cement concrete (1:3:6) with 40 mm size hand broken hard granite metal including cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

8.45

32749

3875.7

... More
Fly ash bricks 25cm x 112m x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work

-

-

-

... More
(i) In foundation and plainth.

10

36999

3700.35

... More
In Super structure

11.66

43955

3770.68

... More
Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying, cost of materials, labour, conveyance, royalty, tools and plants, water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

5.24

22793

4348.61

... More
Requirement of HYSD / MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge.

5.24

31533

6015.95

... More
Rigid and smooth centering and shuttering for RCC works including false work and dismentalling then after casting including cost of materials complete in ground floor.

-

-

-

... More
RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc

5.31

482

90.89

... More
RCC Lintel

7.27

1634

224.89

... More
RCC floor and roof slabs, landings,balconies, projecting sun shades and chajjas

33.91

11795

347.84

... More
Supplying, fitting and fixing vitrifed tile in floors of size 600mm x 600mm of approved make conforming to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand ) and filling joints with white cement of approved qualiy including cost of all materials, labour T&P etc required for the work all complete as per direction of EIC.

26.95

17430

646.79

... More
Fixing tiles in dados skiring and risers of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing ceomplete excluding cost of precast tiles.

4.78

3036

636

... More
12mm thick cement plaster (1 : 4) over brick work with cement punning for skirting

9.02

1077

119.49

... More
12mm thick cement plaster in cement morter(1:6) including cost of rayality, conveyance etc all complete 111

105.02

10816

102.99

... More
12 mm thick cement plaster in cement morter(1:3) including cost, rayality, conveyance etc all complete

23.58

2900

123.01

... More
12 mm thick CP (1:4 ) over brick work including cement punning and bituman painting including cost of conveyance royalty etc. all complete.

5.31

669

126.16

... More
2.50 cm thick grading concrete gradient (1:2:2) on roof slab with 6 mm size hard broken granite chips on new works including cost of conveyance royalty etc. all complete.

28.89

6512

225.48

... More
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the EIC.

3.18

259

8159.66

... More
Finishing walls with water proofing cement paint of approved shade two coats to give an even shade including cost of paint and labour etc all complete. with approved paint and primer, cost of labour and materials ect. all complete.

128.6

3105

24.15

... More
Painting one coat with approved primer including cost of labour and materials ect. all complete.

13.68

510

37.3

... More
Painting two coats with approved paint including cost of labour and materials ect. all complete.

13.68

1291

94.38

... More
Labour for fitting and fixing of MS window grills as per approved design including cost of all materials complete and directon of EIC.

5.4

363

67.4

... More
Requirment of MS door, window & grill and its cost etc 199

-

-

-

... More
Door (D1+D2)

94.25

5372

57

... More
Window (W1+W2)

124.42

7091

57

... More
Construction of Security Room cum ticket counter

-

-

-

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

13.88

2018

14541.94

... More
Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work.

4.25

2105

496

... More
Cement concrete (1:3:6) with 40 mm size hand broken hard granite metal including cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

3.56

13799

3875.7

... More
Fly ash bricks 25cm x 112m x 8cm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work.

-

-

-

... More
(i) In foundation and plainth.

10.29

38090

3700.35

... More
In Super structure

24.53

92493

3770.68

... More
Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying, cost of materials, labour, conveyance, royalty, tools and plants, water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

4.37

18993

4348.61

... More
Requirement of HYSD / MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge.

4.37

26275

6015.95

... More
Rigid and smooth centering and shuttering for RCC works including false work and dismentalling then after casting including cost of materials complete in ground floor.

-

-

-

... More
RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc

5.47

497

90.89

... More
RCC Lintel

7.46

1678

224.89

... More
RCC floor and roof slabs, landings,balconies, projecting sun shades and chajjas

31.57

10979

347.84

... More
Supplying, fitting and fixing vitrifed tile in floors of size 600mm x 600mm of approved make conforming to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand ) and filling joints with white cement of approved qualiy including cost of all materials, labour T&P etc required for the work all complete as per direction of EIC.

19.2

12418

646.79

... More
Fixing tiles in dados skiring and risers of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing ceomplete excluding cost of precast tiles.

5.7

3625

636

... More
12mm thick cement plaster (1 : 4) over brick work with cement punning for skirting

6.56

784

119.49

... More
12mm thick cement plaster in cement morter(1:6) including cost of rayality, conveyance etc all complete 111

122.7

12636

102.99

... More
12 mm thick cement plaster in cement morter(1:3) including cost, rayality, conveyance etc all complete

18

2214

123.01

... More
2.50 cm thick grading concrete gradient (1:2:2) on roof slab with 6 mm size hard broken granite chips on new works including cost of conveyance royalty etc. all complete.

20.48

4617

225.48

... More
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the EIC.

3.71

302

8159.66

... More
Finishing walls with water proofing cement paint of approved shade two coats to give an even shade including cost of paint and labour etc all complete. with approved paint and primer, cost of labour and materials ect. all complete.

137.7

3325

24.15

... More
Painting one coat with approved primer including cost of labour and materials ect. all complete.

13.68

510

37.3

... More
Painting two coats with approved paint and primer including cost of labour and materials ect. all complete.

13.68

1291

94.38

... More
Labour for fitting and fixing of MS window grills as per approved design including cost of all materials complete and directon of EIC.

5.4

363

67.4

... More
Requirment of MS door, window & grill and its cost etc 199

-

-

-

... More
Door (D1+D2)

83.16

4740

57

... More
Window (W1+W2)

111.17

6336

57

... More
Construction of Fountain pool for musical fountain

-

-

-

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

41.31

6007

14541.94

... More
Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work.

8.3

4117

496

... More
Cement concrete (1:3:6) with 12mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work

6.1

21580

3535.36

... More
Fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in super structure including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work

5.81

21505

3700.35

... More
Cement concrete (1:1½:3) with 12 mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete , as per OPWD specification required for the work to finished items of work

10.01

56304

5624.22

... More
Requirement of HYSD / M.S.Rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge

8.51

51191

6015.95

... More
Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1(1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles

69.05

44663

646.79

... More
Transporting the excavated earth by Mechanical means within 5.00 Km lead, lift including loading & unloading etc all complete.

41.31

6245

151.17

... More
Fine dressing to Inside Park

-

-

-

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

971.25

141238

14541.94

... More
Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface.

6475

16868

260.52

... More
Construction of Retaining Wall

-

-

-

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

468

68056

14541.94

... More
Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work.

48

23808

496

... More
Cement concrete (1:3:6) with 40 mm size hand broken hard granite metal including cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

24

93016

3875.7

... More
Cement concrete (1:2:4) with 12 mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, royalty, conveyance, cess, Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items of work.

183

920464

5029.86

... More
Supplying fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.

146.4

880735

6015.95

... More
Rigid and smooth centering and shuttering for CC/ RCC works in foundation,plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismentalling then after casting including cost of materials, cess complete in ground floor.

1152

104705

90.89

... More
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the EIC.

468

38187

8159.66

... More
Earth work in all kinds of soil within 50 M initial lead and 1.5 M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm. And laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge.

28.26

4109

14541.94

... More
Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants etc.all complete required for the work to finished

9.58

4751

496

... More
Cement concrete (1:3:6) with 12mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work

8.16

28848

3535.36

... More
Cement concrete (1:1½:3) with 12 mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete , as per OPWD specification required for the work to finished items of work

10.19

57310

5624.22

... More
Requirement of HYSD / M.S.Rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge

7.13

42893

6015.95

... More
Rigid and smooth centering and shuttering for RCC works including false work and dismentalling then after casting including cost of materials complete in ground floor, RCC walls and fins including attached pillasters

58.88

31950

542.63

... More
Fixing ceramic tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1(1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles

33.17

21454

646.79

... More
Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles.

28.26

17973

636

... More
Coursed rubble hard stone masonry (first class) in cement mortar (1.6) in foundation and plinth Per 1 cum.

8.01

26797

3345.52

... More
Earth work excavation in foundation in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge.

148.5

21594

14541.94

... More
Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants etc.all complete required for the work to finished items.

27

13392

496

... More
Cement concrete (1:3:6) with 40 mm size hand broken hard granite metal including all cost of materials, labour, conveyance, royalty, cess,Tools and Plants water for curing etc.all complete as per OPWD specification required for the work to finished items.

9

34881

3875.7

... More
Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete,as per OPWD specification required for the work to finished items of work.

25.2

109584

4348.61

... More
Requirement of HYSD/ MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge, cess.42

17.64

106121

6015.95

... More
Rigid and smooth centering and shuttering for CC/ RCC works in foundation,plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismentalling then after casting including cost of materials, cess complete in ground floor.

222

20177

90.89

... More
Coursed rubble hard stone masonry (first class) in cement mortar (1.6) in foundation and plinth Per 1 cum

27

90329

3345.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.