Rural Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Works Department - RWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date2 Feb 2024
Closing Date8 Feb 2024
Tender Amount₹ 56,93,000 
Notes
Download

Costs

Summary

Tender Online Jjpr-ii-21 Of 2023-24

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ground Floor

77.07

65329

847.66

... More
Providing Cement Concrete (1:3:6) with 40mm size clean hand broken granite metal of approved quality from approved quarry including hoisting lowering & levelling in position to required level in each layer not exceeding 15cm thick in foundation including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering with cost conveyance taxes royality, labour of all materials and including hire & running charges of machineries T&P required for the work including supplying & working of pumps and cess as per the specifiction and direction of Engineer-in-Chief & as per SOP of5T Charter

-

-

-

... More
Ground Floor

22.96

129932

5659.09

... More
Renovation work ( Ground floor)

16.53

93544

5659.09

... More
Providing and laying Reinforced cement concrete of M-20 grade with 20mm and down grade clean crusher broken granite chips aggregate of approved quality from approved quarry including hoisting, lowering & levelling in position to required level in each layer not exceeding 15cm thick including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering if necessary with cost, conveyance taxes royalty labour of all materials and including hire and running charges of machinaries T&P required for the work including supplying and working of pumps and cess as per the specification and direction of Engineer-in-charge & as per SOP of 5T Charter.

-

-

-

... More
Ground Floor :

-

-

-

... More
Column Base

12.57

76705

6102.27

... More
Column & Beam

6.23

133957

21501.98

... More
Lintel

2.22

27895

12565.43

... More
Chajja

12.03

12982

1079.18

... More
Staircase

4.3

57122

13284.28

... More
Roof Slab

10.73

127938

11923.4

... More
First Floor :

-

-

-

... More
Column & Beam

6.83

178743

26170.29

... More
Lintel

2.22

34291

15446.43

... More
Chajja

12.03

15866

1318.93

... More
Staircase

6.24

101768

16309.04

... More
Roof Slab

15.52

227771

14676

... More
Fly Ash Brick masonary with Fly Ash Bricks of size 25cm x 12cm x 8cm in Cement Mortar (1:6) in Super Structure etc. complete with all cost, conveyance, royalties, taxes and cess with all labour and T&P etc. complete as per direction of Engineer-in-Charge& as per SOP of 5TCharter .

-

-

-

... More
Ground Floor :

-

-

-

... More
Foundation & plinth

15.61

74910

4798.87

... More
Superstructure

27.9

134818

4832.2

... More
First Floor :

-

-

-

... More
Superstructure

35.1

178553

5086.98

... More
Providing HYSD bar reinforcement for R.C.C.work including straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification for road & bridge and direction of Engineer-in-Charge& as per SOP of 5TCharter .

-

-

-

... More
Ground Floor

39.51

351611

8899.3

... More
First Floor :

34.59

308611

8922

... More
12mm (1/2") thick cement plaster in C.M (1:6) finsihed smooth to out side brick walls after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and laobur with T&P required for the work with all taxes, royalties & cess etc, complete in all floors as per direction of Engineer-in-charge& as per SOP of 5TCharter .

-

-

-

... More
Ground Floor

175.89

27579

156.8

... More
First Floor :

174.88

27972

159.95

... More
Renovation work (First Floor)

330.92

52930

159.95

... More
16mm (5/8") thick cement plaster in C.M. (1:6) finished smooth to inside surface of 9" thick brick wall after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and labour with T&P required for the work with all taxes, royalties & cess etc, complete in all floor as per direction of Engineer-in-charge.& as per SOP of 5TCharter

-

-

-

... More
Ground Floor

207.66

46376

223.33

... More
First Floor :

206.09

46994

228.03

... More
Renovation work (First Floor)

175.38

39991

228.03

... More
Finishing surface of wall with cement based wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging including cost of all materials, labour etc.complete as per direction of E-I-C & as per SOP of 5T Charter

-

-

-

... More
Ground Floor

207.66

14507

69.86

... More
First Floor :

206.09

14836

71.99

... More
Renovation work (First Floor)

1438.56

103561

71.99

... More
Wall priming one coat with any approved shade of primer (WBD ) on new plastered surface with any approved primer including cost of primer ( water based) of approved make and finished smooth and even surface to receive painting including cost of all materials & as per SOP of 5T Charter

-

-

-

... More
Ground Floor

383.55

25517

66.53

... More
First Floor

380.97

25875

67.92

... More
Wall painting two coats to walls with plastic emulsion paint of approved shade with primer on New work one coat to give an even shade including cost of paint per 1 sqm & as per SOP of 5T Charter

-

-

-

... More
Ground Floor

207.66

17113

82.41

... More
First Floor

206.09

17499

84.91

... More
Renovation work (First Floor)

1389.65

117995

84.91

... More
Wall painting two coats to walls with any approved quality of weather seal coat with any approved shade including cost of paint on new plastered surface of approved make and finished smooth and even surface to receive painting & as per SOP of 5T CharterSOP of 5T Charter

-

-

-

... More
Ground Floor

175.89

14426

82.02

... More
Renovation work (Ground Floor)

873.61

71653

82.02

... More
First floor

174.88

14782

84.53

... More
Providing fitting, fixing M.S made doors including all fittings, labour, T&P etc. all complete as per direction of the Engineer-in-chargeas per SOP of 5T Charter.

-

-

-

... More
Ground floor

204.12

16329

80

... More
First floor

204.12

16329

80

... More
Renovation work ( First Floor)

524

41920

80

... More
Supplying, fitting, fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters & all fittings & fixturesas per SOP of 5T Charter

-

-

-

... More
Ground floor

12.15

60275

4960.97

... More
first floor

24.3

120551

4960.97

... More
Renovation work ( First Floor)

10.08

50006

4960.97

... More
Supplying, fitting & fixing of openable UPVC doors with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters & all fittings & fixturesas per SOP of 5T Charter

-

-

-

... More
Groun floor

22.05

191440

8682.12

... More
First floor

37.8

328184

8682.12

... More
Renovation work ( First Floor)

11.5

99844

8682.12

... More
Priming one coat with any approved primer (iron work) including sand papering,polishing the surface,including cost conveyance royalities and all taxes of all materials alongwith T&P required for the work including cost of paint & primer complete as per direction of E-I-C, as per SOP of 5T charter

-

-

-

... More
Ground Floor

22.28

1384

62.14

... More
First Floor

22.28

1443

64.81

... More
Renovation work ( First Floor)

35

2268

64.81

... More
Painting two coats of enamel paint in all floors to new iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost oas per SOP of 5T Charter

-

-

-

... More
Ground Floor

12.15

1892

155.79

... More
First Floor

22.28

3593

161.3

... More
Renovation work ( First Floor)

35

5645

161.3

... More
Providing,Laying and fixing RCC Ventileter including cost, conveyance, taxes of all materials to site and all labour charges complete and as per direction of E.I.C & as per SOP of 5T Charter

-

-

-

... More
Ground Floor

0.49

147

300

... More
First Floor

0.49

147

300

... More
Fixing vitrified tiles in floors treads or steps and landing on 20mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles complete in all respect as per the direction of Engineer in Chargeas per SOP of 5T Charter.

-

-

-

... More
Ground Floor

393

571862

1455.12

... More
First Floor :

213

314245

1475.33

... More
Renovation work ( First Floor)

202.59

298887

1475.33

... More
Fixing Vitrified tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Chargeas per SOP of 5T Charter.

-

-

-

... More
Ground Floor

5.81

8946

1539.85

... More
First Floor

23.06

36179

1568.92

... More
Renovation work ( First Floor)

91.76

143964

1568.92

... More
Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead as per the direction of Engineer-in-charge& as per SOP of 5T Charter

-

-

-

... More
Renovation work

506.3

22256

43.96

... More
Dismantling and removing 2.5 cm.thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead as per the direction of Engineer-in-charge.& as per SOP of 5T Charter

-

-

-

... More
Renovation work

450.21

39582

87.92

... More
Dismentaling & removing doors, windows, & ventilators , including removal of frame,hinges, fastening & stacking the useful materials for the reuse and removing the debries within 50 m lead.& as per SOP of 5T Charter

-

-

-

... More
Renovation work

33.52

11743

350.33

... More
Removing old grading plaster from roof slab, cleaning the surface, lowering and removing the debris within 50m lead as per the direction of Engineer-in-charge.& as per SOP of 5T Charter

-

-

-

... More
Renovation work

353.25

24070

68.14

... More
4 cm thick grading concrete (1:2:4) on roof slab with 12mm & down grade size black hard granite chips for old work as per the specifiction and direction of Engineer-in- charge& as per SOP of 5T Charter

-

-

-

... More
Renovation work

353.25

252983

716.16



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.