Rural Water Supply And Sanitation Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Water Supply And Sanitation Department - RWSS Tender

Civil And Construction
Eprocure
Opening Date26 May 2018
Closing Date9 Jun 2018
Tender Amount₹ 33,64,324 
Notes
Download

Costs

Summary

PWS to village Mariguda under Padmapur Block

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying all labour T & P for cement Concrete (1:3:6) with 40 mm size hard granite metal per 1cum

4.75

18984

3996.77

... More
Supplying all labour T & P for cement Concrete (1:2:4) with 12mm size hard granite chips per 1cum

9.5

48509

5106.25

... More
Pump set for production well - Supply, installation, testing and commissioning of variable voltage star rated, ISI/BIS and ISO certified, three phase vertical submersible pump set of working head of 42 mtr and 50 lpm discharge capacity (±5 % variation is allowed) including supply of materials like column pipe 50 mm OD about 10 mtr length , SS nipples, GI bends of suitable to column pipe etc MS clamps with nut bolt steel rope (PVC covered) whatever required for keeping the pump set in vertical position in the bore and giving connection to the pump with starter/ control panel to run the pump for testing, complete as per direction of engineer in-charge. -- Cost of variable voltage 3 HP submersible pump sets suitable for 50 Lpm discharge in 42 head.(model R-63K(OUTLET 2.5" OR 50 MM) ( including contractors profit OH charge & cess )

1

49731

49731.95

... More
cost of 10 mtr GI 10 mpa 50 mm dia column pipe

10

4944

494.43

... More
cost of SS nipple

1

393

393.24

... More
40 mm GI bend

1

406

406

... More
locking clamp

2

464

232

... More
Steel rope 55 mtr

55

1595

29

... More
Copper flat cable of 4 mm sq of make Finolex/Havels/ V-Guard for lowering of submersible pump

95

9918

104.4

... More
Providing safety sleeve to the flat cable from pump house to production well site by using 40 mm dia HDPE pipe PN-6

30

1468

48.96

... More
Cost of standby variable voltage 3 HP submersible pump sets suitable for 50 Lpm discharge in 42 head.(model R-63K(OUTLET 2.5" OR 50 MM) ( including contractors profit OH charge & cess )

1

49731

49731.95

... More
Pump set for Sump - Supply, installation, testing and commissioning of variable voltage star rated, ISI/BIS and ISO certified, 3 phase open well Submersible pump set of working head of 20 mtr and 96 lpm discharge capacity(±5 % variation is allowed) including supply of all materials like Delivery pipe 80 mm OD about 50 mtr length , SS nipples, GI bends suitable to Delivery pipe etc MS clamps with nut bolt steel rope (PVC covered) whatever required for keeping the pump set in horizontal position in the sump and giving connection to the pump to run the pump for testing , complete as per direction of engineer in-charge. ( including contractors profit OH charge & cess ) - Cost of variable voltage 3 HP submersible pump sets suitable for 96 Lpm discharge in 20 mtr head As per IS - 14220,three phase horizontal submersible monoset pumpset

1

34085

34085.44

... More
cost of 10 mtr GI 10 mpa 50 mm dia column pipe

10

4937

493.78

... More
Copper flat cable of 10 mm sq of make Finolex/Havels/ V-Guard for lowering of submersible pump

50

14500

290

... More
Cost of standby variable voltage submersible pump sets suitable for 96 Lpm discharge in 20 mtr head As per IS - 14220,three phase horizontal submersible monoset pumpset. ( including contractors profit OH charge & cess )

1

34085

34085.44

... More
Construction of pump house - Supplying all labour T & P for earth work for foundation in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge.

23.76

3288

138.42

... More
Supplying all materials , labour T & P for filling in foundation and plinths with sand well watered and rammed including cost,carriage & royality of all materials etc. all complete & as per direction of Engineer-In-Charge

8.27

2676

323.58

... More
Supplying all labour T & P materials providing C.C (1:3:6)with 40 mm CBG metal of approved quarry in foundation including cost,conveyance and royality of materials etc all complete as per the direction of Engineer-In-Charge.

4.75

18984

3996.77

... More
R.R stone masonary in C.M(1:6) with RR stone of approved quality and size including splays cutting, circular moulding with cost, conveyance of materials including royalty watering , curing etc complete as per the direction of Engineer-In-Charge.

18.41

52308

2841.33

... More
C.B brick masonary in C.M (1:6) with C.B brick of approved quality and size in foundation and plinth including splays cutting, circular moulding with cost, conveyance of materials including royalty, watering, curing etc complete.

13.49

45454

3369.5

... More
Supplying all labour T & P for rigid and smooth centering, shuttering for R.C.C works for wall of well steining, roof slab , lintel, chajja beam etc. including false works & dismantling them after casting including cost taxes and conveyance charge of all materials to work site as directed by the Engineer-In-Charge. -- Plinth Bend (shuttering )

5.19

504

97.28

... More
Lintel shuttering

3.11

729

234.47

... More
Beam shuttering

5.65

3146

556.86

... More
Roof slab centring

27.64

9775

353.67

... More
RCC M-25 using 12mm size hard granite chips of approved quality from approved quarry including hoisting laying concrete to required thickness with cost, conveyance of materials labour including royalty, watering curing etc complete.

4.29

21293

4963.41

... More
Providing MS reinforcement for RCC work including cutting, bending binding of MS rod including cost of all materials labour T & P etc Quantity 1 qntl per 1 cum or RCC work

4.29

20958

4885.47

... More
Supplying all labour T & P for 12mm thick C.P in CM(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials , required for the work including royalty etc. complete as per direction of the Engineer-In-Charge.

113.02

10756

95.17

... More
12 mm thick C.P in CM (1:4) over brick work finished smooth with cement punnings including watering & curing with cost, conveyance of materials labour, T & P required for the work including royalty etc.complete as per the direction of the Engineer in charge .

6.04

672

111.41

... More
20 mm thick CP in C.M(1:6) over stone work finished smooth with cement punning including watering & curing with cost, conveyance of materials, labour, T & P required for the work including royalty etc. complete as per the direction of Enginner-In-Charge

12.94

1489

115.1

... More
White washing two coat with shell lime including cost of all materials labour, T & P etc complete as per the direction of Enginner-In-Charge

66.74

626

9.38

... More
Wall painting two coats with plastic emulsion paint of approved shade on old work including cost of paint etc. complete as per the direction of Enginner-In-Charge

45.76

27

0.61

... More
Providing panel MS door and window with grills double leaf shutter with Ms frame complete including all cost of complete as per the direction of Enginner-In-Charge materials etc

333.96

20037

60

... More
Supplying all labour, T & P and fittings of MS door and window with grills fixing in position using CC (1:2:4) with 12 mm size HG chips etc complete as per the direction of Enginner-In-Charge

11.46

58517

5106.25

... More
Painting two coats over a coat of primer with any approved paint & primer over iron work including cost, conveyance of materials labour, T & P etc complete as per the direction of Enginner-In-Charge

7.59

714

94.09

... More
2.5 cm thick A.S Flooring with C.C(1:2:4) using 12 mm size C.B chips of approved quality from approved quarry laying concrete including cost, conveyance of materials labour, T & P etc complete as per the direction of Enginner-In-Charge

14.85

3351

225.72

... More
Supplying all labour T & P for finishing wall with water proofing cement paint of approved shade on new work two coat to give an even shade including cost of paint.

24.73

630

25.48

... More
Supplying all labour T & P for vitrified premium grade floor tiles of (300 mm x 300 mm) having thickness 8 mm to 10 mm confirming to IS-4457

10.7

11520

1076.65

... More
Supplying all labour T & P for fitting & fixing of seramic Indian pan for toilet room inluding all cost transportation etc all complete as per direction of Engineer-In-charge.-- i) Including all fittings ( 110 mm PVC pipe, 100 mm equality ,100 mm band, half PVC band & jointing materials)

1

2500

2500

... More
Supplying all labour T & P for R.C.C ring for 0.9 mtr dia including transporting ,excavation, fixing and placing in position of soakpit .

4

4000

1000

... More
Supplying all labour T & P for R.C.C cover plate including transporting , fixing and placing in position of soakpit .

1

1000

1000

... More
Development of site including leveling etc

1

5000

5000

... More
COMPOUND WALL AT HEAD WORK SITESupplying all labour T & P for earth work for foundation in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge per 100 cum.

9.64

1334

138.42

... More
Supplying all materials, labor, T&P for filling the foundation with sand watered and rammed with all cost, conveyance and royalities as per direction of Engineer-in-charge

2.14

692

323.58

... More
Supplying all labour T & P for cement Concrete (1:3:6) with 4cm size hard granite metal per 1cum as per direction of Engineer-in-charge

2.14

8553

3996.77

... More
Supplying all labour T & P for rigid and smooth centering, shuttering for R.C.C work including false works & dismantling them after casting including cost of materials complete in ground floor as per direction of Engineer-in-charge

10.13

985

97.28

... More
Supplying all labour T & P for R.C.C work of M-20 grade with 20mm and down grade black hard granite(crusher broken) stone chips including hoisting and laying as per direction of Engineer-in-charge

3.5

16189

4625.59

... More
I)Supplying all labour T & P for random rubble H.G stone Masonry in cement mortar (1:6) in foundation and plinth per 1 cum.

3

8523

2841.33

... More
Supplying all labour T & P for fitting & fixing uncoated HYSD Bar reinforcement including cutting, bending ,binding,shifting to site including cost of material etc complete as per the direction of Engineer-In-Charge.

2.45

11969

4885.47

... More
Supplying all labour T & P fo brick work in super structure with C.B bricks 23cm X 11cm X 8cm size having crushing strength not less than 75 Kg/cm² with dimensional tolerence ±8 percent in cement motar (1:6) for superstructure per 1 cum as per direction of Engineer-in-charge

23.66

79722

3369.5

... More
Supplying all labour T & P for 12mm thick cement plaster (1:6) on brick work per length of 50 mtr as per direction of Engineer-in-charge

211.25

20104

95.17

... More
Supplying all labour T & P for White washing two coats with shell lime per sqm as per direction of Engineer-in-charge

211.25

2036

9.64

... More
Supplying all labour T & P for finishing wall with water proofing cement paint of approved shade on new work two coat to give an even shade including cost of paint as per direction of Engineer-in-charge

211.25

5382

25.48

... More
GATE PILLAR of COMPOUND WALL Supplying all Labours, T&P etc. and materials for construction of two nos nasonary pillars to hold MS iron gate (2 fold) about 3 mtr wide excluding cost of gate etc all complete as per the direction of engineer-in- charge. Supplying all labour T & P for Earth work for foundation in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge per 100 cum.

1.62

224

138.42

... More
Supplying all materials, Labours, T&P etc. and filling the foundation with sand watered and rammed including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.24

77

323.58

... More
Supplying all materials, Labours, T&P etc. and cement Concrete (1:3:6) with 4cm size hard granite metal including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.24

959

3996.77

... More
Supplying all materials, Labours, T&P etc. and random rubble H.G stone masonry in cement mortar(1:8) in foundation and plinth including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.83

2263

2726.99

... More
Supplying all materials, Labours, T&P etc. and 2.5cm Damp proof course with C.C (1:2:4) using 12mm size hard broken granite chips including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.72

154

214.43

... More
Supplying all materials, Labours, T&P etc. and brick work with K.B bricks 23cm x 11cm x 8 cm size having crushing strength not less than 35 kg/cm2 with dimensional tolerance ± 8 percent in cement in cement mortar including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

1.01

3403

3369.5

... More
Supplying all materials, Labours, T&P etc. and 12 mm thick cement plaster (1:6) on brick work including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

6.48

616

95.17

... More
Supplying all materials, Labours, T&P etc. and 20mm thick cement plaster (1:6) on stone work including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

1.32

151

115.1

... More
Supplying all materials, Labours, T&P etc. and fixing of nurali tile in cooping of compound wall pillar on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of tiles including rubbing & polishing including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

2.4

1057

440.74

... More
Supplying all materials, Labours, T&P etc. and White washing two coats with shell lime including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

7.8

73

9.38

... More
Supply all labour T & P for MS door including making, fitting, fixing painting the gate with two coats of enamelled paint of approved colour all complete as per the direction of engineer-in-charge.

238

14280

60

... More
RECHARGE PIT TYPE OF STRUCTURE 2 Nos - Supplying all labour T & P for earth work for foundation and plinth / pipe line in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge per 100 cum. -Recharge Pit top upto 1.50 mtr

90.6

12540

138.42

... More
2nd lift

50.32

11215

222.88

... More
3rd lift

4.46

1634

366.38

... More
Supplying all materials, labour for filling in trenches with hard broken soling stone other than granite (40 mm to 90 mm) , sand materials or river single bajuri with all cost & conveyance, royalty of materials etc. complete as per direction of the Engineering in charge. - River single/Bajri 30 % of total quantity

4.4

3566

810.51

... More
hard broken chips soiling stone other than granite (40mm to 90mm) 30 % of total quantity

4.4

4460

1013.76

... More
chips 40% of total quantity

5.86

12675

2163.1

... More
Supplying all materials, labour T&P for providing filling the foundation and plinth with sand well watered and rammed including cost, carriage & conveyance etc complete as per the direction of the Engineering in charge.

80.42

26022

323.58

... More
Supplying all materials, labour for covering the excavated surface area of the trench with good quality of polythin materials to prevent entries of soil particles in to the filter media and escape if water into subsurface soil & complete as per the direction of the Engineering in charge (including over lapping).

143.62

14362

100

... More
Supplying all materials, labour for cutting slotes on the G.I / PVC casing pipe in the trench portion for allowing water to enter the dry bore etc. complete as per the direction of the Engineering in charge.

352

35200

100

... More
Supplying all materials, labour , T&P for covering the sloted on the G.I / PVC casing pipe with good quality of mosuito net materials to allow in to the dry bore free from foreign material so as to avoid chocking & etc. complete as per the direction of the Engineer-in-charge

302

54360

180

... More
Supplying all material labour T & P for binding the special net over slotted GI / PVC casing pipe with good quality of nylon rope to provide proper covering of net etc all complete as per the direction of the Engineer in charge. Nylone rope -12 mm thick LS

8

1200

150

... More
Supplying all labour T & P material for Rigid & smooth centering ,shuttering for RCC work forwall of well steining, roof slab, lintel, chajja ,beam etc including false work and dismantling them after casting including cost, taxes and conveyance charges of all materials to work site for centering and shuttering and false work with supply of all labour and T & P complete as per the direction of Engineer in charge .

4.4

1031

234.47

... More
Supplying all labour T & P material for providing water seal in CC(1:2:4) using 12 mm size HG chips of approved quality and from approved quarry including wire and hoiting ,lowering and laying concrete in layers not exceeding 15 cm thick to the required level, ramming watering & curing etc. Complete including cost, taxes , royality and conveyance complete as per the direction of Engineer in charge

0.48

2451

5106.25

... More
Disposal of excavated earth by mechanical means Qty as per

96.92

8943

92.28

... More
Documentation of the works such as taking still photographs at different stages including videography if necessary, of the work and submitting the sam to the department in shape of an album.

2

300

150

... More
Design, drawing, construction, errection, testing & commissioning etc of RCC On Ground Sump of 20 KL capacity with dome shape covering using RCC M25 grade by supplying all materials, labour, equipment T & P including testing of soil to ascertain the SBC & other parameters required for design etc fitting & fixing of suitable medium grade GI pipe Tata/ Jindle make confirming to IS specification of required length CI/GI for in-let, out let, over flow& fixing of CI paddle collars on the wall of container etc all complete as per the direction of engineer-in-charge ( estimated cost Rs. 214531.00) - 2% on Approval of design drawing by the competent authority

1

4290

4290.62

... More
10 % on completion of structure upto ground level

1

21453

21453.1

... More
50% on completion of bottom dom

1

107265

107265.5

... More
38% on completion of 100% of the structure including testing and commissioning

1

81521

81521.78

... More
Supply of all labour T & P, material for soil testing, supply of design, drawing, construction, errection, testing & commissioning etc of RCC elevated storage reservoir of 30 Kl capacity ( 10 mtrs staging height) with dome using RCC M25, 2 nos. ISI marked suitable dia sluice valve , 1No of suitable dia butter fly valve & it’s RCC valve chambers as per approved drawing , supplying fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length from production well to ESR & ESR to distribution main including CI/GI for in-let, out let, over flow& washing line of ESR, RCC stair case with suitable dia structural stainless with suitable dia structural stainless steel hand rail around dome & landing etc. And stainless steel ladder outside & aluminium ladder inside, lightening arrester confirming to IS specification digital water level indicator. ( estimated cost Rs. 783952.25 ) - 2% on Approval of design drawing by the competent authority

1

15679

15679.05

... More
10 % on completion of structure upto ground level

1

78395

78395.23

... More
50% on completion of full wall height

1

391976

391976.13

... More
38% on completion of 100% of the structure including testing and commissioning

1

297901

297901.85

... More
COMPOUND WALL AT HEAD WORK SITE - Supplying all labour T & P for earth work for foundation in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge per 100 cum.

5.78

800

138.42

... More
Supplying all materials, labor, T&P for filling the foundation with sand watered and rammed with all cost, conveyance and royalities as per direction of Engineer-in-charge

1.28

414

323.58

... More
Supplying all labour T & P for cement Concrete (1:3:6) with 4cm size hard granite metal per 1cum as per direction of Engineer-in-charge

1.28

5115

3996.77

... More
Supplying all labour T & P for rigid and smooth centering, shuttering for R.C.C work including false works & dismantling them after casting including cost of materials complete in ground floor as per direction of Engineer-in-charge

6.08

591

97.28

... More
Supplying all labour T & P for R.C.C work of M-20 grade with 20mm and down grade black hard granite(crusher broken) stone chips including hoisting and laying as per direction of Engineer-in-charge

2.1

9713

4625.59

... More
I)Supplying all labour T & P for random rubble H.G stone Masonry in cement mortar (1:6) in foundation and plinth per 1 cum.

1.8

5114

2841.33

... More
Supplying all labour T & P for fitting & fixing uncoated HYSD Bar reinforcement including cutting, bending ,binding,shifting to site including cost of material etc complete as per the direction of Engineer-In-Charge.

1.47

7181

4885.47

... More
Supplying all labour T & P fo brick work in super structure with C.B bricks 23cm X 11cm X 8cm size having crushing strength not less than 75 Kg/cm² with dimensional tolerence ±8 percent in cement motar (1:6) for superstructure per 1 cum as per direction of Engineer-in-charge

14.2

47846

3369.5

... More
Supplying all labour T & P for 12mm thick cement plaster (1:6) on brick work per length of 50 mtr as per direction of Engineer-in-charge

126.75

12062

95.17

... More
Supplying all labour T & P for White washing two coats with shell lime per sqm as per direction of Engineer-in-charge

126.75

1221

9.64

... More
Supplying all labour T & P for finishing wall with water proofing cement paint of approved shade on new work two coat to give an even shade including cost of paint as per direction of Engineer-in-charge

126.75

3229

25.48

... More
GATE PILLAR of COMPOUND WALL Supplying all Labours, T&P etc. and materials for construction of two nos nasonary pillars to hold MS iron gate (2 fold) about 3 mtr wide excluding cost of gate etc all complete as per the direction of engineer-in- charge. - Supplying all labour T & P for Earth work for foundation in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge per 100 cum.

1.62

224

138.42

... More
Supplying all materials, Labours, T&P etc. and filling the foundation with sand watered and rammed including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.24

77

323.58

... More
Supplying all materials, Labours, T&P etc. and cement Concrete (1:3:6) with 4cm size hard granite metal including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.24

959

3996.77

... More
Supplying all materials, Labours, T&P etc. and random rubble H.G stone masonry in cement mortar(1:8) in foundation and plinth including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.83

2263

2726.99

... More
Supplying all materials, Labours, T&P etc. and 2.5cm Damp proof course with C.C (1:2:4) using 12mm size hard broken granite chips including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

0.72

154

214.43

... More
Supplying all materials, Labours, T&P etc. and brick work with K.B bricks 23cm x 11cm x 8 cm size having crushing strength not less than 35 kg/cm2 with dimensional tolerance ± 8 percent in cement in cement mortar including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

1.01

3403

3369.5

... More
Supplying all materials, Labours, T&P etc. and 12 mm thick cement plaster (1:6) on brick work including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

6.48

616

95.17

... More
Supplying all materials, Labours, T&P etc. and 20mm thick cement plaster (1:6) on stone work including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

1.32

151

115.1

... More
Supplying all materials, Labours, T&P etc. and fixing of nurali tile in cooping of compound wall pillar on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of tiles including rubbing & polishing including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

2.4

1057

440.74

... More
Supplying all materials, Labours, T&P etc. and White washing two coats with shell lime including all taxes, royalty, transportation charges as per specification and direction of Engineer-in-charge.

7.8

73

9.38

... More
Supply all labour T & P for MS door including making, fitting, fixing painting the gate with two coats of enamelled paint of approved colour all complete as per the direction of engineer-in-charge.

238

14280

60

... More
RISING DISTRIBUTION - Earth work excavation in all kinds of soil within 50M initial lead & 1.5M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.3m in depth & refilling the trench after laying of pipe line at the depth of 1.0 mtr trench for laying in trenches GI medium class pipe confirming to IS:-1239-2014 following nominal diameter as per specification complete providing lights, barriers, T&P & testing of pipes etc, including cost of pipe earth work etc all complete as per the direction of engineer in-charge. ( including 10% towards cost of fitting ) - 100 mm GI pipe(Medium class)

30

38490

1283

... More
80 mm GI pipe(Medium class)

390

364260

934

... More
Providing flanged joints to pipes & fittings of the following nominal diameters including testing & jointing, cost of bolts & nuts and rubber insertions as per specification. - 100mm dia Flanged Joints

5

1211

242.2

... More
80mm dia Flanged Joints

71

9556

134.6

... More
Earth work excavation in all kinds of soil within 50 M initial lead & 1.5 M initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm & laying in layers not exceeding 0.3m in depth & refilling the trench afterLaying in trenches HDPE pipes confirming to IS:4984 - 1995 and specials of the following outer dia and Class-4 to Class-5 and jointing by fusion welding method including testing as per specification, complete. -- 90 mm HDPE Pipe (1.402 kg/mtr)

650

283939

436.83

... More
Supply all labour T&P fitting and fixing of C.I sluice valves with double flanged ends in the water line for controlling purposes conforming to IS: 14846-2000 for the following rating and nominal diameters as per specifications complete of approved make with supply of all joining materials, T&P etc all complete including cost of all materials and fittings etc all complete as per direction of engineer-in-charge. 100 mm CI Sluice Valve

1

3974

3974

... More
80mm CI Sluice Valve

1

2858

2858

... More
Supply all labour T&P fitting and fixing of check type Reflux valves (Non return valves) with double flanged ends conforming to IS: 5312(part-I-2004) for water works purposes for the following rating and nominal diameter as per specification complete of approved make with supply of all Jointing materials, T&P etc all complete including cost of all materials and fittings etc all complete as per the direction of engineer-in-charge.80 mm NR Valve

3

8703

2901

... More
15 mm AIR VALVE WITH SHAFT PILLAR 1 No. - Supplying all labour T & P for earth work for foundation line in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge

0.42

58

138.42

... More
Supplying all materials , labour T & P for filling in foundation and plinths with sand well watered and rammed including cost,carriage & royality of all materials etc. all complete & as per direction of Engineer-In-Charge.

0.04

12

323.58

... More
Supplying all labour T & P for cement Concrete (1:2:4) with 12mm size hard granite metal per 1cum

0.04

204

5106.25

... More
Supplying all labour T & P materials providing RCC work of M-20 grade with 20 mm & down grade black hard granite crusher broken stone chips including hosting & laying cost, conveyance and royalty of materials etc. all complete as per the direction of Engineer-In-Charge

0.29

1341

4625.59

... More
Supplying all labour T & P for rigid and smooth centering, shuttering for R.C.C work including false works & dismantling them after casting including cost of materials complete in ground floor.

3.48

338

97.28

... More
Supplying all labour T & P for fitting & fixing uncoated HYSD Bar reinforcement including cutting, bending ,binding,shifting to site including cost of material etc complete as per the direction of Engineer-In-Charge.

0.26

1270

4885.47

... More
Supplying all labour T & P for 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment per 1 sqm

1.88

190

101.16

... More
Supplying all labour T & P for fitting of iron sheet cover made of 25mm MS sheet with nails are fixed to avoid monkey sitting it is complete as per the direction of Engineer-In-Charge.

1

1500

1500

... More
Supplying all labour T & P for 25 mm GI pipe with threading on both sides inside the RCC pillar with all fittings for air valve connection

2.8

587

209.74

... More
Add cost of air valve including fitting, fixing etc all complete as per the direction

1

1981

1981

... More
CONSTRUCTION OF VALVE CHAMBER Inside size -( 0.90x 0.90 x 1.30 mtr.) & outside size - ( 1.75 x 1.75 x 1.425 mtr.) 5 Nos - Supplying all labour T & P for earth work for foundation and plinth / pipe line in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of Engineer-in-charge .

21.8

3017

138.42

... More
Supplying all material labour for filling the fountaion with sand watered and rammed with all cost , conveyance and royalities as per direction of Engineer-in-charge

1.55

501

323.58

... More
Supplying all labour T & P materials providing C.C (1:3:6) with 40 mm. CBG metal including cost conveyance & royality of materials etc all complete as per direction of Engineer-in-charge

1.15

4596

3996.77

... More
Supplying all labour T & P for random rubble H.G stone Masonry in cement mortar (1:6) in foundation and plinth per 1 cum.

12.45

35374

2841.33

... More
Supplying all labour T & P for 2.5cm Damp proof course with C.C (1:2:4) using 12mm. Size hard broken granite chips per 1 sqm as per direction of Engineer-in-charge

9.6

2058

214.43

... More
Supplying all labour T & P for providing 12 mm thick cement plastering (1:6) over brick work as per direction of Engineer-in-charge

57.35

5458

95.17

... More
Cement punning For only inner side of valve chamber

33.45

721

21.56

... More
Supplying all labour, T & P materials for providing RCC work of M-20 RCC cover slab grade with 20 mm & down grade black hard granie crusher broken stone chips including hosting & laying cost conveyance and rayalty of materials etc. all complete as per direction of enginner-in-charge

2.65

12257

4625.59

... More
Supplying all labour T & P for cutting bending binding th M.S/ T.S rod for reinforcement of RCC works including cost of MS /TS rod with placing in proper position etc all complete

2.1

10259

4885.47

... More
Supplying all labour T & P fo Rigid and smooth centering for R.C.C works including false works and dismantling them after casting including cost of materials complete in ground floor.

5.7

554

97.28

... More
Supplying, all labour T&P earth work in all kinds of soil in excavation of foundation with in 50m initial lead & 1.50m initial lift including rough dressing & breaking clods to max 5cm to 7 cm & layers not exceeding 0.30mtr. in depth & as per direction of Engineer-in charge

4.08

564

138.42

... More
Supplying all materials, labor, T&P for filling the foundation with sand watered and rammed with all cost, conveyance and royalities.

1.29

417

323.58

... More
Supplying all labour T&P materials providing cement concrete (1:3:6) with 40mmCBG metals including cost, conveyance & royalty of materials etc. all complete.

1.62

6474

3996.77

... More
Supplying all labour T & P , materials providing PCC work, M 15 grade with 20 mm & down grade black hard granite hand broken chips etc all complete as per Engineer-In-Charge.

0.54

2201

4076.94

... More
Supplying all labour, T&P materials providing RCC work of M-20 grade with 20mm & down grade black hard granite hand broken stone chips including hosting & laying cost, conveyance and royalty of materials etc. all complete.

0.18

832

4625.59

... More
Supplying all labour, T&P for cutting, bending binding the M.S. / T.S. rod for reinforcement of RCC works including cost of M.S. / T.S. rod with placing in proper position etc., all complete

7.08

345

48.85

... More
Supplying all labour, T&P rigid & smooth Centering & Shuttering for RCC Works including false work & dismantling then after casting including cost of materials complete in ground floor.

7.41

720

97.28

... More
Supplying all labour, T&P materials providing 12 mm thick cement plastering in CM(1:6) including cost, conveyance & royalty of materials of stone masonry work.

14.28

1359

95.17

... More
Cement punning

14.28

307

21.56

... More
Supplying all labour T & P materials for fixing of PVC saddle with "O" ring, nuts, bolts excluding cost of materials etc as per specification complete for 80 mm to 315 mm dia pipes

3

627

209

... More
Supplying all labour T & P providing and laying in trenches ASTM pipes confirming to 1S 4985 class 1 V (10 kg/ sqcm) of following nominal Bore & Pipe fittings including cost of pipe & fittings and testing as per specifications complete (Earth works in trenches & refilling to be paid separately) i) 20 mm Ø ASTM pipes

18

1085

60.28

... More
Supplying all labour T & P providing and laying in trenches HDPE pipes conforming to IS 4985 class IV (10 Kg / sqcm) of the follwong nominal bore & pipe fittings including cost of fittings and testing as per direction of EIC (earthwork in trench & refilling to be paid separately - 20 mm GI Elbow

18

540

30

... More
20 mm GI union

3

180

60

... More
20 mm ×100 mm GI Nipple

3

90

30

... More
20 mm ×250 mm GI Nipple

3

240

80

... More
20 mm ×15 mm GI R Socket

3

150

50

... More
15 mm socket

3

120

40

... More
Supplying all labour T & P and materials fixing of 20 mm dia feruale IS 2692 -1978 bored including drilling of water main as per specification including cost of cementing materials

3

2178

726

... More
Cost of bib cock tap with polished bright of nominal size and as per direction of the department

3

645

215

... More
Dismantling the C.C roads and removing including stacking the useful materials for reuse and removing the debris within 50m. Lead including all labour & T&P required for the work complete as directed by the engineer in-charge.

13.5

5356

396.77

... More
Cement concrete (1:4:8) in foundation using 4 cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting,loweing and laying concrete, ramming, watering & curing etc. complete including cost, tax, royalty and conveyance charges of all materials to work site with supply of all labour and T & P required complete as directed by the Engineer-In-Charge.

9

33141

3682.39

... More
Cement concrete (1:2:4) in foundation using 4 cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting,loweing and laying concrete, ramming, watering & curing etc. complete including cost, tax, royalty and conveyance charges of all materials to work site with supply to work site and T & P required complete as directed by the Engineer-In-Charge.

4.5

22978

5106.25

... More
House hold connection 140 Nos - Earth work in excavation in All kinds of soil for pipe line trenches.

113.4

18207

160.56

... More
Refilling the trench with excavated materials

113.4

12138

107.04

... More
Supplying all labour for laying and fixing of PVC pipe of follwing size including all cost, taxes, conveyance etc. as per specification complete. (Earthwork in trenches to be paid for separately). - 20 mm HDPE pipe

840

18396

21.9

... More
15 mm GI pipe

140

18981

135.58

... More
Fiting & fixing of Brass Ferrule cock polished bright of the sizes 10 mm nominal dia including all cost, taxes, fitting & fixing etc. complete as per specification & direction of Engineer-in-charge. (01 Ferrule for 01 Nos. house)

140

35809

255.78

... More
Fiting & fixing of plastick Screw - down Bib Cocks (Taps) polished bright of the sizes 15 mm nominal dia including all cost, taxes, fitting & fixing etc. complete as per specification & direction of Engineer-in-charge.

140

11368

81.2

... More
Saddle for connection

140

31668

226.2

... More
STORAGE BASED STAND POST FOR GOVT. INSTITUTION 2 Nos - Earth work in excavation in all kinds of soil for pipe line trenches.

0.66

91

138.42

... More
Supplying all materials, labor, T&P for filling the foundation with sand watered and rammed with all cost, conveyance and royalities.

0.14

45

323.58

... More
Supplying all labour T&P materials providing cement concrete (1:3:6) with 40mmCBG metals including cost, conveyance & royalty of materials etc. all complete.

0.14

559

3996.77

... More
Supplying all labour, T&P materials providing RCC work of M-20 grade with 20mm & down grade black hard granite hand broken stone chips including hosting & laying cost, conveyance and royalty of materials etc. all complete.

0.68

3145

4625.59

... More
W.B.C.B. Brick masonry in cement mortar (1:6) in F & P using 23x11x8 cm size C.B. bricks including watering and curring with all cost of all materials etc complete in all respect.

0.3

1010

3369.5

... More
Providing uncoated Steel rienforcement to the RCC works including cost of rod.

0.54

2638

4885.47

... More
Centering and shutering for RCC works for wall of well steining, roof slab,lintel, chajja, beam etc, including false work and dismentalling them after casting including cost of all materials etc complete in all respect. - Column & beam

2.46

1369

556.86

3.54

1251

353.67

... More
12 mm thick cement plaster (1:4) over brick work finished smooth with cement punning including watering and curring with all cost of all materials etc complete in all respect.

10.54

1179

111.94

... More
Refilling the trench with excavated materials

0.34

31

92.28

... More
Supplying all materials,labour,T & P for fixing 1000 liters capacity PVC storage tank including cutting holes through the tank and supplying fixing mild steel tubes and fittings and providing extra socket, jamnut, ball valves etc. placing the tank to the required position immediately supporting all materials as per site requirement

2000

14000

7

... More
Supplying all labour and T & P for fixing Brass screw down stop cock / Gun metal full way valve of the following size as per specification all complete. - 1/2" Ferrule cock

2

2081

1040.86

... More
1" full way valve

2

1327

663.6

... More
Supplying all materials,labour,T & P for fixing to walls or ceiling and floor galvanised mild steel tubes conforming to (IS:1239) the following nominal diameter and fittings and clamps including making good to the damages including testing as per specification all complete - 15 mm dia GI pipe

20

4860

243

... More
20 mm dia GI pipe

10

2820

282

... More
25 mm dia GI pipe

40

14480

362

... More
MAINTAINCE OF PWS FOR 5YRS INCLUDING DEFECT LIABILITY PERIOD -- The contractor shall provide all labour T & P, mchinary etc all complete required for repair & maintenance of the PWS project for Five(5) calendar years from the completion date of including liability period of one year in such a manner that all the public stand post and house connection of the PWS Scheme covered area will get (adequate) required quantity of water without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN and direction of engineer-in-charge.

5

225690

45138



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.