Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Water Supply And Sanitation Department - RWSS Tender

Civil And Construction
Road Construction
Opening Date8 Jan 2019
Closing Date15 Jan 2019
Tender Amount₹ 40,06,930 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying all labour, T&P and materials for earth work excavation in foundation in stoney earth with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge.

23.02

4824

209.6

... More
Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

4.6

18407

4001.6

... More
Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge.

23.02

60535

2629.7

... More
Supplying all labour, T&P and materials and providing 1" thick D.P.C. over stone metal with cost, conveyance, tax, royalty of materials required and as per specification and direction of the Engineer-in-charge.

18.41

4228

229.7

... More
Supplying all labour, T&P and materials and providing brick work with C.B Bricks in c.m (1:6) in superstructure using well burnt C.B bricks of size 23cm x 11cm x 8cm including cost, conveyance, royalty of all materials as per specification and direction of the Engineer-in-charge.

14.55

49170

3379.4

... More
Cost of MS Grill Gate

67.5

4185

62

... More
Labour for fitting & fixing M.S. choukath to door & windows including making holes in the brick wall and fixing the clamps by using C.C (1:2:4) by using 12mm. size h.b.g chips with all cost, conveyance, labour, T&P etc., required for the work complete as per the direction of the Engineer-in-charge

2.25

101

45

... More
Supplying all labour, T&P and materials and providing 12mm (1/2") thick cement plaster (1:6) finished smooth with cost and conveyance of all materials as per specification and direction of the Engineer-in-charge.

123.66

12922

104.5

... More
Supplying all labour, T&P and materials and providing 20mm. thick cement plaster in cement mortar (1:6) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge.

36.83

5833

158.4

... More
Supplying all labour, T&P and materials and finishing walls with cement paint of approved paint over a coat of white wash with good shell lime with cost, conveyance, royalties and taxes of all the materials and labour with T&P required for the work etc, complete in all respect in all floors as per specification and direction of the Engineer-in-charge.

160.49

4188

26.1

... More
Supplying all labour, T&P and materials and painting two coats with any approved paint to new iron work including paint sand papering, polishing the surface, with cost conveyance and taxes of all materials and labour with T&P required for the work etc, complete in all respect as per specification and direction of the Engineer-in-charge.

1.13

154

136.3

... More
Earth work excavation in foundation in all kinds of soil with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. below bed level.

15.9

2311

145.4

... More
Filling foundation and plinth with sand in 15 cms (9") thick layer etc. complete including cost conveyance royalty of taxes etc all complete.

1.35

438

325.1

... More
Providing cement concerte (1:3:6) with 4 cm size hg metal including cost , carriage, taxes of all materials and cost of all labour & T&P etc. complete.

2.03

8862

4365.7

... More
Supplying all materials, labour, T&P and providing for use of tarfelt paper or thick polythene to separete main concrete of foundation and lean compete foundation etc complete as directed by the Engineer-in-charge.

14.88

1041

70

... More
Supplying all materials, labour and T&P and providing M 25 work using 20 mm and down grade size hard black broken granite stone chips including cost conveyance taxes and royalty of all materials and labour with T&P required for the work etc, complete in all respect but excluding cost of MS rods.

6.34

33370

5263.5

... More
Supplying all materials, labour T&P and providng rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting including cost of materials etc.

-

-

-

... More
Below GL, Base slab

2

692

346.2

... More
Wall out side

17.59

8124

461.9

... More
Filter media bottom slab

10.06

3482

346.2

... More
Above GL Wall

21.95

10138

461.9

... More
Cover slab

8.14

2818

346.2

... More
Supplying all labour T&P for cutting, bending, binding & placing uncoated HYSD bar rainforcement including cost of MS rod & binding wire etc complete as per the direction of the Engineer in Charge

5.54

36113

6518.6

... More
Supplying all materials, labour, T&P and providing 20mm thick cement plaster (1:4) finished smooth with cost and conveyance of all materials as per specification and direction of the Engineer-in-charge.

80.68

13683

169.6

... More
Supplying all labour T&P material for Cement punning finished smooth to all side after raking out the joint including watering and quring with cost conveyance royalty etc complete as directed by the Engineer-in-charge.

71.42

1514

21.2

... More
Supplying all labour T&P materials for refilling foundation with exacavated materials including watering and ramming etc complete as directed by the Engineer-in-charge.

4.2

339

80.8

... More
Supplying all labour T&P materials for filling trenches with hard broken soling stone otherthan grinite (40mm to 50mm), charcoal materials with all cost and conveyance royalty as per Engineer-in-charge.

-

-

-

... More
Fine sand

1.61

523

325.1

... More
Coarse

2.41

1122

465.8

... More
Charcoal

0.8

64000

80000

... More
20 mm Metal

1.61

2094

1300.98

... More
40 mm Metal

1.61

1787

1110.5

... More
Fixing of 80 mm flanged GI pipe for out let and inlet connection of spring chamber including all fitting fixing etc complete as per direction of Engineer in Charge

-

-

-

70

62993

899.9

... More
Outlet

10

8999

899.9

... More
Providing fitting & fixing of CI M.H Cover

1

2016

2016

... More
Cost of 4 no.s of 80 mm dia CI puddle collar

3

6951

2317

... More
SITE DEVELOPMENT

-

-

-

... More
Supplying all labour T&P and materials for spreading or dressing of muroom work with cost conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer in Charge.

-

-

-

... More
80% moorum

27.99

8162

291.62

... More
20% Sand

6.99

1598

228.67

... More
Providing cement concrete (1:3:6) with 4cm size h.b.g. Metal inclduing cost, carriage taxes of all materials and cost of all labour T&P etc complete

13.13

57321

4365.7

... More
Supplying all labour T&P and providing cement concrete (1:2:4) in foundation & plinth with 12 mm Hg stone chips with cost conveyance royality taxes etc. complete as per direction of EIC

26.25

146076

5564.8

... More
CONSTRUCTION OF RAIN WATER DIVERTION

-

-

-

... More
Supplying all labour, T&P and materials for earth work excavation in foundation in all kinds of soil with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge.

27

3925

145.4

... More
Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

2.25

9003

4001.6

... More
Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge.

9

23667

2629.7

... More
Supplying all materials, labour T&P providing 20mm thick cement plaster (1:4) finished smoothincluding punning to out side of walls after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge.

60

10176

169.6

... More
CONSTRUCTION OF WALK WAY

-

-

-

... More
Supplying all labour, T&P and materials for earth work excavation in foundation in stoney earth with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge.

20

2908

145.4

... More
Supplying all materials, labour, T&P providing rough dry Stone packing with granite stone of 15cm. to 30cm (1 cuft) and above weighing 140 lbs. to 160 lbs./cuft quarried, free from weathered surface of approved quarry including splays cutting, moulding where necessary & including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge.

12

13216

1101.4

... More
Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

3

12004

4001.6

... More
Supplying all materials, labour, T&P and providing C.C. (1:2:4) work using 12mm size hard black broken granite stone chips including cost, conveyance, royalty & taxes etc, complete in all respect but excluding cost of M.S. Rods or Tor Steel and binding wires as per specification and direction of the Engineer-in-charge.

1.5

8347

5564.8

... More
LAYING OF RISINGMAIN

-

-

-

... More
Earth work in excavation of trenches for laying of pipe line including dressing, leveling the bed upto required depth & within initial lead of 50mtrs & 1.5mtrs initial lift breaking clods to maximum size (5 to 7cm) laying in layers not exceeding 0.30mtrs in depth etc. complete including cost of all labour, T&P, pipes, fittings and specials etc.required for completion of the item as per specification & direction of Engineer in charge.

-

-

-

... More
In stoney earth & gravel mixed (2200 mtr x 0.38mtr x 0.90mtr)

752.4

157703

209.6

... More
Supplying all materials including HDPE pipes, fittings and specials, labour, T&P for laying in trenches unplasticised HDPE pipes of the following outside diameter for all classes and specials as required at site, including jointing with solvent cement by non heat application method excluding the cost of earth work in excavation but including the cost of pipes cost of fitting and specials & testing the pipe line etc. all complete as per direction of Engineer-in-charge.

-

-

-

... More
90mm HDPE pipe PE-80 PN -8

2200

1145540

520.7

... More
Supplying all labour, T&P for filling in pipe line trenches with excavated materials including watering etc., all complete including proper care to the laid pipe lines to prevent damages of pipes and specials as per the direction of Engineer-in-charge.

-

-

-

... More
In stoney earth & gravel mixed (2200 mtr x 0.38mtr x 0.90mtr)

752.4

87955

116.9

... More
Supplying C.I double-flanged valves with hand wheel of following mentioned dia., all labour T&P and jointing materials and fitting and fixing the valves in proper position in the pipe line as per the direction of the Engineer-in-Charge.

-

-

-

... More
80 mm CI Sluice Valve IS-14846/2000, PN-1.00

2

5178

2589.4

... More
15mm CI Single Air Valve IS 14845/2000

3

3580

1193.4

... More
Supplying all labour, material, T&P and constructing brick masonry valve chambers of following mentioned inetrnal dimension, complete with C.C (1:4:8) with 40 mm size hbg metal at the bottom, C.B brick masonry in c.m(1:4) with internal plastering and R.C.C top cover with C.C(1:2:4) with 12mm size hbg metal & MS Rod 0.85qntl per 1 cum and with 12mm thick cement plaster (1:4) complete in all respect as per the direction of the Engineer-in-charge.

-

-

-

... More
SluiceValve/NR Valve Chamber (Size 0.90mtr x 0.90 mtr x 1.15 mtr)

2

17260

8630

... More
Air Valve Chamber(Size 0.62mtr x 0.62mtr x 1.15mtr)

2

12248

6124

... More
Supplying all labour, T&P and cutting existing built-up road for laying of pipe line and making good to the damage as per approved design and specification.

-

-

-

... More
Asphalt Road

7.6

1885

248.1

... More
LAYING OF DISTRIBUTION SYSTEM

-

-

-

... More
Earth work in excavation of trenches for laying of pipe line including dressing, leveling the bed upto required depth & within initial lead of 50mtrs & 1.5mtrs initial lift breaking clods to maximum size (5 to 7cm) laying in layers not exceeding 0.30mtrs in depth etc. complete including cost of all labour, T&P, pipes, fittings and specials etc.required for completion of the item as per specification & direction of Engineer in charge.

-

-

-

... More
In all kinds of soil (750mtr x 0.38mtr x 0.90mtr) 2(90mtr x 0.30mtr x 0.45mtr)

280.8

40828

145.4

... More
In stoney earth & gravel mixed (380 mtr x 0.38mtr x 0.90mtr)

129.96

27239

209.6

... More
Supplying all materials including HDPE pipes, fittings and specials, labour, T&P for laying in trenches unplasticised HDPE pipes of the following outside diameter for all classes and specials as required at site, including jointing with solvent cement by non heat application method excluding the cost of earth work in excavation but including the cost of pipes cost of fitting and specials & testing the pipe line etc. all complete as per direction of Engineer-in-charge.

-

-

-

... More
110mm HDPE pipe PE-80 PN -8

350

258790

739.4

... More
90mm HDPE pipe PE-80 PN -8

780

406146

520.7

... More
Transporting and supplying all materials, labour T&P, fabricatting, fitting and fixing with specials at the site using Electric resistance welded pipes of reputed make (TATA/Jindal/Sail), confirming to IS 1239 (P-1) 2004, IS 1978 & IS 3598, medium quality & standard weight, including cutting the pipes & flanges, drilling the bolt holes in the flanges, matching the pipes and flanges and jointing with proper gradient & alignement, welding with arc welding using electrodes with power generated by using mobile diesel generator set, etc. complete as per direction of Engineer in charge, including painting two coats with black anticorrosive paint over one coat of primer, all cost, conveyance, taxes of paints, cost of fittings at 'T', Bend, Offsets, Nuts and bolts, Leather packing etc. but excluding the cost of flanges and required earthwork, cutting holes in masonary at work site as per the direction of Engineer in Charge.

-

-

-

... More
15 mm dia G.I. pipe

45

6345

141

... More
Supplying all labour, T&P for filling in pipe line trenches with excavated materials including watering etc., all complete including proper care to the laid pipe lines to prevent damages of pipes and specials as per the direction of Engineer-in-charge.

-

-

-

... More
In all kinds of soil (750mtr x 0.38mtr x 0.90mtr) 2(90mtr x 0.30mtr x 0.45mtr)

280.8

22688

80.8

... More
In stoney earth & gravel mixed (380 mtr x 0.38mtr x 0.90mtr)

129.96

15192

116.9

... More
Supplying C.I double-flanged valves with hand wheel of following mentioned dia., all labour T&P and jointing materials and fitting and fixing the valves in proper position in the pipe line as per the direction of the Engineer-in-Charge.

-

-

-

... More
100 mm CI Sluice Valve IS- 14846/2000 PN-1.00

1

3694

3694.1

... More
80 mm CI Sluice Valve IS-14846/2000, PN-1.00

5

12947

2589.4

... More
15mm CI Single Air Valve IS 14845/2000

1

1193

1193.4

... More
Supplying all labour, material, T&P and constructing brick masonry valve chambers of following mentioned inetrnal dimension, complete with C.C (1:4:8) with 40 mm size hbg metal at the bottom, C.B brick masonry in c.m(1:4) with internal plastering and R.C.C top cover with C.C(1:2:4) with 12mm size hbg metal & MS Rod 0.85qntl per 1 cum and with 12mm thick cement plaster (1:4) complete in all respect as per the direction of the Engineer-in-charge.

-

-

-

... More
SluiceValve/NR Valve Chamber (Size 0.90mtr x 0.90 mtr x 1.15 mtr)

6

51780

8630

... More
Air Valve Chamber(Size 0.62mtr x 0.62mtr x 1.15mtr)

1

6124

6124

... More
Supplying all labour, T&P and cutting existing built-up road for laying of pipe line and making good to the damage as per approved design and specification.

-

-

-

... More
Concrete Road

57

26311

461.6

... More
Asphalt Road

15.2

3771

248.1

... More
Metalled Road

19

4206

221.4

... More
Supplying all labour T&P laying of pipe line to each house hold including cost of PVC/GI pipe, saddle of required size, 1/8" (3mm) brass ferrule and bib cock at the end of supply line including excavation trenches and making good the damages etc complet as per direction of Engineer in Charge as approved design and specification.

90

90000

1000

... More
Supplying all labour, T&P and materials and making provision of water supply to GP / AWC / Pry. Schools with the provision of overhead tanks etc. complete as as per approved design and specification.

3

59355

19785

... More
Supplying all materials labour,T&P for construction of RCC pillar type of single mouth public stand post with earth work in excavation in all kinds of soil providing bed concrete of 0.15 mtr. Thick with C.C (1:4:8) 4cm sizeH.G metal RCC (1:2:4) using 12mm HG chips pillar size 0.30x0.30x1.25m providing C.C (1:2:4) using 12mm H.G chips eith 10 mm thick for plat form of size 1.00 M x1.00 M & leading drain of 2M long and providing glazed tile in stand post pilar & granite piece of 0.60 x 0.60 m size in the plat from etc. all complete as per approved drawing design & specification of as per direction of EIC.

2

29738

14869

... More
Transporting and supplying all materials, labour T&P, fabricatting, fitting and fixing with specials at the site using Electric resistance welded pipes of reputed make (TATA/Jindal/Sail), confirming to IS 1239 (P-1) 2004, IS 1978 & IS 3598, medium quality & standard weight, including cutting the pipes & flanges, drilling the bolt holes in the flanges, matching the pipes and flanges and jointing with proper gradient & alignement, welding with arc welding using electrodes with power generated by using mobile diesel generator set, etc. complete as per direction of Engineer in charge, including painting two coats with black anticorrosive paint over one coat of primer, all cost, conveyance, taxes of paints, cost of fittings at 'T', Bend, Offsets, Nuts and bolts, Leather packing etc. but excluding the cost of flanges and required earthwork, cutting holes in masonary at work site as per the direction of Engineer in Charge.

-

-

-

... More
80 mm dia G.I. pipe

60

53994

899.9

... More
80 mm dia GI. Long Bend.

5

3400

680

... More
80 mm dia . G.I. flange

15

3375

225

... More
100 mm dia G.I. pipe

45

57222

1271.6

... More
100 mm dia GI. Long Bend.

5

4750

950

... More
100 mm dia . G.I. flange

13

4810

370

... More
FIVE YEARS MAINTENANCE

-

-

-

... More
Cost of Opernation & maintenance

5

201735

40347



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.