Rural Water Supply And Sanitation Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Rural Water Supply And Sanitation Department - RWSS Tender
Civil And Construction
Excavation
Eprocure
Opening Date29 Jun 2022
Closing Date13 Jul 2022
Tender Amount₹ 2,25,10,171
Costs
EMD
Refer DocumentsDocument Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RWSS_79287_1Bid Award Id
ViewTender No
RWSS_MKG_ONLINE_01/2022-23Tender Authority
Rural Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://https://rayagada.nic.in/rural-water-supply-sanitation/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
RPWS to Village SARKUBANDHA: Supplying all labour, T&P, material and soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of RCC ESR of 30000 ltrs capacity with necessary staging height of 15 mtr consisting of 6 nos RCC columns and spherical dome using R.C.C M-25, 2nos ISI marked 100mm dia CI sluice valve, 1no of 100mm dia butter fly valve & it's RCC valve chambers as per approved drawing, supplying, fitting & fixing of 100mm dia medium grade GI pipe Tata/Jindal make confirming to IS specification of required length to ESR & ESR to distribution main including CI/GI in-let, out-let, over flow & washing line (double flanged CI column pipe) of ESR, RCC stair case with 32mm dia structural stainless steel hand rail around dome and landing etc. and stainless steel ladder inside and outside the ESR, lightening arrester confirming to IS specification, digital water level indicator, 100mm dia CI puddle collar, 0.6 m dia CI manhole cover at dome, RCC vent with brass jally etc. complete as per direction of the EIC. (The contractor shall execute the work after preparing the design and detail drawing in 5 sets from qualified Engineer and to approve all structural design & drawing from State Technical Agency (STA) IGIT, Saranga/ CET, BBSR/ VSSUI, Burla/ NIT, Rourkela/ IIT, BBSR at his own cost) as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN
1
-
-
RPWS to Village SARKUBANDHA: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.
1
-
-
RPWS to Village SUAPALLI: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village SUAPALLI. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.
1
-
-
RPWS to Village SUAPALLI: Supply, fitting & fixing of Circular hopper bottom fibre tank supported with galvanized rod duly fixed over the ground through suitable foundation and nut and bolt having hole arrangement at the bottom to remove the bleaching residuals fitted with power agitator to stir the solution and having suitable arrangement for decantation to another fibre covered container fitted with a suitable reciprocating dozing pump to feed the solution to the distribution main after ESR including installations for providing residual Chlorine 2ppm at the tail end Including all taxes, transportation etc. unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge
1
-
-
RPWS to Village SUAPALLI: Supplying all labour, T&P, material and soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of RCC ESR of 30000 ltrs capacity with necessary staging height of 15 mtr consisting of 6 nos RCC columns and spherical dome using R.C.C M-25, 2nos ISI marked 100mm dia CI sluice valve, 1no of 100mm dia butter fly valve & it's RCC valve chambers as per approved drawing, supplying, fitting & fixing of 100mm dia medium grade GI pipe Tata/Jindal make confirming to IS specification of required length to ESR & ESR to distribution main including CI/GI in-let, out-let, over flow & washing line (double flanged CI column pipe) of ESR, RCC stair case with 32mm dia structural stainless steel hand rail around dome and landing etc. and stainless steel ladder inside and outside the ESR, lightening arrester confirming to IS specification, digital water level indicator, 100mm dia CI puddle collar, 0.6 m dia CI manhole cover at dome, RCC vent with brass jally etc. complete as per direction of the EIC. (The contractor shall execute the work after preparing the design and detail drawing in 5 sets from qualified Engineer and to approve all structural design & drawing from State Technical Agency (STA) IGIT, Saranga/ CET, BBSR/ VSSUI, Burla/ NIT, Rourkela/ IIT, BBSR at his own cost) as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN
1
-
-
RPWS to Village SUAPALLI: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.
1
-
-
RPWS to Village ELEMPAKA: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village ELEMPAKA. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.
1
-
-
RPWS to Village ELEMPAKA: Supply, fitting & fixing of Circular hopper bottom fibre tank supported with galvanized rod duly fixed over the ground through suitable foundation and nut and bolt having hole arrangement at the bottom to remove the bleaching residuals fitted with power agitator to stir the solution and having suitable arrangement for decantation to another fibre covered container fitted with a suitable reciprocating dozing pump to feed the solution to the distribution main after ESR including installations for providing residual Chlorine 2ppm at the tail end Including all taxes, transportation etc. unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge
1
-
-
RPWS to Village ELEMPAKA: Supplying all labour, T&P, material and soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of RCC ESR of 30000 ltrs capacity with necessary staging height of 15 mtr consisting of 6 nos RCC columns and spherical dome using R.C.C M-25, 2nos ISI marked 100mm dia CI sluice valve, 1no of 100mm dia butter fly valve & it's RCC valve chambers as per approved drawing, supplying, fitting & fixing of 100mm dia medium grade GI pipe Tata/Jindal make confirming to IS specification of required length to ESR & ESR to distribution main including CI/GI in-let, out-let, over flow & washing line (double flanged CI column pipe) of ESR, RCC stair case with 32mm dia structural stainless steel hand rail around dome and landing etc. and stainless steel ladder inside and outside the ESR, lightening arrester confirming to IS specification, digital water level indicator, 100mm dia CI puddle collar, 0.6 m dia CI manhole cover at dome, RCC vent with brass jally etc. complete as per direction of the EIC. (The contractor shall execute the work after preparing the design and detail drawing in 5 sets from qualified Engineer and to approve all structural design & drawing from State Technical Agency (STA) IGIT, Saranga/ CET, BBSR/ VSSUI, Burla/ NIT, Rourkela/ IIT, BBSR at his own cost) as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN
1
-
-
RPWS to Village ELEMPAKA: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.
1
-
-
RPWS to Village TONTAPALLY: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village TONTAPALLY. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.
1
-
-
RPWS to Village TONTAPALLY: Supply, fitting & fixing of Circular hopper bottom fibre tank supported with galvanized rod duly fixed over the ground through suitable foundation and nut and bolt having hole arrangement at the bottom to remove the bleaching residuals fitted with power agitator to stir the solution and having suitable arrangement for decantation to another fibre covered container fitted with a suitable reciprocating dozing pump to feed the solution to the distribution main after ESR including installations for providing residual Chlorine 2ppm at the tail end Including all taxes, transportation etc. unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge
1
-
-
RPWS to Village TONTAPALLY: Supplying all labour, T&P, material and soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of RCC ESR of 30000 ltrs capacity with necessary staging height of 15 mtr consisting of 6 nos RCC columns and spherical dome using R.C.C M-25, 2nos ISI marked 100mm dia CI sluice valve, 1no of 100mm dia butter fly valve & it's RCC valve chambers as per approved drawing, supplying, fitting & fixing of 100mm dia medium grade GI pipe Tata/Jindal make confirming to IS specification of required length to ESR & ESR to distribution main including CI/GI in-let, out-let, over flow & washing line (double flanged CI column pipe) of ESR, RCC stair case with 32mm dia structural stainless steel hand rail around dome and landing etc. and stainless steel ladder inside and outside the ESR, lightening arrester confirming to IS specification, digital water level indicator, 100mm dia CI puddle collar, 0.6 m dia CI manhole cover at dome, RCC vent with brass jally etc. complete as per direction of the EIC. (The contractor shall execute the work after preparing the design and detail drawing in 5 sets from qualified Engineer and to approve all structural design & drawing from State Technical Agency (STA) IGIT, Saranga/ CET, BBSR/ VSSUI, Burla/ NIT, Rourkela/ IIT, BBSR at his own cost) as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN
1
-
-
RPWS to Village TONTAPALLY: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.
1
-
-
N.B: The amount put to tender is exclusive of 12% GST. The intending bidders should offer their rate which shall be exclusive of GST as per norms. GST applicable onwards contract shall be paid over the bill amount at the time of payment of each bill.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements