Rural Water Supply And Sanitation Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Water Supply And Sanitation Department - RWSS Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date10 May 2022
Closing Date31 May 2022
Tender Amount₹ 4,02,78,110 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Design, drawing, constuction errection, testing and commissioning of 50000 ltr. capacity RCC OGR as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

300000

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.(Annexure-I)

1

-

297740

... More
Village -NARANPUR

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof Pump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation of voltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village NARANPUR materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN & all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system .

1

-

3373825.21

... More
Design, drawing, constuction errection, testing and commissioning of 1 nos 30000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with speherical dome) with RCC stair case as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

1481800

... More
Design, drawing, constuction errection, testing and commissioning of 50000 ltr. capacity RCC OGR as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

300000

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.(Annexure-I)

1

-

257781

... More
Village - RANISAHI

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof Pump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation of voltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village RANISAHI. All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN & all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system .

1

-

8062521.33

... More
Design, drawing, constuction errection, testing and commissioning of 1 nos 50000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with speherical dome) with RCC stair case as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

1808600

... More
Design, drawing, constuction errection, testing and commissioning of 2 Nos of 50000 ltr. capacity RCC OGR as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

600000

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.(Annexure-I)

1

-

523593

... More
Village - RAGHUNATHPUR

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof Pump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation of voltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village RAGHUNATHPUR All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN & all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system .

1

-

7361155.73

... More
Design, drawing, constuction errection, testing and commissioning of 1 nos 30000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with speherical dome) with RCC stair case as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

1481800

... More
Design, drawing, constuction errection, testing and commissioning of 2 Nos of 50000 ltr. capacity RCC OGR as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

600000

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.(Annexure-I)

1

-

472148

... More
Village - LUPUNG

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof Pump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation of voltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village LUPUNG All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN & all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system .

1

-

5328123.74

... More
Design, drawing, constuction errection, testing and commissioning of 1 nos 40000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with speherical dome) with RCC stair case as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

1707500

... More
Design, drawing, constuction errection, testing and commissioning of 1 No of 50000 ltr. capacity RCC OGR as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Annexure-H)

1

-

300000

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.(Annexure-I)

1

-

366741

... More
GST will be paid extra as applicable on production of Invoice

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.