Rural Water Supply And Sanitation Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Water Supply And Sanitation Department - RWSS Tender

Manpower Supply
Eprocure
Opening Date24 Jan 2022
Closing Date14 Feb 2022
Tender Amount₹ 3,78,86,071 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RPWS to Village PETAL: Supply of all labour T & P, material for soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of 30000 liter capacity RCC Elevated Storage Reservoir with spherical dome of 15.0 Mtr staging using RCC M25, 2 nos. ISI marked suitable dia sluice valve, 1No of suitable dia butter fly valve & it’s RCC valve chambers as per approved drawing, supplying fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length from percolation well to ESR & ESR to distribution main including CI/GI for in-let, out let, over flow& washing line of ESR, RCC stair case with suitable dia structural stainless with suitable dia structural stainless steel hand rail around dome & landing etc. and stainless steel ladder outside & aluminium ladder inside, lightening arrester confirming to IS specification digital water level indicator all complete as per specification with including cost, taxes and carriage of all materials etc. all complete and as per the direction of IEC

1

-

-

... More
RPWS to Village PETAL: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
RPWS to Village DUDHAPALLI: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village DUDHAPALLI. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.

1

-

-

... More
RPWS to Village DUDHAPALLI: Supplying all materials, labour, T&P etc. and construction, testing & commissioning of the treatment unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge

1

-

-

... More
RPWS to Village DUDHAPALLI: Supply of all labour T & P, material for soil testing, Design, drawing, construction, errection, testing & commissioning etc of 30000 liter capacity RCC On Ground reservoir OR Sump of different capacity with dome shape covering using RCC M25 grade by supplying all materials, labour, equipment T & P including testing of soil to ascertain the SBC & other parameters required for design etc fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length CI/GI for in-let, out let, over flow& fixing of CI paddle collars on the wall of container etc all complete as per the direction of Engineer-in-charge

1

-

-

... More
RPWS to Village DUDHAPALLI: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
RPWS to Village KADALIBANDHA: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village KADALIBANDHA. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.

1

-

-

... More
RPWS to Village KADALIBANDHA: Supplying all materials, labour, T&P etc. and construction, testing & commissioning of the treatment unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge

1

-

-

... More
RPWS to Village KADALIBANDHA: Supply of all labour T & P, material for soil testing, Design, drawing, construction, errection, testing & commissioning etc of 20000 liter capacity RCC On Ground reservoir OR Sump of different capacity with dome shape covering using RCC M25 grade by supplying all materials, labour, equipment T & P including testing of soil to ascertain the SBC & other parameters required for design etc fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length CI/GI for in-let, out let, over flow& fixing of CI paddle collars on the wall of container etc all complete as per the direction of Engineer-in-charge

1

-

-

... More
RPWS to Village KADALIBANDHA: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
RPWS to Village NAGLUR: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village NAGLUR. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.

1

-

-

... More
RPWS to Village NAGLUR: Supplying all materials, labour, T&P etc. and construction, testing & commissioning of the treatment unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge

1

-

-

... More
RPWS to Village NAGLUR: Supply of all labour T & P, material for soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of 50000 liter capacity RCC Elevated Storage Reservoir with spherical dome of 12.0 Mtr staging using RCC M25, 2 nos. ISI marked suitable dia sluice valve, 1No of suitable dia butter fly valve & it’s RCC valve chambers as per approved drawing, supplying fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length from percolation well to ESR & ESR to distribution main including CI/GI for in-let, out let, over flow& washing line of ESR, RCC stair case with suitable dia structural stainless with suitable dia structural stainless steel hand rail around dome & landing etc. and stainless steel ladder outside & aluminium ladder inside, lightening arrester confirming to IS specification digital water level indicator all complete as per specification with including cost, taxes and carriage of all materials etc. all complete and as per the direction of IEC

1

-

-

... More
RPWS to Village NAGLUR: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
RPWS to Village SANAPAPULUR: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village SANAPAPULUR. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.

1

-

-

... More
RPWS to Village SANAPAPULUR: Supplying all materials, labour, T&P etc. and construction, testing & commissioning of the treatment unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge

1

-

-

... More
RPWS to Village SANAPAPULUR: Supply of all labour T & P, material and soil testing, supply of design, drawing, construction, errection, testing & commissioning etc of 30000 liter capacity RCC elevated storage reservoir with spherical dome of 12 mtr staging with dome using RCC M25, 2 nos. ISI marked suitable dia sluice valve, 1No of suitable dia butter fly valve & it’s RCC valve chambers as per approved drawing, supplying fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length to ESR & ESR to distribution main including CI/GI for in-let, out let, over flow & washing line of ESR, RCC stair case with suitable dia structural stainless with suitable dia structural stainless steel hand rail around dome & landing etc. and stainless steel ladder outside & aluminium ladder inside, lightening arrester confirming to IS specification, digital water level indicator including cost, taxes and carriage of all materials etc. all complete and as per the direction of IEC

1

-

-

... More
RPWS to Village SANAPAPULUR: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
RPWS to Village ORGEL: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village ORGEL. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.

1

-

-

... More
RPWS to Village ORGEL: Supplying all materials, labour, T&P etc. and construction, testing & commissioning of the treatment unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge

1

-

-

... More
RPWS to Village ORGEL: Supply of all labour T & P, material and soil testing, supply of design, drawing, construction, errection, testing & commissioning etc of 30000 liter capacity RCC elevated storage reservoir with spherical dome of 12 mtr staging using RCC M25, 2 nos. ISI marked suitable dia sluice valve, 1No of suitable dia butter fly valve & it’s RCC valve chambers as per approved drawing, supplying fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length to ESR & ESR to distribution main including CI/GI for in-let, out let, over flow & washing line of ESR, RCC stair case with suitable dia structural stainless with suitable dia structural stainless steel hand rail around dome & landing etc. and stainless steel ladder outside & aluminium ladder inside, lightening arrester confirming to IS specification digital water level indicator including cost, taxes and carriage of all materials etc. all complete and as per the direction of IEC

1

-

-

... More
RPWS to Village ORGEL: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
RPWS to Village KANKRIPADA: Supplying all materials, labour, T&P, construction of RCC Roof building Pump House, Compound wall for Head work & ESR, site development, supply, laying, testing and commissioning of Rising main & Distribution system pipe line such as HDPE, ASTM, D.I, G.I pipe lines etc. along with required fittings & specials with Functional House hold Tap Connection (FHTC), construction & fitting of RCC Sluice Valve Chamber, Air Valve Chamber, public stand post, , Stand alone, storage tank, Supply & Installation of Chlorination system, supply & installation of submersible Pump Motor in deep Tube well etc. (including supply of stand by pump motor), internal wiring of Pump house etc. as per supplied drawings and detail scope of work & technical specification, quantity of work mentioned as per the Annexure of Village KANKRIPADA. All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer-in-Charge. All work shall be completed in such a manner that all house hold of entire PWS area (Village/ Habitations) will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system.

1

-

-

... More
RPWS to Village KANKRIPADA: Supplying all materials, labour, T&P etc. and construction, testing & commissioning of the treatment unit as per detailed scope of work & technical specification mentioned in Section- 5 of DTCN complete as per direction of Engineer-in-Charge

1

-

-

... More
RPWS to Village KANKRIPADA: Supply of all labour T & P, material for soil testing, supply of design, drawing, construction, errection, testing & commissioning etc. of 50000 liter capacity RCC Elevated Storage Reservoir with spherical dome of 12.0 Mtr staging using RCC M25, 2 nos. ISI marked suitable dia sluice valve, 1No of suitable dia butter fly valve & it’s RCC valve chambers as per approved drawing, supplying fitting & fixing of suitable medium grade GI pipe make confirming to IS specification of required length from percolation well to ESR & ESR to distribution main including CI/GI for in-let, out let, over flow& washing line of ESR, RCC stair case with suitable dia structural stainless with suitable dia structural stainless steel hand rail around dome & landing etc. and stainless steel ladder outside & aluminium ladder inside, lightening arrester confirming to IS specification digital water level indicator all complete as per specification with including cost, taxes and carriage of all materials etc. all complete and as per the direction of IEC

1

-

-

... More
RPWS to Village KANKRIPADA: The contractor shall operate & maintain the PWS Project for 5 (Five ) Years from the completion date in such a manner that all the Functional Household Tap Connection (FHTC) of the PWS Scheme covered area will get (Adequate) required quantity of supply of water taking supply hour as 8 Hrs/ day without facing any problem. The contractor shall repair and replace any types of defects arise within 24 hours of the receipt of complaint either from public or from department. The contactor shall maintain all structures of the PWS Schemes as per terms and conditions of DTCN and technical specifications.

1

-

-

... More
N.B: The amount put to tender is exclusive of 12% GST. The intending bidders should offer their rate which shall be exclusive of GST as per norms. GST applicable onwards contract shall be paid over the bill amount at the time of payment of each bill.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.