Rural Water Supply And Sanitation Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_RWSS_72837_3Bid Award Id
ViewTender No
11/S.E/RWSS/2021-22Tender Authority
Rural Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
PWS to village - Asanabahali & Khanda (At - Khanda)
-
-
-
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .
1
-
4564441.62
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 50,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.
1
-
1844805
PWS to vill - Asanabahali & Khanda
The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.
1
-
710693.4
PWS to village - Kusumundia
-
-
-
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .
1
-
3260400.37
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 50,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.
1
-
1844805
The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.
1
-
255260.26
PWS to village - Dolia & Gobari (At - Dolia)
-
-
-
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .
1
-
3571789.67
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 40,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.
1
-
1535325
PWS to village - Dolia & Gobari (At - Gobari)
-
-
-
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .
1
-
4459919.19
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 50,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.
1
-
1844805
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 30,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.
1
-
1476161
The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.
1
-
644399.99