Rural Water Supply And Sanitation Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Water Supply And Sanitation Department - RWSS Tender

Civil And Construction
Eprocure
Opening Date20 Nov 2021
Closing Date8 Dec 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PWS to village - Asanabahali & Khanda (At - Khanda)

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .

1

-

4564441.62

... More
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 50,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.

1

-

1844805

... More
PWS to vill - Asanabahali & Khanda The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.

1

-

710693.4

... More
PWS to village - Kusumundia

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .

1

-

3260400.37

... More
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 50,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.

1

-

1844805

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.

1

-

255260.26

... More
PWS to village - Dolia & Gobari (At - Dolia)

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .

1

-

3571789.67

... More
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 40,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.

1

-

1535325

... More
PWS to village - Dolia & Gobari (At - Gobari)

-

-

-

... More
Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House & ESR and construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as DI,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of RCC valve chamber, individual house hold connection ,Stand alone, storage tank, Installation of Chlorination system, installation of submersible pump with motor in deep Tube well etc.(including supply of stad by pump motor), internal wiring of Pump house as per suppied Drawingin in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and in (Annexure-A to G) All materials required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any likage in the entire PWS system .

1

-

4459919.19

... More
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 50,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.

1

-

1844805

... More
Design, Drawing, Construction, Testing & Commissioning of RCC Elevated Storage Reservoir 30,000 ltrs capacity with 15 mtrs stagging including cost of all materials, pipes, fittings, valves including RCC stair case with stain less steel hand rail & Testing soil for SBC & site development for approach road to ESR etc complete as per the direction of Engineer-in- charge.

1

-

1476161

... More
The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5.

1

-

644399.99



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.