Rural Development Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Pipes and Pipe Related Activities
Eprocure
Opening Date10 Dec 2021
Closing Date15 Dec 2021
Tender Amount₹ 2,23,16,000 
Notes
Download

Costs

Summary

Construction And Maintenance Of Kolasahi Village To Baghua Via Batua Road For The Year 2021-22.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing WBM base course using crushed stone aggregates of specific sizes and type-B 11.2mm stone screning as filler and stone screened dust as binding material as per clause 404 of MoSRT&H Specification for Road and Bridge works (4th revision)

745.31

-

2519.11

... More
Providing WBM base course using crushed stone aggregates of specific sizes and type-B 11.2mm stone screning as filler and stone screened dust as binding material as per clause 404 of MoSRT&H Specification for Road and Bridge works (4th revision)

745.31

-

2534.27

... More
Providing and applying Primer Coat with slow setting bitumen emulsion @ 0.60kg/sqm using mechanical means as per Clause 502 of MoSRT&H specification for road and bridge works. (5th Revision).

9937.5

-

37.61

... More
Providing and applying Tack Coat with rapid setting bitumen emulsion @ 0.30kg/sqm using mechanical means as per Clause 503 of MoSRT&H specification for road and bridge works. (5th Revision)

12.91

-

9937.5

... More
Providing open graded premix surfacing of 20mm thickness using crushed stone aggregates and 60/70 penetration grade of bitumen , laying manually as per technical specification as per clause 511 of MoSRT&H Specification for Road and Bridge works (4th revision)

162.84

-

9937.5

... More
Providing pre-coated seal coat Type-B using 0.06 cum of size 6.7mm chips and 6.80 Kg of 60/70 penetration grade of bitumen for 10 sqm , laying manually as per technical specification as per clause 513 of MoSRT&H Specification for Road and Bridge works (4th revision) for diversion road

77.78

-

9937.5

... More
Providing and laying granular materials in sub-base of shoulders with moorum and compacting with PRR as per Clause 407 of MoSRT&H Specification for Road & Bridge works. (5th Revision).

809.46

-

1000

... More
Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site by mechanical means within a lead of 5km, spreading, grading to required slope and compacting to meet the requirement of table 300-2 & Clause 305 of MoSRT&H Specification for road and bridge works (5th Revision).

128.91

-

15289.58

... More
Construction of embankment with material deposited from road way cutting construction of embankment with approved materials deposited at site from road way cutting & excavated from drain & foundation of other structures graded & complete to meet the requirement etc. as per Clause 305 of MoSRT&H specification for road and bridge works (5th Revision).

55.3

-

177.79

... More
Fine dressing & Turfing the slopes of embankment with compact turf grass as per approved drawing and technical specifications as per Clause 307 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). Average slope width.

10600

-

17.28

... More
Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8-1980 fixing in position including painting and printing, etc.

-

-

-

... More
I) 5th kilometer stone

2994.41

-

1

... More
II) Ordinary Kilometer Stone

1825.6

-

4

... More
III) Hectometer stone

561.22

-

15

... More
Providing, Fixing and errection of mandatory sign board & informatory traffic sign board

-

-

-

... More
(i) 90 cm equilateral Triangle.

5

-

4613.9

... More
(ii) 800mm x 600mm Retangular. School, Awanganwadi & Village

4

-

5505.86

... More
(iii) 60cm. Circular. For Speed limet & Curve

3

-

4154.21

... More
(iv) 90 cm. circular.

5

-

6576.2

... More
(v) 60 cm x 45 cm rectangular Route marker signs

2

-

4065.02

... More
(v) 60 cm x 45 cm rectangular Route marker signs

5

-

5948.49

... More
(vi)90 cm high octagon

8

-

6823.21

... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a b

765

-

6319.04

... More
Earthwork in excavation of foundation in hard soil including well dressing & leveling the bed & depositing the excavated earth within initial lead and lift etc. complete.

268.4

-

42.39

... More
Filling foundation & plinth with sand well watered & rammed including cost, conveyance, royalties & taxes of all materials & cost of all labour, T&P reqd. for the work etc. all complete.

60.62

-

461.68

... More
P C C (1:3:6) nominal mix in foundation of structure as per approved drawing and technical specification

28.5

-

4678.24

... More
P.C.C. M-15 grade in super-structure in C.D. work as per approved drawing and technical specifications as per Section 1700 & 2200 of MoSRT&H specifications for road and bridge works (5th Revision).

361.06

-

4515.69

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specifications as per Section 1600 of MoSRT&H Specifications for Road & Bridge works (Latest Revision)

209

-

96.35

... More
Cement concrete (M-15) with 40 mm size C.B. Metal of approved quality as per approved drawing and direction of the Engineer-in-charge including cost, conveyance, royality taxes of all materials conforming to the MORTH techanical specification.

22.56

-

4248.25

... More
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .

30

-

5421.56

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with

253.04

-

42.39

... More
Cement concrete M 15 Levelling coarse with 40 mm size C.B. Metal of approved quality as per approved drawing and direction of the Engineer-in-charge including cost, conveyance, royality taxes of all materials conforming to the MORTH techanical specificat

17.7

-

4248.25

... More
M15 grade Plain Cement Concrete in Open Foundation, wall complete as per Drawing and Technical Specifications.

38.99

-

4515.69

... More
RCC M20 grade Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications.

39.03

-

5125.47

... More
RCC M20 grade Reinforced Cement Concrete in sub-structure complete as per Drawing and Technical Specifications.

26.03

-

8111.2

... More
RCC M20 grade Reinforced Cement Concrete in super-structure complete as per Drawing and Technical Specifications.

12.31

-

7020.63

... More
HYSD / MORT&H Technical Specification no- 1600Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

6.35

-

88986.76

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical

38.88

-

96.35

... More
Providing and laying Cement concrete wearing coat M-30 grade excluding reinforcement complete as per drawing and Technical Specifications. (excluding cost of steel)

2.19

-

5370.18

... More
Routine Maintenance for 1st 5 year

-

-

-

... More
Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge

-

-

-

... More
1st year Routine Maintenance

92.49

-

290.78

... More
2nd year Routine Maintenance

90.45

-

290.78

... More
3rd year Routine Maintenance

138.73

-

290.78

... More
4th year Routine Maintenance

184.97

-

290.78

... More
5th year Routine Maintenance

221.97

-

290.78

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

150

-

36.12

... More
2nd year Routine Maintenance

173.1

-

36.12

... More
3rd year Routine Maintenance

137.3

-

36.12

... More
4th year Routine Maintenance

242.19

-

36.12

... More
5th year Routine Maintenance

232.47

-

36.12

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.

-

-

-

... More
1st year Routine Maintenance

150

-

14.2

... More
2nd year Routine Maintenance

75

-

14.2

... More
3rd year Routine Maintenance

225

-

14.2

... More
4th year Routine Maintenance

450

-

14.2

... More
5th year Routine Maintenance

337.5

-

14.2

... More
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

150

-

229.44

... More
2nd year Routine Maintenance

225

-

229.44

... More
3rd year Routine Maintenance

307.5

-

229.44

... More
4th year Routine Maintenance

600

-

229.44

... More
5th year Routine Maintenance

750

-

229.44

... More
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

1

-

157.77

... More
2nd year Routine Maintenance

1

-

157.77

... More
3rd year Routine Maintenance

1

-

157.77

... More
4th year Routine Maintenance

2

-

157.77

... More
5th year Routine Maintenance

2

-

157.77

... More
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

-

-

-

... More
2nd year Routine Maintenance

5

-

1184.82

... More
3rd year Routine Maintenance

-

-

-

... More
4th year Routine Maintenance

5

-

1184.82

... More
5th year Routine Maintenance

-

-

-

... More
Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

5

-

769.35

... More
2nd year Routine Maintenance

5

-

769.35

... More
3rd year Routine Maintenance

5

-

769.35

... More
4th year Routine Maintenance

5

-

769.35

... More
5th year Routine Maintenance

5

-

769.35

... More
Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

50

-

125.16

... More
2nd year Routine Maintenance

50

-

125.16

... More
3rd year Routine Maintenance

50

-

125.16

... More
4th year Routine Maintenance

50

-

125.16

... More
5th year Routine Maintenance

50

-

125.16

... More
Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

200

-

7.65

... More
2nd year Routine Maintenance

200

-

7.65

... More
3rd year Routine Maintenance

200

-

7.65

... More
4th year Routine Maintenance

200

-

7.65

... More
5th year Routine Maintenance

200

-

7.65

... More
Maintenance and repair of RCC railing to bring it to the original shape cleaning and repainting as per drawings and technical specification clause 1911 as per direction of Engineer in Charge.

-

-

-

... More
1st year Routine Maintenance

2.7

-

1777.84

... More
2nd year Routine Maintenance

2.7

-

1777.84

... More
3rd year Routine Maintenance

2.7

-

1777.84

... More
4th year Routine Maintenance

2.7

-

1777.84

... More
5th year Routine Maintenance

2.7

-

1777.84

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

1

-

2422.89

... More
2nd year Routine Maintenance

1

-

2422.89

... More
3rd year Routine Maintenance

1

-

2422.89

... More
4th year Routine Maintenance

1

-

2422.89

... More
5th year Routine Maintenance

1

-

2422.89

... More
Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge

-

-

-

... More
1st year Routine Maintenance

12000

-

2.55

... More
2nd year Routine Maintenance

14400

-

2.55

... More
3rd year Routine Maintenance

16800

-

2.55

... More
4th year Routine Maintenance

19200

-

2.55

... More
5th year Routine Maintenance

21600

-

2.55

... More
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MORD technical specifications Clause 1915 as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

120

-

26.1

... More
2nd year Routine Maintenance

120

-

26.1

... More
3rd year Routine Maintenance

120

-

26.1

... More
4th year Routine Maintenance

120

-

26.1

... More
5th year Routine Maintenance

120

-

26.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.