Rural Development Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Rural Development Department - RDD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Nov 2024
Closing Date6 Dec 2024
Tender Amount₹ 3,36,009
Costs
EMD
₹ 3,360Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Repair And Maintenance To Rest Shed At Malkangiri In The District Of Malkangiri For The Year 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CERWI_107268_1Tender No
02/RWD-I,MKG/2024-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://http://rdodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation of foundation in hard soil with initial lead and lift and to required depth including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the Engineer-in-charge
7.06
270
1912.55
... More
Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc.complete as per direction of the Engineer-in-charge.
2.95
1278
3772.46
... More
Cement concrete (1:3:6) with 4cm size H.G. metal of approved quality from approved quarry in foundation including hoisting laying concrete including royalty, watering curing etc.complete as per direction of the Engineer-in-charge.
2.05
6278
12871.13
... More
Removing old plaster from walls including raking out joints 12mm deep and removing the debris within 50m lead as per direction of the Engineer-in-charge.
92.27
59
5471.61
... More
RCC work of M-20 (in Column base) using 20mm and down graded chipes including hosting lowaring and laying watering, cutting, cost, conveyance, royaliti and taxes etc. complete as per diraction of EIC.
1.36
7093
9647.34
... More
RCC work of M-20 (in Grade beam) using 20mm and down graded chipes including hosting lowaring and laying watering, cutting, cost, conveyance, royaliti and taxes etc. complete as per diraction of EIC.
0.56
7959
4457.55
... More
RCC work of M-20 (in Lintel) using 20mm and down graded chipes including hosting lowaring and laying watering, cutting, cost, conveyance, royaliti and taxes etc. complete as per diraction of EIC.
0.27
14706
3970.81
... More
RCC work of M-20 (in Column & Beam) using 20mm and down graded chipes including hosting lowaring and laying watering, cutting, cost, conveyance, royaliti and taxes etc. complete as per diraction of EIC.
0.9
16236
14612.94
... More
RCC work of M-20 (in Slab) using 20mm and down graded chipes including hosting lowaring and laying watering, cutting, cost, conveyance, royaliti and taxes etc. complete as per diraction of EIC.
1.18
14272
16841.43
... More
Supplying HYSD bar for MS.reinforcement for R.C.C. workincluding cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18to 20 gauge including cost of M.S.or TOR rod as per direction of the Engineer-in-charge.
4.27
8693
37119.11
... More
Fly Ash Brick work (Foundation & Plinth)in cement mortar (1:6) after immersing brick for six hours in water before use in Superstructure with good quality of fly ash. brick of 25cm x 12cm x 8cm size having compressive strength not less than 35Kg. Per Sqcm. Including splays cutting, circular moulding and similar such type of work with necessary projections chamfering curbelling including watering and curing etc. complete including cost, conveyance, royality taxes of all materials and all labour T&P required for the work complete as per specification and direction of the Engineer-in-charge.
3.31
5448
18034.83
... More
Fly Ash Brick work (In Superstructure)in cement mortar (1:6) after immersing brick for six hours in water before use in Superstructure with good quality of fly ash. brick of 25cm x 12cm x 8cm size having compressive strength not less than 35Kg. Per Sqcm. Including splays cutting, circular moulding and similar such type of work with necessary projections chamfering curbelling including watering and curing etc. complete including cost, conveyance, royality taxes of all materials and all labour T&P required for the work complete as per specification and direction of the Engineer-in-charge.
6.28
5486
34457.92
... More
12mm thick C.P. in C.M.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in-charge.
41.4
199
8249.36
... More
16mm thick C.P. in C.M.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in-charge.
117.27
284
33351.59
... More
Supplying, fitting and fixing MS Door & window shutter including cost of all materials etc.complete as per direction of the Engineer-in-charge.
9
93
840.42
... More
Painting two coats over one coat of primer over Door and window with any approved paint including cost of paint as per direction of the Engineer-in-charge.
43.11
142
6160.42
... More
Wall painting 2 coat with Weather coat (in GF) of approved shade to give an even shade including cost of paint as per direction of the Engineer-in-charge.
176.34
99
17570.52
... More
Wall painting 2 coat with Weather coat (in FF) of approved shade to give an even shade including cost of paint as per direction of the Engineer-in-charge.
156.48
103
16150.3
... More
Providing and laying CERAMIC FLOOR TILES of premium grade and of approved size & shade in flooring on a bed of 20 mm thick cement mortar 1:4 (1 Cement :4 Coarse sand) finished with flush pointing in white cement & pigment to match the shade of the tiles as per direction of the Engineer-in-charge.
13.56
912
12375.53
... More
Fixing wall tile in dados risers or steps on 12 mm thick bed of cement morta (1:3) with neat cement sluryusing 20cmx30cm wall tile etc as per direction of the Engineer-in-charge.
15.99
912
14593.27
... More
Providing fitting fixing of false ceiling with Aluminium anodised T section No.3215 with 2'0" center to center, L section No.1705 on 4 walls to be fixed by means of steel screw and P.V.C. plug and the Aluminium grid 2'0"x2'0" with 12mm thick Prelaminated Particle Board suspended from ceiling including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-charge
20.21
1648
33312.95
... More
Wall painting 2 coat with Distemper (in GF ) of approved shade on new work to give an even shade excluding cost of paint including cost of all materials all labour charges ,T&P etc. complete.
24.28
89
2166.5
... More
Wall painting 2 coat with Distemper (in FF ) of approved shade on new work to give an even shade excluding cost of paint including cost of all materials all labour charges ,T&P etc. complete as per direction of the Engineer-in-charge.
279.46
91
25514.7
Evaluation Notes How It Works ?
Potential Partner