Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Sep 2024
Closing Date24 Sep 2024
Tender Amount₹ 36,92,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced Cement concrete work of M-20 grade with 20mm & down grade black hard granite ( Crusher broken ) stone chips including hoisting & laying including cost, conveyance& royalty of all materials and labour with T&P etc. complete in all respect.[A/R-2006,Page-50, Item no.4] GROUND FLOOR Column Base

24.02

156521

6516.31

... More
Columns

0.9

5864

6516.31

... More
Plinth Beam

6.59

42942

6516.31

... More
Column ( PL TO F.F)

2.87

18701

6516.31

... More
Lintel

3.29

21438

6516.31

... More
Roof Beam

3.09

20135

6516.31

... More
Roof Slab

12.43

80997

6516.31

... More
Chajja

0.66

4300

6516.31

... More
Staircase

1.39

9057

6516.31

... More
FIRST FLOORColumns

2.67

17716

6635.42

... More
Lintels

3.21

21299

6635.42

... More
Roof Beam

2.71

17981

6635.42

... More
Roof Slab

10.88

72193

6635.42

... More
Chhaja

0.59

3914

6635.42

... More
Staircase

1.37

9090

6635.42

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

0.6

4063

6772.39

... More
Lintel band

0.39

2641

6772.39

... More
Roof slab

1.2

8126

6772.39

... More
Chhaja

0.04

270

6772.39

... More
Straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost, conveyanceof steel and all other materials, cost of all labour with T&P required for the work etc. complete.[A/R-2006,Page-52, Item no.9(A)] GROUND FLOOR

49.19

422826

8595.79

... More
FIRST FLOOR

18.18

156864

8628.43

... More
HEAD ROOM

1.88

16285

8662.7

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor. Column Base

85.2

63746

748.2

... More
Columns

9.56

7152

748.2

... More
Plinth Beam

22.61

26764

1183.74

... More
Column( PL TO F.F)

45.9

54333

1183.74

... More
Lintel

26.33

15034

571.02

... More
Roof Beam

26.33

31167

1183.74

... More
Roof Slab

124.29

93923

755.68

... More
Chajja

10.87

8214

755.68

... More
Staircase

13.53

14097

1041.92

... More
FIRST FLOOR Columns

12

16121

1343.45

... More
Lintels

21.67

13221

610.11

... More
Roof Beam

21.67

29112

1343.45

... More
Roof Slab

83.91

69662

830.21

... More
Chhaja

9.22

7654

830.21

... More
Staircase

15.02

17664

1176.07

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

9.6

14736

1535.1

... More
Lintel band

1.57

1031

657.02

... More
Roof slab

12.03

11063

919.65

... More
Chhaja

1.01

928

919.65

... More
Fly Ash Brick masonary with Flyash Bricks of 25cm.x 12cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2 in cement mortar (1:6) in F&P including cost, conveyance& royalties of all materials, labour with T&P etc. complete in all respect.[A/R-2006,Page-71, Item no.03] IN FOUNDATION

17.53

99420

5671.46

... More
IN GROUND FLOOR

61.28

349895

5709.79

... More
IN FIRST FLOOR

33.29

202563

6084.82

... More
IN HEAD ROOM & TERRACE FLOOR

5.61

36555

6516.09

... More
Providing 20 mm thick grading Plaster using cement Plaster (1:4) on roof slab cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer – in – Charge. IN FIRST FLOOR

108.76

36026

331.25

... More
16mm thick cement plaster in cm (1:6) finished smooth to brick or stone masonry including cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-105, Item no.14] IN GROUND FLOOR

313.54

84586

269.78

... More
IN FIRST FLOOR

304.17

84136

276.61

... More
IN HEAD ROOM & TERRACE FLOOR

22.27

6316

283.64

... More
12mm thick cement plaster in cm (1:6) finished smooth to brick masonry including watering, curing, cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-103, Item no.4] GROUND FLOOR

140.28

26266

187.24

... More
FIRST FLOOR

90.89

17433

191.81

... More
HEAD ROOM & TERRACE FLOOR

15.75

3095

196.52

... More
Wall painting to interior surface two coats with Plastic Emulsion Paint of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

313.54

83022

264.79

... More
FIRST FLOOR

304.17

82308

270.6

... More
HEAD ROOM

22.27

6159

276.59

... More
Wall painting to interior surface with single coat wall primer etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

313.54

23001

73.36

... More
FIRST FLOOR

304.17

22913

75.33

... More
HEAD ROOM

22.27

1722

77.36

... More
Wall painting two coats with weather coat of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all floors as per the direction of EIC GROUND FLOOR

140.28

13421

95.68

... More
FIRST FLOOR

90.89

8889

97.81

... More
HEAD ROOM

15.75

1575

100

... More
Weather coat painting two coats over a coat of primer to exterior surface including cost of all materials and labour with T&P etc complete in all respect. GROUND FLOOR

140.28

24512

174.74

... More
FIRST FLOOR

90.89

16242

178.7

... More
HEAD ROOM

15.75

2878

182.78

... More
Supplying, fitting & fixing of Vetrified tilesI in floors treads of steps & landings of premium grade 8 mm to 10 mm thick confirming to IS specification 13756 of 25 cm x 25 cm colored printed series on 12 mm thick cement plaster of cement mortor 1:1 jointed with neat cement slurry & colouring pigments matching with tiles & etc complete including cost, conveyance, taxes royalties of all materials & cost of all labour T&P required for the work & etc complete GROUND FLOOR

88.23

124073

1406.25

... More
FIRST FLOOR

65.12

92432

1419.42

... More
Fixing of Ceramic tiles of size 30x30cm. in floors, Trades or steps & Landing on 25mm thick bed of cement morter(1:1) with pigments to match the shade of the tiles, including polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-89, Item no.16] GROUND FLOOR

15.67

15588

994.79

... More
FIRST FLOOR

10.09

10170

1007.96

... More
Fixing of Ceramic wall tiles in Dado with with cement morter(1:3) with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-90, Item no.17] GROUND FLOOR

20.36

20001

982.39

... More
FIRST FLOOR

16.68

16716

1002.2

... More
Supplying, fitting & fixing of M.S plate door/ MS plate window with MS angle frame & grill in proper position including fixing with RCC (1:2:4) with hard balck broken granite stone chips of 12 mm to 20mm size with cost, conveyance, labour T & P etc complete as per specification & direction of the EIC GROUND FLOOR (Shutter)

8.84

18819

2128.94

19.07

49789

2610.86

... More
FIRST FLOOR(Shutter)

8.11

17265

2128.94

8.96

23393

2610.86

... More
HEAD ROOM

3.02

7884

2610.86

1.13

2405

2128.94

... More
Supplying fitting & fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mmx32xmmx2mm in 3 rows in stair case as per approved design and specification buffing polishing etc with all cost & conveyance etc complete. GROUND FLOOR

6

21529

3588.33

... More
FIRST FLOOR

7.98

28774

3605.77

... More
Providing, fitting, fixing of Aluminium. door with anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member with frame section as 9221 with tapered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 & 12mm thick pre laminated board fixed on door frame including all fitting ,cost of all materials,, labour, T&P etc. complete as per direction of Engineer in Charge. [A/R-2006,XIX. Other building items of SOR 2012, GROUND FLOOR

11.97

111253

9294.34

... More
FIRST FLOOR

8.82

82847

9393.18

... More
Painting with approved quality and shade of enamel paint two coats conforming to IS on steel or wood work to give an even shade with two coats of synthetic enamel paint over an under coat of primer of suitable shade of approved quality including cost of all materials with taxes and transportation all labour scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.GROUND FLOOR

27.8

7082

254.78

... More
FIRST FLOOR

8.34

2180

261.41

... More
HEAD ROOM

1.51

405

268.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.