Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Jan 2025
Closing Date18 Jan 2025
Tender Amount₹ 36,92,000 
Notes
Download

Costs

Summary

Construction Of Sc-hwc At Gorada For The Year 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete of proportion (1:3:6) in F&F using 40mm size CBHG metal of approved quality including cost, conveyance& royalty of all materials and labour with T&P etc. complete in all respect .[A/R-2006,Page-43, Item no.3]

17.72

6476

114765.53

... More
Reinforced Cement concrete work of M-20 grade with 20mm & down grade black hard granite ( Crusher broken ) stone chips including hoisting & laying including cost, conveyance& royalty of all materials and labour with T&P etc. complete in all respect.[A/R-2006,Page-50, Item no.4] GROUND FLOOR Column Base

23.73

6575

156040.89

... More
Columns

0.9

6575

5918.11

... More
Plinth Beam

6.59

6575

43333.73

... More
Column ( PL TO F.F)

2.87

6575

18872.2

... More
Lintel

3.29

6575

21633.99

... More
Roof Beam

3.09

6575

20318.85

... More
Roof Slab

12.43

6575

81735.7

... More
Chajja

0.66

6575

4339.95

... More
Staircase

1.39

6575

9140.2

... More
FIRST FLOORColumns

2.67

6695

17876.48

... More
Lintels

3.21

6695

21491.95

... More
Roof Beam

2.71

6695

18144.29

... More
Roof Slab

10.88

6695

72844.97

... More
Chhaja

0.59

6695

3950.23

... More
Staircase

1.37

6695

9172.57

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

0.6

6832

4099.73

... More
Lintel band

0.39

6832

2664.82

... More
Roof slab

1.2

6832

8199.46

... More
Chhaja

0.04

6832

273.32

... More
Straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost, conveyanceof steel and all other materials, cost of all labour with T&P required for the work etc. complete.[A/R-2006,Page-52, Item no.9(A)] GROUND FLOOR

48.76

8600

419383.3

... More
FIRST FLOOR

18.18

8633

156961.39

... More
HEAD ROOM

1.88

8668

16296.12

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor. Column Base

84.32

749

63229.88

... More
Columns

9.56

749

7168.85

... More
Plinth Beam

22.61

1186

26833.1

... More
Column( PL TO F.F)

45.9

1186

54473.2

... More
Lintel

26.33

571

15059.71

... More
Roof Beam

26.33

1186

31247.92

... More
Roof Slab

124.29

757

94134.76

... More
Chajja

10.87

757

8232.72

... More
Staircase

13.53

1044

14133.71

... More
FIRST FLOOR Columns

12

1347

16165.2

... More
Lintels

21.67

611

13244.7

... More
Roof Beam

21.67

1347

29191.66

... More
Roof Slab

83.91

832

69829.06

... More
Chhaja

9.22

832

7672.79

... More
Staircase

15.02

1179

17712.94

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

9.6

1539

14778.91

... More
Lintel band

1.57

658

1033.52

... More
Roof slab

12.03

921

11091.3

... More
Chhaja

1.01

921

931.19

... More
Fly Ash Brick masonary with Flyash Bricks of 25cm.x 12cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2 in cement mortar (1:6) in F&P including cost, conveyance& royalties of all materials, labour with T&P etc. complete in all respect.[A/R-2006,Page-71, Item no.03] IN FOUNDATION

17.53

5707

100055.81

... More
IN GROUND FLOOR

61.28

5746

352116.11

... More
IN FIRST FLOOR

33.29

6122

203820.02

... More
IN HEAD ROOM & TERRACE FLOOR

5.61

6555

36776.8

... More
Providing 20 mm thick grading Plaster using cement Plaster (1:4) on roof slab cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer – in – Charge. IN FIRST FLOOR

108.76

333

36247.53

... More
16mm thick cement plaster in cm (1:6) finished smooth to brick or stone masonry including cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-105, Item no.14] IN GROUND FLOOR

313.54

271

84985.02

... More
IN FIRST FLOOR

304.17

277

84531.88

... More
IN HEAD ROOM & TERRACE FLOOR

22.27

284

6346.28

... More
12mm thick cement plaster in cm (1:6) finished smooth to brick masonry including watering, curing, cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-103, Item no.4] GROUND FLOOR

140.28

188

26389.47

... More
FIRST FLOOR

90.89

192

17515.41

... More
HEAD ROOM & TERRACE FLOOR

15.75

197

3109.37

... More
Wall painting to interior surface two coats with Plastic Emulsion Paint of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

313.54

265

83263.68

... More
FIRST FLOOR

304.17

271

82545.65

... More
HEAD ROOM

22.27

277

6177.48

... More
Wall painting to interior surface with single coat wall primer etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

313.54

73

23079.68

... More
FIRST FLOOR

304.17

75

22992.21

... More
HEAD ROOM

22.27

77

1728.6

... More
Wall painting two coats with weather coat of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all floors as per the direction of EIC GROUND FLOOR

140.28

95

13459.87

... More
FIRST FLOOR

90.89

98

8915.4

... More
HEAD ROOM

15.75

100

1579.57

... More
Weather coat painting two coats over a coat of primer to exterior surface including cost of all materials and labour with T&P etc complete in all respect. GROUND FLOOR

140.28

175

24586.88

... More
FIRST FLOOR

90.89

179

16291.12

... More
HEAD ROOM

15.75

183

2887.45

... More
Supplying, fitting & fixing of Vetrified tilesI in floors treads of steps & landings of premium grade 8 mm to 10 mm thick confirming to IS specification 13756 of 25 cm x 25 cm colored printed series on 12 mm thick cement plaster of cement mortor 1:1 jointed with neat cement slurry & colouring pigments matching with tiles & etc complete including cost, conveyance, taxes royalties of all materials & cost of all labour T&P required for the work & etc complete GROUND FLOOR

88.23

1408

124275.48

... More
FIRST FLOOR

65.12

1421

92585.01

... More
Fixing of Ceramic tiles of size 30x30cm. in floors, Trades or steps & Landing on 25mm thick bed of cement morter(1:1) with pigments to match the shade of the tiles, including polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-89, Item no.16] GROUND FLOOR

15.67

996

15617.04

... More
FIRST FLOOR

10.09

1009

10189.29

... More
Fixing of Ceramic wall tiles in Dado with with cement morter(1:3) with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-90, Item no.17] GROUND FLOOR

20.36

984

20042.99

... More
FIRST FLOOR

16.68

1004

16752.06

... More
Supplying, fitting & fixing of M.S plate door/ MS plate window with MS angle frame & grill in proper position including fixing with RCC (1:2:4) with hard balck broken granite stone chips of 12 mm to 20mm size with cost, conveyance, labour T & P etc complete as per specification & direction of the EIC GROUND FLOOR (Shutter)

8.84

2130

18833.53

19.07

2612

49824.57

... More
FIRST FLOOR(Shutter)

8.11

2130

17278.27

8.96

2612

23409.97

... More
HEAD ROOM

3.02

2612

7890.41

1.13

2130

2407.45

... More
Supplying fitting & fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mmx32xmmx2mm in 3 rows in stair case as per approved design and specification buffing polishing etc with all cost & conveyance etc complete. GROUND FLOOR

6

3589

21537.6

... More
FIRST FLOOR

7.98

3607

28784.66

... More
Providing, fitting, fixing of Aluminium. door with anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member with frame section as 9221 with tapered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 & 12mm thick pre laminated board fixed on door frame including all fitting ,cost of all materials,, labour, T&P etc. complete as per direction of Engineer in Charge. [A/R-2006,XIX. Other building items of SOR 2012, GROUND FLOOR

11.97

9302

111348.53

... More
FIRST FLOOR

8.82

9401

82921.49

... More
Painting with approved quality and shade of enamel paint two coats conforming to IS on steel or wood work to give an even shade with two coats of synthetic enamel paint over an under coat of primer of suitable shade of approved quality including cost of all materials with taxes and transportation all labour scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.GROUND FLOOR

27.8

255

7105.96

... More
FIRST FLOOR

8.34

262

2187.42

... More
HEAD ROOM

1.51

269

406.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.