Rural Development Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date7 Oct 2023
Closing Date13 Oct 2023
Tender Amount₹ 43,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RR stone masonry with cost conveyance of all materials in foundation and plinth etc complete

66.35

281004

4235.18

... More
Fly ash brick masonry in cm (1:6) using 25x12x8 cm bricks in foundation and plinth with all cost conveyance of all materials

4.74

24081

5080.4

... More
Fly ash brick masonry in cm (1:6) using 23x11x8 cm size bricks. in super structure with all cost conveyance of all materials GROUND FLOOR

77.3

395291

5113.73

... More
Fly ash brick masonry in cm (1:6) using 23x11x8 cm size bricks. in super structure with all cost conveyance of all materials FIRST FLOOR

27.49

148141

5388.91

... More
Fly ash brick masonry in cm (1:6) using 23x11x8 cm size bricks. in super structure with all cost conveyance of all materials SECOND FLOOR

13.04

74397

5705.35

... More
C.C. (1:2:4) using 12 mm hg chips of approved quality from approved quarry etc complete.

1.37

9655

7048.14

... More
R.C.C. M 25 using 20 mm hg chips of approved quality from approved quarry etc complete. GROUND FLOOR (A-Column base)

14.33

95222

6644.97

... More
B-Grade Beam

6.91

48590

7031.84

... More
C-Lintel

1.98

20559

10383.34

... More
FIRST FLOOR (Lintel)

1.63

17733

10879.72

... More
SECOND FLOOR (Lintel)

0.55

6309

11470.99

... More
Column (Ground Floor)

3.94

55800

14162.51

... More
Column (First Floor)

2.42

37372

15443.1

... More
Column (Second Floor)

0.47

7978

16975.43

... More
Roof slab (Ground Floor)

8.48

91987

10847.55

... More
Roof slab (First Floor)

8.8

101128

11491.87

... More
Roof slab (Second Floor)

1.8

22069

12260.68

... More
Beam at roof (Ground floor)

3.05

43195

14162.51

... More
Beam at roof (First floor)

3.19

49263

15443.1

... More
Beam at roof (Second floor)

0.67

11373

16975.43

... More
Chajja (Ground floor)

5.04

4462

885.47

... More
Chajja (First floor)

3.3

3142

952.18

... More
Chajja (Second floor)

0.72

743

1031.97

... More
Fins (Ground floor)

2.52

2704

1073.18

... More
Fins (First floor)

1.8

2126

1181.57

... More
Fins (Second floor)

0.36

472

1311.37

... More
Stair case (Ground floor)

2.84

36685

12917.55

... More
Stair case (First floor)

2.84

39780

14007.26

... More
Straighteening cutting bending binding MS and TS road with all cost conveyance (Ground floor)

47.01

407695

8672.53

... More
First Floor

22.98

199858

8697.06

... More
Second floor

4.09

35676

8722.8

... More
Providing 25 mm grading concrete in CC (1:2:2) with all cost and labour as grading plaster with all cost conveyance of all materials. (Ground floor)

67.92

22588

332.58

... More
First Floor

70.51

25490

361.52

... More
Fixing vitrified tiles in floors treads and landing on 25 mm thick bed cement mortar 1:1 joined with neat cement slurry mixed with pigment to match the shades of tiles including rubbing and polishing with cost of tile (Ground floor)

73.71

79643

1080.5

... More
First Floor

62.12

67746

1090.58

... More
Second Floor

11.07

12189

1101.17

... More
Fixing Vetrified tiles in dados skirttings and risers of steps 12 mm thick bed cement plaster 1:3 joined with neat cement slurry mixed with pigment to match the shades of tiles including rubbing and polishing with cost of tile (Ground floor)

12.93

14040

1085.92

... More
First Floor

11.98

13190

1101.08

... More
Second Floor

6.42

7171

1117.01

... More
Providing chequers tile on floors trades etc with cost conveyance of all materials

6.86

6377

929.65

... More
Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. Ground Floor (Toilet)

35.04

41558

1186.02

... More
First Floor (Toilet)

35.05

42101

1201.18

... More
Providing 12 mm thick cp in cm (1:6) including all cost conveyance of all materials (Ground Floor)

231.53

36401

157.22

... More
First Floor

140.4

22871

162.9

... More
Second Floor

36.26

6123

168.87

... More
Providing 16 mm thick cp in cm (1:6) including all cost conveyance of all materials(Ground Floor)

433.39

96697

223.12

... More
First Floor

237.13

54113

228.2

... More
Second Floor

27.92

6517

233.43

... More
Providing 20 mm thick cp in cm (1:6) including all cost conveyance of all materials

104.59

24651

235.7

... More
Providing Iron grill gates with all cost and labour (Ground Floor)

100.8

7392

73.34

... More
First Floor

88.2

6468

73.34

... More
Second Floor

73.5

5390

73.34

... More
Providing and fixing Iron grills for window with all cost conveyance of all materials (Ground Floor)

153

11081

72.43

... More
First Floor

108

7822

72.43

... More
Labour for fitting fixing door and window shutter including all cost conveyance and labour for fixing.(Ground Floor)

2.88

72

25.21

... More
First Floor

2.52

63

25.21

... More
Second Floor

2.1

52

25.21

... More
Ground Floor(Window / Ventilator grill)

6.12

80

13.15

... More
First Floor(Window / Ventilator grill)

4.32

56

13.15

... More
Providing Alluminium door shutter with all cost and labour for doors without cost of frames (Ground Floor)

11.28

79945

7087.33

... More
First Floor

11.34

80370

7087.33

... More
Providing Alluminium window shutter Sliding type with all cost and labour (Ground Floor)

57.96

267293

4611.69

... More
First Floor

4.32

19922

4611.69

... More
Providing and painting 2 coats over a coat of primer to new iron work etc complete (Ground Floor)

11.26

2374

210.84

... More
First Floor

3.21

693

215.92

... More
Second Floor

1.05

232

221.15

... More
Providing Distempering 2 coats over wall finished smooth with all cost and conveyance over a coat of cement wash(Ground Floor)

338.77

46872

138.36

... More
First Floor

287.27

40487

140.94

... More
Second Floor

33

4665

141.37

... More
Providing weather coat 2 coats to outside wall finished smooth with all cost conveyance of all materials over a coat of cement wash (Ground Floor)

491.52

69107

140.6

... More
First Floor

140.4

20029

142.66

... More
Second Floor

36.26

5247

144.71

... More
Providing stainless steel hand rails with all cost and labour (Ground Floor)

10.67

40468

3792.74

... More
First Floor

6.1

23135

3792.74

... More
25 mm Damp proof course with CC (1:2:4) using 12 mm chips with all cost conveyance of materials with CB chips

18.5

5975

323.02

... More
Providing Iron grills with all cost conveyance of all materials

490

33687

68.75

... More
Labour for fitting fixing door and window shutter including all cost conveyance and labour for fixing.

14

950

67.9

... More
Providing CC (1:1.5:3) using 12 mm hg chips (Crusher broken) including cost conveyance royalty and all labour T & P etc comlete

35.03

273490

7807.31

... More
Providing expansion joint for concrete pavement as directed by the EIC

52.5

546

10.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.