Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date8 Jan 2025
Closing Soon16 Jan 2025
Tender Amount₹ 41,26,182 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fly Ash brick masonary in Cement Mortar (1:6) in foundation/Superstructure using-Fly Ash.-brick of 25cm X 12cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials & labour required for the work with all taxes & royalties with all T&P & cess etc, complete in all respect as per the direction of Engineer-in-charge.

17.89

5536

99042.08

... More
Providing and laying Reinforced cement concrete of M-20 grade with 20mm and down grade clean crusher broken granite chips aggregate of approved quality from approved quarry including hoisting, lowering & levelling in position to required level in each layer not exceeding 15cm thick including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering if necessary with cost, conveyance taxes royalty labour of all materials and including hire and running charges of machinaries T&P required for the work including supplying and working of pumps and cess as per the specification and direction of Engineer-in-charge.

-

-

-

... More
GROUND FLOOR

-

-

-

... More
(i) Column Base footing-

12.23

7037

86074.37

... More
(ii) Plinth Beam :-

6.23

7904

49243.48

... More
( iii ) Column Supt

3.17

18559

58889.29

... More
(iv) Lintel Band

3.62

14650

53036.44

... More
(v) Chajja:-

10.28

1263

12992.17

... More
(vi) Wall Beam

3.62

18559

67185.39

... More
(vii) Roof Slab-

13.15

14216

186949.08

... More
(viii) Staircase

1.21

16056

19428.38

... More
FIRST FLOOR

-

-

-

... More
( iii ) Column Supt

2.51

20938

52554.53

... More
(iv) Lintel Band

2.5

16247

40619.48

... More
(v) Chajja:-

6.32

1429

9037.16

... More
(vi) Wall Beam

13.96

20938

292295.32

... More
(vii) Roof Slab-

11.57

17521

202719.36

... More
(viii) Staircase

3.05

17934

54700.13

... More
Cutting, bending, binding & placing in position MS bar reinforcement complete as per drawing & technical specifications with all cost of materials, labour, conveyence, etc all complete as per the direction of E.I.C

-

-

-

... More
GROUND FLOOR

44.92

8773

394107.42

... More
FIRST FLOOR

42.39

8806

373299.48

... More
Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crusing strength not less than 75kg/cm^2 with dimesional tolerance +/- 2% in cement motar (1:6) with all cost of materials, labour, coveyance, royality, watering, etc all complete as per the directions of E.I.C

-

-

-

... More
GROUND FLOOR

52.27

5569

291117.77

... More
FIRST FLOOR

42.27

5940

251096.06

... More
16mm thick cement plaster (1:6) for brick or concrete work with all cost of materials, labour, conveyence, watering, curing, etc. all complete all complete as per direction of EIC

-

-

-

... More
GROUND FLOOR

321.38

274

88167.39

... More
FIRST FLOOR

276.48

285

79009.69

... More
12mm thick cement plaster (1:6) for brick or concrete work with all cost of materials, labour, conveyence, watering, curing, etc all complete as per direction of EIC

-

-

-

... More
GROUND FLOOR

123.2

190

23515.18

... More
FIRST FLOOR

150.74

198

29921.89

... More
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with all cost of all materials, labour, conveyence, etc. all complete as per the directions of EIC

-

-

-

... More
GROUND FLOOR

86.83

191

16643.68

... More
FIRST FLOOR

77.79

200

15557.8

... More
Supplying & fixing vitrified tile in floors of size 600mm x 600mm of approved make conforming to IS: 15622 laid on 20mm thick cement mortar (1:4) and filling joints with white cement of approved quality including all cost of all materials, labour, T&P, conveyence, watering, curing, etc all complete as per the directions of EIC

-

-

-

... More
GROUND FLOOR

84.17

1186

99873.6

... More
FIRST FLOOR

82.17

1199

98586.74

... More
Fixing Ceramic tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.

49.45

1440

71227.29

... More
Fixing chequred tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.

12.89

1062

13694.59

... More
Finishing surface of wall with cement based wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.

-

-

-

... More
GROUND FLOOR

408.21

89

36681.75

... More
FIRST FLOOR

354.27

92

32932.94

... More
Wall Priming one coat with any approved shade of primer ( WBD ) on New Plastered surface of with any approved primer including cost of primer ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.

-

-

-

... More
GROUND FLOOR

531.41

82

43650.02

... More
FIRST FLOOR

505.01

85

43143

... More
Distempering two coats with any approved shade including cost of distemper on New Plastered surface including cost of distemper of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.

-

-

-

... More
GROUND FLOOR

408.21

171

69971.28

... More
FIRST FLOOR

354.27

176

62624.31

... More
Wall painting two coats with any approved quality of Weather seal coat over one coat of Primerwith any approved shade including cost of paint on New Plastered surface of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.

-

-

-

... More
GROUND FLOOR

123.2

181

22363.26

... More
FIRST FLOOR

150.74

189

28550.16

... More
Providing and fixing factory made UPVC door with door frame of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc.

-

-

-

... More
GROUND FLOOR

21.96

8682

190659.36

... More
FIRST FLOOR

9.27

8682

80483.25

... More
Supplying , Fitting, fixing up window (sliding type) made up aluminium section 9778 as windows frame, section No 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick plain glass as panel fitted with rubber beading including locking arrangement including all fitting including all cost of materials, labour, T&P, etc all complete as per direction of E.I.C

-

-

-

... More
GROUND FLOOR

11.29

4582

51732.93

... More
FIRST FLOOR

7.11

4582

32579.37

... More
Supplying, fitting, fixing of stainless steel of 304 in hand grade railing using 50 mm dia of 2mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @ 0.90m c/c and stainless steel square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design & specification, buffing, polishing, etc. with all cost of all materials, labour, conveyence, T&P, etc all complete as per the direction of E.I.C

4.57

3589

16415.24

... More
Supplying,fitting and fixing M.S. made doors and windows in posituion including all etc. complete as per the direction of E.I.C

-

-

-

... More
GROUND FLOOR

234.75

94

22082.93

... More
FIRST FLOOR

503.75

94

47387.76

... More
Painting two coats of enamel paint in all floors to new iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paint & primer complete in all respect as per the direction of Engineer in Charge.

-

-

-

... More
GROUND FLOOR

7.27

254

1852.61

... More
FIRST FLOOR

9.32

261

2437.18



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.