Rural Development Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 8,403Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CERWI_105851_1Tender No
e-Procurement Notice No.01 of 2024-25-BLS-IITender Authority
Rural Development Department ViewPurchaser Address
-Website
http://http://rdodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and applying priming coat over the prepared surface in low porosity with bitumen Emolusion (SS-1) including cleaning of road surface & spraying primer @ 0.90 to 1.2 Kg./sqm using mechanical means etc.complete as per technical (MORD) specification clause 502.
Over WBM Gr-III areas
330
36
12012
Providing and applying Tack coat over the bituminous surface, with bitumen emolusion (RS-1) using emolusion distributor cleaned with hydraulic broom as per technical (MORD) specification as per clause no.503.
840
13
10920
Labour for laying 20 mm thick premix carpet using 0.27 cum of 13.2 mm to 5.6 mm size crushed stone chipping and 14.60kg penetration grade of bitumen for 10 sqm including hand packing to proper camber and consolidation with PRR including hire & running charges of PRR , hot-mix plant,bitumen boilers and all other T&P articles etc(To be used for minor repair works )
840
212
178248
Labour for laying 6mm thick precoated seal coat Type-B using 0.06 cum of 6.7mm size chips as per sieve analysis and 6.8kg of bitumen per 10sqm including hire& running charges of PRR,hot-mix plant , tar boiler and all other T&P articles etc
840
92
77616
Construction of Un-reinforced, plain cement concrete pavement over a prepared sub-base with 43 grade cement @ 350 kg /cum coarse and fine aggregate confirming to IS:383,maximum size of coarse aggregate not exceeding 25 mm,mixed in aconcrete mixer of not lessthan .2cum capacity andappropriate batching and mixing plant as per approved mix design,transported to site,laid with a fixed form or slip form paver,spread,compacted and finished in a continous operation etc , curing compound ,finishing to lines and grades as per drawing and as per clause 602 of MoSRT&H Specifications for Road & Bridge works (4th. Revision
32.07
7542
241891.18
Construction of hard earth shouder having CBR more than 5 with approved materials of obtained from borrow pit with all lead & lefts, transporting of sit spreading, grading to required slope and compaction to meet requirement of table 300.2 as per technical specification clause 303.1 etc complete
68.4
1189
81382.32
Earth work in excavation of foundation in hard soil up to required depth with levelling the bed etc complete.
15.68
270
4247.71
Filling foundation and plinth with sand well watered and rammed including cost conveyance royalty of sand and labour etc complete.
1.65
1502
2479.62
Foundation Concrete (M-10) including cost of all materials , labour royalities , cost of carriage etc complete
3.6
6457
23247.36
Unit cost of NP-3 Hume pipe including cost of all materials , labour royalities , cost of carriage etc complete
7.5
3104
23286.75
P.C.C. work of M-15 using 20mm and down graded chips including cost of all materials , labour royalities , cost of carriage etc complete
10.92
6393
69814.84