Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Feb 2025
Closing Date18 Feb 2025
Tender Amount₹ 4,73,48,886 
Notes
Download

AI Insights

Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is Super class, special class, or A class contractors.
Bid Capacity
... View More
The bid capacity required in the given tender to bid is calculated using the formula: Assessed Available Bid Capacity = (A * N * 2) - B Where: A = Maximum value of works executed in any one year (updated to the current price level) B = Value at current price level of the existing commitments and ongoing works to be completed during the time period stipulated in the contract data N = Number of years prescribed for completion of the works for which the bids are invited (for work completion period less than one year, the value may be taken as one year)
Technical Capacity
... View More
The bidder is required to provide information on their prior work experience, specifically on the value of civil engineering works executed during the last 5 years. The bidder should have experience in projects that are similar in nature to the work. The value of civil engineering works executed in the last 5 years is provided as follows: - Year 2 (FY 2019-20): Rs. 1.61 lakhs - Year 3 (FY 2020-21): Rs. 1.46 lakhs - Year 4 (FY 2021-22): Rs. 1.33 lakhs - Year 5 (FY 2022-23): Rs. 1.21 lakhs - Year 5 (FY 2023-24): Rs. 1.10 lakhs However, specific values and percentages for similar works completed are not provided, except that the bidder must secure 80% marks in aggregate to qualify. The bidder's available bid capacity will be calculated based on the maximum value of works executed in any one year during the last five years, updated to the current price level. A 10% price preference is allowed for individual registered contractors belonging to Schedule Caste and Schedule Tribe, having a registration certificate up to 'B' Class. If the rate quoted by the bidder is less than 15% of the tendered amount, the bid may be rejected.

Costs

Summary

Construction And Maintenance Of Upulei To Badapanka Via Nuagaon Road In The Dist. Of Kendrapara Under Mmsy-trip For The Year 2024-25.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).

610.3

50

30722.5

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m

180

74

13449.6

... More
Fine dressing and turfing to the slopes of the road embankment with compact dub gross transported by mechanical means as per the direction of the E.I.C.

7491

28

214766.97

... More
Construction of granular Sub base by providing close grade granular sub-base grading-III material as per table-100-1. spreading in uniform layers with motor grader om prepared surface,mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H specifications for road and Bridges work.

2808.4

3309

9293388.78

... More
Providing , Laying, spreading and compacting graded stone aggregates in Wet Mix Macadam as per specification including premixing material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub-base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of MORTH specifications for road & bridge works (4th revision) but excluding the charges of GST including cost conveyance required as directed by Engineer-in-Charge.

1798.28

3951

7106748.61

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means and including cost conveyance & royality of all materials & cost of all labour & T&P required for the work hire charges of machinaries etc complete but excluding the charges of GST as per Technical specification clause 502 of MORD for low porosity surface but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.

9551.03

37

355393.83

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH specification for road & bridge works (4th revision) etc complete but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.

9551.03

13

129511.97

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete.

238.77

10950

2614562.54

... More
Construction of Un-reinforced,plain cement concrete pavement M-30 grade over a prepared sub base with 43 grade using brande cement @ 350 kg per cum,coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, spread, compacted finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, finishing to lines and grages as per drawing and as per Clause 602 of MoSRT&H specifications for Road & Bridge Works and as per as per specification & direction of the Engineer-in-Charge.

1593.54

8740

13927714.89

... More
Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge.

691.85

270

187415.25

... More
Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.

229.48

1974

453083.02

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 of MoRD but excluding the charges of GST & as per direction of the Engineer-in-Charge.

-

-

-

... More
1000 mm dia Single row

45

6570

295680.15

... More
1000mm dia Double row

45

6570

295680.15

... More
Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1200 of MoRD and as per direction of the Engineer-in-Charge.

19.98

8832

176482.54

... More
Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.

-

-

-

... More
Foundation

292.19

7283

2128253.52

... More
Sub-Structure

558.87

7425

4150073.61

... More
RCC of design mix of M-25 grade having specified characteristics compressive strength/ target mean strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken granite course aggregate of 20mm. .sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)

-

-

-

... More
Superstructure

13.56

11547

156589.66

... More
R.C.C M-30 grade in wearing course using 20mm and down grade BHGCB chips of approved quality from approved quarry including hoisting lowering and laying in position in layers with proper packing and ramming by means of vibrator to proper slope and level including watering and curring with cost conveyance royality of all materials required for the work including all labour,T&P for the work etc complete but excluding the charges of GST in all respect as per the specification and direction of Engineer-in-charge.

2.14

8722

18666.19

... More
Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level but excluding the charges of GST as per direction of the Engineer-in-charge including dewatering if required.

6.75

3145

21230.51

... More
Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 of MORD specification for Rural roads but excluding the charges of GST and as per direction of Engineer-in- charge.

214

112

24141.34

... More
Reinforced cement concrete M15 grade Kilometer stone/ local stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD but excluding the charges of GST and as per direction of Engineer-in-Charge.

-

-

-

... More
Fixing of 5th. Km. Stone

1

4761

4761.7

... More
Fixing of Km. Stone

5

2864

14323.75

... More
200 mm Stone (Precast)

20

784

15685

... More
Guide Post (M-20)

200

967

193480

... More
Supplying, fitting, fixing of roads sign board as per approve drawing including cost, conveyance, royality, taxes of all materials, labour, T & P etc. providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC: 67-2010 made of A.C.P. (Aluminium composite panel) used for sign boards with a thermoplastic core of low density polyethylene (LDPE) between two thick sheets of aluminium with over all thickness of 4mm and aluminum thickness of 0.5mm on both sides as per requirement in table 6.1 of IRC-67/2010 and as per technical specifically of clause 801.3 supported on a mild steel angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 40cm x 40cm x 60cm. 60cm below ground level as per approved drawing including excavation, curring but excluding the charges of GST etc. complete as per MoRD Technical Specification Clause 1701 and as per direction of Engineer-in-charge.

-

-

-

... More
Information signs

2

118201

236402.56

... More
Providing and fixing of typical MMSy Citizen sign board with logo as per MORD specifications and drawing. Two MS plates of 2mm thick, top & middle plate duly welded with MS flat iron 25mmx5mm size on back on edges. The flat iron frame of both plate will be welded to 2nos 75mmx75mm of 12SWG sheet tubes posts duly embeded in C.C. M-15 grade blocks of 600mmx600mmx750mm, 750mm below ground level. The top most dimond plate will be welded to middle plate by 47mmx47mm of 12SWG steel tube. All M.S. will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quailty in required shade & colour. All sections of framed posts & steel tubes will be painted with primer & two coats of paint as per drawing clause 1701 and Annexure 1700.1

2

8998

17996

... More
Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 etc complete including cost conveyance etc required as per specification but excluding the charges of GST & direction of Engineer-in-Charge.

-

-

-

... More
600mm equilateral triangle

15

2383

35756.25

... More
600mm Circular

15

2206

33094.35

... More
Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge

-

-

-

... More
1st year

20.25

390

7904.59

... More
2nd year

26.93

390

10512.13

... More
3rd year

33.82

390

13201.64

... More
4th year

40.5

390

15809.18

... More
5th year

47.18

390

18416.71

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.

-

-

-

... More
1st year

67.5

46

3167.78

... More
2nd year

89.78

46

4213.38

... More
3rd year

112.73

46

5290.42

... More
4th year

135

46

6335.55

... More
5th year

157.28

46

7381.15

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.

-

-

-

... More
1st year

67.5

18

1238.63

... More
2nd year

89.78

18

1647.46

... More
3rd year

112.73

18

2068.6

... More
4th year

135

18

2477.25

... More
5th year

157.28

18

2886.09

... More
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge.

-

-

-

... More
1st year

637.5

354

225917.25

... More
2nd year

861.9

354

305440.12

... More
3rd year

1095.86

354

388350.87

... More
4th year

1338.75

354

474426.23

... More
5th year

1568.25

354

555756.43

... More
Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge.

-

-

-

... More
1st year

10

1713

17132.1

... More
2nd year

10

1713

17132.1

... More
3rd year

10

1713

17132.1

... More
4th year

10

1713

17132.1

... More
5th year

10

1713

17132.1

... More
Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

5

908

4540

... More
2nd year

5

908

4540

... More
3rd year

5

908

4540

... More
4th year

5

908

4540

... More
5th year

5

908

4540

... More
Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

50

176

8805.5

... More
2nd year

67

176

11799.37

... More
3rd year

84

176

14793.24

... More
4th year

100

176

17611

... More
5th year

117

176

20604.87

... More
Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

200

10

2194

... More
2nd year

266

10

2918.02

... More
3rd year

334

10

3663.98

... More
4th year

400

10

4388

... More
5th year

466

10

5112.02

... More
Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge

-

-

-

... More
1st year

67.5

3

247.05

... More
2nd year

89.78

3

328.59

... More
3rd year

114.75

3

419.99

... More
4th year

135

3

494.1

... More
5th year

157.28

3

575.64



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.