Rural Development Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date7 Feb 2025
Closing Soon24 Feb 2025
Tender Amount₹ 3,65,68,463 
Notes
Download

AI Insights

Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is 'B' Class for Individual registered Contractors belonging to Schedule Caste and Schedule Tribe, however for general eligibility it is mentioned as Super class / special class / A class contractors.
Bid Capacity
... View More
The bid capacity required in the given tender can be calculated using the formula: Assessed Available Bid Capacity = (A * N * 2) - B Where: A = Maximum value of works executed in any one year (updated to the current price level) B = Value at current price level of the existing commitments and ongoing works to be completed during the time period stipulated in the contract data N = Number of years prescribed for completion of the works for which the bids are invited (for work completion period less than one year, the value may be taken as one year) Additionally, to qualify, a bidder must secure 80% marks in aggregate for the equipment listed with their respective capacities and marks, with a total of 100 marks. The bidder needs to secure at least 80 marks to qualify. The bid capacity required also depends on the Earnest Money Deposit (EMD) and Additional Performance Security (APS) requirements, which can be calculated using the formulas: 1. EMD = 1% of the estimated cost put to tender 2. APS = - 0, if the difference is below 5% - 50% of the difference, if the difference is between 5% and 10% - 150% of the difference, if the difference is 10% or above However, specific numerical values for the estimated cost and bid amount are not given, so an exact numerical bid capacity required cannot be calculated.
Technical Capacity
... View More
The required prior work experience for the bidder is not explicitly stated, but there are mentions of requirements related to previous work experience and completion of similar works. The bidder must have completed works similar in nature to the work, with a minimum annual turnover to be furnished in Schedule – H. The value of similar works completed is not explicitly mentioned, but the bidder has to provide information on their previous work experience and completion of similar works. The values mentioned in SCHEDULE -H are related to the value of civil engineering works executed during the last 5 years, which are: - Year 2 (FY 2019-20): Rs. 1.61 lakhs - Year 3 (FY 2020-21): Rs. 1.46 lakhs - Year 4 (FY 2021-22): Rs. 1.33 lakhs - Year 5 (FY 2022-23): Rs. 1.21 lakhs - Year 5 (FY 2023-24): Rs. 1.10 lakhs No specific percentage of similar works completed is mentioned. However, the bidder must secure 80% marks in aggregate to qualify. The bidder must have completed works with a value that allows them to meet the bid capacity requirements. The available bid capacity is calculated as (A*N*2-B), where A is the maximum value of works executed in any one year, N is the number of years prescribed for completion of the works, and B is the value of existing commitments and ongoing works.

Costs

Summary

Impvt To Sitalapatana Garadpur Road In The Dist Of Kendrapara Under Mmsy Impvt. To Existing Rd Roads For The Year 2024-25.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.

13885.72

200

2789363.43

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).

2273.77

50

114461.58

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m

1725.63

74

128939.07

... More
Fine dressing and turfing to the slopes of the road embankment with compact dub gross transported by mechanical means as per the direction of the E.I.C.

7500

28

215025

... More
Construction of granular Sub base by providing close grade granular sub-base grading-III material as per table-100-1. spreading in uniform layers with motor grader om prepared surface,mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H specifications for road and Bridges work.

1045.5

2976

3111888.93

... More
Providing , Laying, spreading and compacting graded stone aggregates in Wet Mix Macadam as per specification including premixing material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub-base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of MORTH specifications for road & bridge works (4th revision) but excluding the charges of GST including cost conveyance required as directed by Engineer-in-Charge.

2199.38

3506

7712521.86

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means and including cost conveyance & royality of all materials & cost of all labour & T&P required for the work hire charges of machinaries etc complete but excluding the charges of GST as per Technical specification clause 502 of MORD for low porosity surface but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.

14025

36

515278.5

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH specification for road & bridge works (4th revision) etc complete but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.

14025

13

188075.25

... More
Providin & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over previously prepared surface with hydrostatic paver finisher with sensore control to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 504 of MoSRT&H Specifications for road and bridge works (4th Revision) Page-169 Item -45

701.25

8985

6301025.78

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete.

350.63

10502

3682424.96

... More
Providing,supplying,fitting and fixing of 80mm thick interlocking concrete paver block on compacted river coarse sand free from all organic materials and filling the joints with sand including cutting,corbelling, splays whereever necessary to proper size with cost,conveyance,royalities of all materials and as directed by Engineer-in-chief.

2021.25

630

1274559.83

... More
Earth work in excavation of foundation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge.

863.68

270

233962.28

... More
Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.

310.06

612

189862.14

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 of MoRD but excluding the charges of GST & as per direction of the Engineer-in-Charge.

-

-

-

... More
1000 mm dia Single row

60

6232

373942.2

... More
Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1200 of MoRD and as per direction of the Engineer-in-Charge.

8

8779

70234

... More
Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.

-

-

-

... More
Foundation

287.3

6155

1768466.53

... More
Sub-Structure

833.5

6297

5248966.25

... More
RCC of design mix of M-25 grade having specified characteristics compressive strength/ target mean strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken granite course aggregate of 20mm. .sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)

-

-

-

... More
Superstructure

10

10288

102888.2

... More
Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 of MORD specification for Rural roads but excluding the charges of GST and as per direction of Engineer-in- charge.

302

110

33319.66

... More
Reinforced cement concrete M15 grade Kilometer stone/ local stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD but excluding the charges of GST and as per direction of Engineer-in-Charge.

-

-

-

... More
Fixing of 5th. Km. Stone

1

4311

4311.86

... More
Fixing of Km. Stone

3

2555

7667.61

... More
200 mm Stone (Precast)

11

728

8011.52

... More
Guide Post (M-20)

114

878

100167.24

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform.but excluding the charges of GST etc complete as per the direction of Engineer-in-Charge.

583.33

354

206667.99

... More
Supplying, fitting, fixing of roads sign board as per approve drawing including cost, conveyance, royality, taxes of all materials, labour, T & P etc. providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC: 67-2010 made of A.C.P. (Aluminium composite panel) used for sign boards with a thermoplastic core of low density polyethylene (LDPE) between two thick sheets of aluminium with over all thickness of 4mm and aluminum thickness of 0.5mm on both sides as per requirement in table 6.1 of IRC-67/2010 and as per technical specifically of clause 801.3 supported on a mild steel angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 40cm x 40cm x 60cm. 60cm below ground level as per approved drawing including excavation, curring but excluding the charges of GST etc. complete as per MoRD Technical Specification Clause 1701 and as per direction of Engineer-in-charge.

-

-

-

... More
Information signs

2

117442

234885.92

... More
Providing and fixing of typical MMSy Citizen sign board with logo as per MORD specifications and drawing. Two MS plates of 2mm thick, top & middle plate duly welded with MS flat iron 25mmx5mm size on back on edges. The flat iron frame of both plate will be welded to 2nos 75mmx75mm of 12SWG sheet tubes posts duly embeded in C.C. M-15 grade blocks of 600mmx600mmx750mm, 750mm below ground level. The top most dimond plate will be welded to middle plate by 47mmx47mm of 12SWG steel tube. All M.S. will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quailty in required shade & colour. All sections of framed posts & steel tubes will be painted with primer & two coats of paint as per drawing clause 1701 and Annexure 1700.1

2

8998

17996

... More
Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 etc complete including cost conveyance etc required as per specification but excluding the charges of GST & direction of Engineer-in-Charge.

-

-

-

... More
600mm equilateral triangle

9

2222

20003.76

... More
600mm Circular

9

2062

18560.7

... More
Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge

-

-

-

... More
1st year

11.54

390

4504.64

... More
2nd year

15.35

390

5991.87

... More
3rd year

19.27

390

7522.04

... More
4th year

23.08

390

9009.28

... More
5th year

26.89

390

10496.51

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.

-

-

-

... More
1st year

38.48

46

1805.87

... More
2nd year

51.18

46

2401.88

... More
3rd year

64.26

46

3015.72

... More
4th year

76.96

46

3611.73

... More
5th year

89.66

46

4207.74

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.

-

-

-

... More
1st year

38.48

18

706.11

... More
2nd year

51.18

18

939.15

... More
3rd year

64.26

18

1179.17

... More
4th year

76.96

18

1412.22

... More
5th year

89.66

18

1645.26

... More
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge.

-

-

-

... More
1st year

534.38

343

183778.63

... More
2nd year

716.07

343

246263.63

... More
3rd year

908.45

343

312425.04

... More
4th year

1101.89

343

378950.99

... More
5th year

1287.86

343

442907.93

... More
Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge.

-

-

-

... More
1st year

6

1713

10279.26

... More
2nd year

6

1713

10279.26

... More
3rd year

6

1713

10279.26

... More
4th year

6

1713

10279.26

... More
5th year

6

1713

10279.26

... More
Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

2.85

908

2587.8

... More
2nd year

2.85

908

2587.8

... More
3rd year

2.85

908

2587.8

... More
4th year

2.85

908

2587.8

... More
5th year

2.85

908

2587.8

... More
Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

29

176

5107.19

... More
2nd year

39

176

6868.29

... More
3rd year

48

176

8453.28

... More
4th year

58

176

10214.38

... More
5th year

68

176

11975.48

... More
Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

114

10

1250.58

... More
2nd year

152

10

1667.44

... More
3rd year

190

10

2084.3

... More
4th year

228

10

2501.16

... More
5th year

266

10

2918.02

... More
Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge

-

-

-

... More
1st year

38.48

3

140.84

... More
2nd year

51.18

3

187.32

... More
3rd year

65.42

3

239.44

... More
4th year

76.96

3

281.67

... More
5th year

89.66

3

328.16



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.