Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 16,47,000 
Notes
Download

Costs

Summary

Construction Of Conference Hall (oswan) At Kudumulugumma Tahasil Office In The District Of Malkangiri During The Year 2024-25.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing cement concrete M10 (1:3:6) using 40 mm HG Metal in luding cost conveyance of all material,ramming with ramming to proper slope and level including watering, curing with cost, conveyance, royality, taxes, labour, T&P and all other materials required for the work, finishing the exposed surface smooth, providing grooves and beads where ever necessary etc. complete in all respect as per the specification and as per direction of the Engineer-in-Charge

6.05

41071

6788.71

... More
Fly ash brick work (foundation & Plinth) in cement mortar (1:6) after immersing brick for six hours in water before use in foundation with good quality of fly ash. brick of 25cm x 12cm x 8cm size having compressive strength not less than 35Kg. Per Sqcm. Including splays cutting, circular moulding and similar such type of work with necessary projections chamfering curbelling including watering and curing etc. complete including cost, conveyance, royality taxes of all materials and all labour T&P required for the work complete as per specification and direction of the Engineer-in-charge.

11.5

65679

5711.25

... More
R.C.C. work M-25 grade in (Column Base & Footing) having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 12mm to 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.

3.89

30693

7890.4

... More
R.C.C. work M-25 grade in (Column & Beam) having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 12mm to 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.

6.61

128092

19378.57

... More
R.C.C. work M-25 grade in (Plinth Beam) having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 12mm to 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.

3.53

30931

8762.57

... More
R.C.C. work M-25 grade in (Lintel band) having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 12mm to 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.

1.5

23345

15563.47

... More
R.C.C. work M-25 grade in (Chajja) having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 12mm to 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.

3.87

5099

1317.78

... More
R.C.C. work M-25 grade in (Roof Slab) having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 12mm to 20mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.

10.73

161535

15054.57

... More
Cutting, streightening the bent up M.S./TS Rods bending, binding, welding, jointing if necessary and tying the grills and placing in position, as required for R.C.C work and for providing required No. of Fan Hooks hoisting, lowering, laying including, cost, conveyance, taxes of all M.S. Rods or Tor steel and binding wires of 118 to 20 gauge required for the work bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Rods or Tor steel only and no separate payment will be made towards the weight of binding wires) as per direction of the Engineer-in-Charge

26.65

230498

8649.1

... More
Fly ash brick work in (In Superstructure) with cement mortar (1:6) after immersing brick for six hours in water before use in Superstructure with good quality of fly ash. brick of 25cm x 12cm x 8cm size having compressive strength not less than 35Kg. Per Sqcm. Including splays cutting, circular moulding and similar such type of work with necessary projections chamfering curbelling including watering and curing etc. complete including cost, conveyance, royality taxes of all materials and all labour T&P required for the work complete as per specification and direction of the Engineer-in-charge.

34.54

198417

5744.58

... More
16 mm thick cement plaster(1:6) over brick massonary finished smooth, after racking out the joints including watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete as directed by the Engineer-in-Charge

206.53

57619

278.99

... More
12 mm thick cement plaster(1:6) over brick massonary finished smooth, after racking out the joints including watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete as directed by the Engineer-in-Charge

195.53

38110

194.91

... More
Supplying,fitting,fixing of Vetrified tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing of tile with watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete as directed by the Engineer-in-Charge

61.27

95205

1553.87

... More
Fixing Vetrified tile in dados / risers or steps on 12 mm thick bed of cement morta (1:3) with neat cement sluryusing wall tile etc. including rubbing and polishing of tile with watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete as directed by the Engineer-in-Charge

9.56

16161

1690.53

... More
Supplying,fitting,fixing in position of M.S.fixed grill, railings,doors,windows with grills of approved section ,design and drawing with cost of all materials all labour charges T&P sundries etc complete. as per direction of the Engineer-in-Charge

781.35

72868

93.26

... More
Supplying fitting, fixing up UPVC window ( sliding type) made up alumium section 151-154-151-155, as windows facme section No. 151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting inclduing cost of all materials, all taxes, labour, T&P etc. complete as per direction of Engineer-in-Charge. (AOR-2006, page-240, sl.no-7)

10.13

68150

6727.61

... More
Priming one coat with any approved (water bound) primer over new plaster surface including cost of cement with all cost, conveyance royalty taxes of all materials and all labour T&P required for the work including 1 % cess etc complete as per direction of the Engineer-in-charge.

190.16

15311

80.52

... More
Finishing plastered surface of walls with Acrylic wall putty (Water Based of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes labour T & P etc complete.

145.42

15823

108.81

... More
Wall painting 2 coats with plastic emulsion paint of approved shade with one coat water pased primer on new work to give an even shade including cost of all materials, labour charges, T&P etc required for the work complete. . as per direction of the Engineer-in-charge.

195.35

20035

102.56

... More
Finishing walls with weather coat of approved shade on new work two coat over acoat of primer to give an even shade including cost of all materials, labour charges, T&P etc required for the work complete. . as per direction of the Engineer-in-charge.

167.9

13640

81.24

... More
Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance, taxes of all materials, all labour and T&P required for the work including the cost of primer all other materials aetc complete as per direction of the Engineer-in-Charge

13.37

3406

254.77

... More
Providing fitting and fixing of false ceiling with Aluminum anodised T section No.3215 with 2'-0" center to center, L section No. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and P.V.C plug and the Aluminium grid 2'-0" x2'-0" suspended from ceiling including 12 mm thick prelaminated particle board etc complete.

36.96

103744

2806.95

... More
Supplying, fitting, fixing in all floors fully glazed aluminium framed openable Doors/windows using 15 micron anodised OEL aluminium section 2082 as out section,9139 as mullion section,4124 as a shutter section frame with tapered clip of section4125,aluminium angle,rubber beading,friction stay and handleetc.with 5mm black glass including cost of materials all taxes of labour, T&P etc. complete asper direction of E.I.C

13.19

117084

8876.78

... More
Supplying and filling foundation and plinth with sandy soil, well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials

52.71

24071

456.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.