Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date27 Dec 2024
Closing Date4 Jan 2025
Tender Amount₹ 12,71,131 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC work of M-20 grade Base having a minimum compreshive srength 150kg per cm2 in 150mm cubes at 28 days curing after mixing and test conducted in accordance with I.S 456 and I.S 516 using black hard crusher broken granaite chipsof 20mm and down-grade size not exceeding 25percent of approved quality including hoisting and laying placing in position concrete watering and curing for 28 days including cost of rigid and smooth stool centering and shuttering with C.M plaster 1:2 at no extra cost where necessery and cost, conveyance, royality and taxes of all materials labour required for the work etc. complete but excluding cost of M.S. Rod or Tor steel and binding and tying the grills and placing in position etc.complete. The materials used in the work and finished item of work shall confirm to relevant I.S specification and as per specification and direction of the Engineer-In-charge. The testing charges will be borne by the contractor

21.12

7376

155802.03

... More
RCC wall

48

8243

395676.96

... More
Providing HYSD bar reinforcement Fe 415 MS round bars required for R.C.C. works including cost and conveyance of tested M.S. or T.S. rods and binding wire of 18 to20 gauge, including labour charges for straightening , cutting,bending,binding,and welding if required and tying the grills and placing in proper position as required incase of availability of rods in Departmental store,the same can be supplied to the contractor at prevailing stock issue rate of grade S 240 and S 415 confirming to IS 432 and IS 1786 respectively with approved design etc complete as per Specification and direction of Engineer-In - charge.

26.3

8834

232338.41

... More
Finishing walls with Acrylic wall putty (Water based) of approved quality and Making smooth to receive painting including cost and conveyance of all materials to site, and all labour charges complete as per direction of the Engineer-in-charge.

175.8

89

15797.39

... More
Wall painting 2-coats with plastic emulsion paint of approved shade on new work 1coats to give an even shade including cost and conveyance of all materials to site, and all labour charges etc. complete as per specification and direction of the Engineer-In-charge.

175.8

102

18079.27

... More
Priming 1-coat with any approved primer including all labour etc complete as per direction of the Engineer-in-charge.

691.52

78

54616.25

... More
Finishing walls with weather coat two coats over a coat of cement primer to outer wall surface including cost and conveyance of all materials to site, and all labour charges complete as per direction of the Engineer-in-charge.

219.66

95

21076.38

... More
First floor

296.06

99

29395.8

... More
Earthwork in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods by mechanical means to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of Engineer-in-charge.

835

266

222235.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.