Rural Development Department Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CERWI_70030_10Bid Award Id
ViewTender No
EERWDKPT-Online-06/2021-22Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://http://rdodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
-
-
-
... More
Ground Floor
2.94
-
577.51
... More
Cement Concrete of proportion(1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
-
-
-
... More
Ground Floor
2.94
-
4134.08
... More
R.C.C work (1:1½:3) with clean hard crusher broken granite chips of 12mm size of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing for four weeks, centring, shuttering and finishing the exposed surface and ceiling smooth to receive white washing or painting providing grooves or beads and fan hooks as per requirement in ceiling where necessary, cost of water, including cost, conveyance, royalty taxes of all the materials and labour, T&P and cess etc. complete in all respect but excluding cost of M.S rods or Tor steel and binding wire 18 to 20 gauge and labour charges for straightening, cutting, bending and binding and tying the grills and placing in proper position as per specification and direction of the Engineer-in-charge.
-
-
-
... More
First Floor
0.6
-
13630.89
... More
Roof Slab
-
-
-
... More
First Floor
1.75
-
11782.62
... More
Cutting, bending, binding and tying the grills and placing in proper position as per drawing and design including cost, conveyance and taxes of M.S rods and binding wire with all labour T&P and cess required for the work etc. complete in all respect in all floors(weight of binding wires will not be considered as measurement of M.S rods) as per specification and direction of the Engineer-in-charge.
-
-
-
... More
First Floor
2.83
-
8032.3
... More
20mm. Cement Plaster in C.M. (1:4) over roof slab including all cost, conveyance, labour, etc., required for the work complete as directed by the E.I.C.
-
-
-
... More
First Floor
17.48
-
248.15
... More
Fly Ash Brick work in C.M. (1:6) in superstructure including all cost, conveyance, tax, royalty of all materials and all labour, T&P, etc. complete.
-
-
-
... More
First Floor
10.86
-
3849.4
... More
16mm th Cement plaster in C.M (1:6) to brick work finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
-
-
-
... More
First Floor
79.43
-
196.88
... More
12mm th Cement plaster in C.M (1:6) to brick work finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
-
-
-
... More
First Floor
79.43
-
138.24
... More
Finishing walls with water proofing cement paint (Weather coat) of approved shade on new work two coats, over a coat of priming, to give an even shade with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
-
-
-
... More
First Floor
158.86
-
68.46
... More
Supplying fitting and fixing of Stain less steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @ 0.90mtr c/c and stain less square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. including cost of all materials, taxes, labour, T&P, cess, and hire charges of drilling machine, labour charges etc. complete in all respect as per specification and direction of the Engineer-in-charge
-
-
-
... More
First Floor
7.5
-
3496.62
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements