Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Sep 2024
Closing Date24 Sep 2024
Tender Amount₹ 36,92,000 
Notes
Download

Costs

Summary

Construction Of Sc-hwc At Gadakujanga In Erasama Block In The District Of Jagatsinghpur Under State Plan For The Year 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced Cement concrete work of M-20 grade with 20mm & down grade black hard granite ( Crusher broken ) stone chips including hoisting & laying including cost, conveyance& royalty of all materials and labour with T&P etc. complete in all respect.[A/R-2006,Page-50, Item no.4] GROUND FLOOR Column Base

20.93

142135

6791

... More
Columns

0.9

6111

6791

... More
Plinth Beam

5.49

37282

6791

... More
Column ( PL TO F.F)

2.87

19490

6791

... More
Lintel

3.29

22342

6791

... More
Roof Beam

3.09

20984

6791

... More
Roof Slab

12.43

84412

6791

... More
Chajja

0.66

4482

6791

... More
Staircase

1.39

9439

6791

... More
FIRST FLOORColumns

2.67

18449

6910.11

... More
Lintels

3.21

22181

6910.11

... More
Roof Beam

2.71

18726

6910.11

... More
Roof Slab

10.88

75182

6910.11

... More
Chhaja

0.59

4076

6910.11

... More
Staircase

1.37

9466

6910.11

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

0.6

4228

7047.08

... More
Lintel band

0.39

2748

7047.08

... More
Roof slab

1.2

8456

7047.08

... More
Chhaja

0.04

281

7047.08

... More
Straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost, conveyanceof steel and all other materials, cost of all labour with T&P required for the work etc. complete.[A/R-2006,Page-52, Item no.9(A)] GROUND FLOOR

45.05

387580

8603.35

... More
FIRST FLOOR

18.18

157002

8635.99

... More
HEAD ROOM

1.88

16300

8670.26

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor. Column Base

78.47

58776

749.03

... More
Columns

9.56

7160

749.03

... More
Plinth Beam

18.85

22313

1183.74

... More
Column( PL TO F.F)

45.9

54333

1183.74

... More
Lintel

26.33

15050

571.61

... More
Roof Beam

26.33

31167

1183.74

... More
Roof Slab

124.29

94027

756.52

... More
Chajja

10.87

8223

756.52

... More
Staircase

13.53

14103

1042.38

... More
FIRST FLOOR Columns

12

16121

1343.45

... More
Lintels

21.67

13233

610.7

... More
Roof Beam

21.67

29112

1343.45

... More
Roof Slab

83.91

69733

831.05

... More
Chhaja

9.22

7662

831.05

... More
Staircase

15.02

17671

1176.54

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

9.6

14736

1535.1

... More
Lintel band

1.57

1032

657.6

... More
Roof slab

12.03

11073

920.48

... More
Chhaja

1.01

929

920.48

... More
Fly Ash Brick masonary with Flyash Bricks of 25cm.x 12cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2 in cement mortar (1:6) in F&P including cost, conveyance& royalties of all materials, labour with T&P etc. complete in all respect.[A/R-2006,Page-71, Item no.03] IN FOUNDATION

17.53

101504

5790.32

... More
IN GROUND FLOOR

61.28

357179

5828.65

... More
IN FIRST FLOOR

33.29

206520

6203.67

... More
IN HEAD ROOM & TERRACE FLOOR

5.61

37222

6634.94

... More
Providing 20 mm thick grading Plaster using cement Plaster (1:4) on roof slab cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer – in – Charge. IN FIRST FLOOR

108.76

37056

340.72

... More
16mm thick cement plaster in cm (1:6) finished smooth to brick or stone masonry including cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-105, Item no.14] IN GROUND FLOOR

313.54

85724

273.41

... More
IN FIRST FLOOR

304.17

85237

280.23

... More
IN HEAD ROOM & TERRACE FLOOR

22.27

6397

287.26

... More
12mm thick cement plaster in cm (1:6) finished smooth to brick masonry including watering, curing, cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-103, Item no.4] GROUND FLOOR

140.28

26688

190.25

... More
FIRST FLOOR

90.89

17707

194.82

... More
HEAD ROOM & TERRACE FLOOR

15.75

3142

199.53

... More
Wall painting to interior surface two coats with Plastic Emulsion Paint of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

313.54

83022

264.79

... More
FIRST FLOOR

304.17

82308

270.6

... More
HEAD ROOM

22.27

6159

276.59

... More
Wall painting to interior surface with single coat wall primer etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

313.54

23001

73.36

... More
FIRST FLOOR

304.17

22913

75.33

... More
HEAD ROOM

22.27

1722

77.36

... More
Wall painting two coats with weather coat of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all floors as per the direction of EIC GROUND FLOOR

140.28

13421

95.68

... More
FIRST FLOOR

90.89

8889

97.81

... More
HEAD ROOM

15.75

1575

100

... More
Weather coat painting two coats over a coat of primer to exterior surface including cost of all materials and labour with T&P etc complete in all respect. GROUND FLOOR

140.28

24512

174.74

... More
FIRST FLOOR

90.89

16242

178.7

... More
HEAD ROOM

15.75

2878

182.78

... More
Supplying, fitting & fixing of Vetrified tilesI in floors treads of steps & landings of premium grade 8 mm to 10 mm thick confirming to IS specification 13756 of 25 cm x 25 cm colored printed series on 12 mm thick cement plaster of cement mortor 1:1 jointed with neat cement slurry & colouring pigments matching with tiles & etc complete including cost, conveyance, taxes royalties of all materials & cost of all labour T&P required for the work & etc complete GROUND FLOOR

88.23

124073

1406.25

... More
FIRST FLOOR

65.12

92432

1419.42

... More
Fixing of Ceramic tiles of size 30x30cm. in floors, Trades or steps & Landing on 25mm thick bed of cement morter(1:1) with pigments to match the shade of the tiles, including polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-89, Item no.16] GROUND FLOOR

15.67

15656

999.15

... More
FIRST FLOOR

10.09

10214

1012.31

... More
Fixing of Ceramic wall tiles in Dado with with cement morter(1:3) with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-90, Item no.17] GROUND FLOOR

20.36

20077

986.14

... More
FIRST FLOOR

16.68

16779

1005.96

... More
Supplying, fitting & fixing of M.S plate door/ MS plate window with MS angle frame & grill in proper position including fixing with RCC (1:2:4) with hard balck broken granite stone chips of 12 mm to 20mm size with cost, conveyance, labour T & P etc complete as per specification & direction of the EIC GROUND FLOOR (Shutter)

8.84

18860

2133.59

19.07

49895

2616.44

... More
FIRST FLOOR(Shutter)

8.11

17303

2133.59

8.96

23443

2616.44

... More
HEAD ROOM

3.02

7901

2616.44

1.13

2410

2133.59

... More
Supplying fitting & fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mmx32xmmx2mm in 3 rows in stair case as per approved design and specification buffing polishing etc with all cost & conveyance etc complete. GROUND FLOOR

6

21529

3588.33

... More
FIRST FLOOR

7.98

28774

3605.77

... More
Providing, fitting, fixing of Aluminium. door with anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member with frame section as 9221 with tapered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 & 12mm thick pre laminated board fixed on door frame including all fitting ,cost of all materials,, labour, T&P etc. complete as per direction of Engineer in Charge. [A/R-2006,XIX. Other building items of SOR 2012, GROUND FLOOR

11.97

111253

9294.34

... More
FIRST FLOOR

8.82

82847

9393.18

... More
Painting with approved quality and shade of enamel paint two coats conforming to IS on steel or wood work to give an even shade with two coats of synthetic enamel paint over an under coat of primer of suitable shade of approved quality including cost of all materials with taxes and transportation all labour scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.GROUND FLOOR

27.8

7082

254.78

... More
FIRST FLOOR

8.34

2180

261.41

... More
HEAD ROOM

1.51

405

268.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.