Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 24,68,14,138 
Notes
Download

Costs

Summary

Improvement Of Berhampur-tamana-chikiti- Surangi-mandarada Road From 10/000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Unit - Cum Earth work in excavation in ordinary rock with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge.

8100

-

731268

... More
Unit - Cum Earth work in excavation for roadway in hard rock (blasting prohibited) including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge.

5400

-

2294568

... More
Unit - Cum Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

13500

-

486000

... More
Unit - Cum Providing and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

4606.02

-

9834313.3

... More
Unit - Cum Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

7221.38

-

17322790.77

... More
Unit - Sqm Providing and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

32413.5

-

1156513.68

... More
Unit - Sqm Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

275992.5

-

3284310.75

... More
Unit - Cum Providing and laying dense graded bituminous macadam using crushed stone of Grade-II aggregate with batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 Grade by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per clause No. 505 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. .

2454.9

-

21859190.62

... More
Unit - Cum Providing and laying bituminous concrete using crushed stone of Grade-II aggregate with batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.5 percent of VG-30 grade of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per Clause No.507 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

11039.7

-

106710402.58

... More
Unit - Cum Construction of shoulder with moorum and sand admixture (70% moorum & 30% sand) as per approved drawing and technical specifications as per Section 900 and Clause 407, 408 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

6676

-

10502282.64

... More
Unit - Sqm Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

11740

-

336468.4

... More
Unit - Cum Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

14510.23

-

519611.34

... More
Unit - Cum Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

8127.21

-

1655268.86

... More
Unit - Sqm Providing road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads@250gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and free from streaks and holes etc. for finished item of work as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 803.4 of MoRT&H specification for road and bridge work (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

13644.68

-

3801817.19

... More
Unit - Sqm Painting two coats with synthetic enamel paint of approved quality and shade at any elevation on kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

278.56

-

46054.32

... More
Unit - No. Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67.

-

-

-

... More
80x60 cm size (Facility Information signs)

100

-

675133

... More
45x60 cm size (Route marker signs)

70

-

351880.2

... More
90cm size equilateral triangle (Cautionary signs)

74

-

421209.48

... More
60cm size circular (Mandatory Signs)

50

-

256680.5

... More
90cm high Octagon ( Stop Sign)

54

-

449712.54

... More
Unit - Sqm Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting fixed over alumunium sheeting 2mm thick or alumunium composite material sheet with overall thickness of 4mm vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) with area not exceeding 0.9 Sqm fixed over back support frame of minimum 35x35x3mm angle mounted on a mild steel circular pipe 65NB, firmly fixed on ground by means of properly designed foundation with M-25 grade cement concrete 45x45x60cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

26.88

-

329143.45

... More
Unit - Sqm Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting fixed over alumunium sheeting 2mm thick or alumunium composite material sheet with overall thickness of 4mm vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) with area exceeding 0.9 Sqm fixed over back support frame of minimum 40x40x5 mm angle mounted on two nos of mild steel circular pipe 65NB, 3.2 mm thickness & 4.50mtr total height firmly fixed on ground by means of properly designed foundation with M-25 grade cement concrete 45x45x60cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

8.64

-

112341.69

... More
Unit - No. Providing and fixing of bi-directional retro reflective raised pavement markers of approved colour, quality & make conforming to ASTM D-4280 made from injection moulded high impact polymer including cleaning, preparation of surface and fixing at position with approved quality adhesives including cost of all materials, labour, transportation, taxes, duties, sundries, T&P etc. complete and as per direction of Engineer-in-Charge.

8278

-

2334396

... More
Unit - Cum Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge.

7587.65

-

700795.35

... More
Unit - Cum Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

1162.96

-

775775.73

... More
Unit - Cum Providing and laying Plain cement concrete of grade M-15 of CD works etc using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 with formwork as per Section 900,1000,1500,1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

-

-

-

... More
In foundation as levelling course

879.55

-

4861501.53

... More
In sub-structure

2007.62

-

12438290.01

... More
Unit - Cum Providing and laying P.C.C M-20 grade in sub-structure as per approved drawing and technical specifications complete in all respect as per section 900, 1000, 1500, 1700, 2100 & 2200 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

254.8

-

1592059.2

... More
Unit - Cum Providing and laying R.C.C M-20 grade in drain works as per approved drawing and technical specifications complete in all respect as per section 900, 1000, 1500, 1700, 2100 & 2200, 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

-

-

-

... More
In foundation

666.7

-

4293794.68

... More
In wall

526.35

-

4627516.56

... More
In slab

301.5

-

2400708.83

... More
Unit - Cum Providing and laying R.C.C M-20 grade in super-structure as per approved drawing and technical specifications complete in all respect as per section 900, 1000, 1500, 1700, 2100 & 2200, 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

350.35

-

3700344.15

... More
Unit - Cum Providing and laying R.C.C M-25 grade in CD works as per approved drawing and technical specifications complete in all respect as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

-

-

-

... More
In foundation

325.62

-

2233522.01

... More
In Sub-structure

255.01

-

2800206.16

... More
In superstructure

156.09

-

1475596.82

... More
Unit - Cum Providing and laying R.C.C M-30 grade in wearing coat including cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900, 1000, 1500,1600, 1700 & 2702 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

36.62

-

489181.68

... More
Unit - Rmt. Construction of reinforced cement concrete crash barrier of M-40 grade with HYSD reinforcement confirming to IRC-21 and dowel bars 25mm dia, 450mm long at expnasion joints filled with premoulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure of MOST Circular No. RW-NH-33022-1-94-DO-III dtd.24 June 1994 as per dimension in the approved drawing and location as per Clause 811 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge.

101.95

-

392642.07

... More
Unit - MT Supplying, cutting, bending, binding, straightening, placing HYSD bars confirming to grade IS:1786-(Fe-500) for steel reinforcement works for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900,1000, 1600, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

146.33

-

12719196.76

... More
Unit - Cum Filling foundation and plinth with excavated earth ramming etc complete as per approved drawing and technical specifications as per Clause 304 and Section 900 of MORT&H Specifications for Road & Bridge works (5th Revision) complete in all respect & as per direction of the Engineer-in-Charge.

2167.29

-

133440.05

... More
Unit - Rmt. Providing weep holes in abutment, wing wall, retaining wall, toe wall and RCC drain etc with 100mm dia A.C. pipe as per approved drawing and technical specifications complete in all respect as per Section 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

1042.4

-

95869.53

... More
Unit - Cum Providing and laying of filter media/metal spall backing using 45 mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504.2.2 and Section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

479.33

-

994235.87

... More
Unit - Cum Gravel backing to aprons & revetments and providing filter material using gravel underneath pitching in slopes as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

84.82

-

160395.47

... More
Unit - Cum Dismantling of Rubble stone masonry in cement mortar including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

30.63

-

12825.09

... More
Unit - Cum Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

27.04

-

17252.33

... More
Unit - Cum Dismantling of Prestressed/ Reinforcement Cement Concrete Grade M-20 & above including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

7.88

-

13852.25

... More
Unit - Rmt. Removing all types of hume pipe including earthwork and dismantling of masonry works including T&P and scaffolding whenever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

80

-

22819.2

... More
Unit - Rmt. Providing, laying and fixing in position reinforced cement concrete NP4 hume pipes for culverts on first class bedding of granular materials including pointing ends fixing collars with cement mortar 1:3 for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

100

-

1039950

... More
Unit - Cum Rough stone dry packing in aprons and revetments with hard granite stone of size 0.0025 cum and above as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 and 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

551.38

-

1229014.99

... More
Unit - No. Providing and fixing drainage spouts in deck slab with 100 mm diameter G.I pipe for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900 & Clause 2705 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

14

-

19888.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.