Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date9 Jan 2025
Closing Soon18 Jan 2025
Tender Amount₹ 36,97,000 
Notes
Download

Costs

Summary

Construction Of Sc-hwc At Budhapada For The Year 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete of proportion (1:3:6) in F&F using 40mm size CBHG metal of approved quality including cost, conveyance& royalty of all materials and labour with T&P etc. complete in all respect .[A/R-2006,Page-43, Item no.3]

19.77

6371

125965.35

... More
Reinforced Cement concrete work of M-20 grade with 20mm & down grade black hard granite ( Crusher broken ) stone chips including hoisting & laying including cost, conveyance& royalty of all materials and labour with T&P etc. complete in all respect.[A/R-2006,Page-50, Item no.4] GROUND FLOOR Column Base

22.6

6451

145799.83

... More
Columns

0.9

6451

5806.19

... More
Plinth Beam

6.59

6451

42514.2

... More
Plinth Beam( PL TO F.F)

2.87

6451

18515.29

... More
Lintel

3.29

6451

21224.84

... More
Roof Beam

3.09

6451

19934.58

... More
Roof Slab

12.43

6451

80189.91

... More
Chajja

0.66

6451

4257.87

... More
Staircase

1.39

6451

8967.33

... More
FIRST FLOORColumns

2.67

6570

17544.46

... More
Lintels

3.21

6570

21092.78

... More
Roof Beam

2.71

6570

17807.3

... More
Roof Slab

10.88

6570

71492.04

... More
Chhaja

0.59

6570

3876.87

... More
Staircase

1.37

6570

9002.22

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

0.53

6708

3555.52

... More
Lintel band

0.43

6708

2884.67

... More
Roof slab

0.6

6708

4025.12

... More
Straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost, conveyanceof steel and all other materials, cost of all labour with T&P required for the work etc. complete.[A/R-2006,Page-52, Item no.9(A)] GROUND FLOOR

55.44

8579

475649.7

... More
FIRST FLOOR

18.98

8612

163461.64

... More
HEAD ROOM

1.4

8646

12105.41

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor. Column Base

83.3

747

62268.42

... More
Columns

9.56

747

7146.29

... More
Plinth Beam

22.61

1186

26833.1

... More
Column

45.9

1186

54473.2

... More
Lintel

26.33

570

15016.26

... More
Roof Beam

26.33

1186

31247.92

... More
Roof Slab

124.29

755

93838.95

... More
Chajja

10.87

755

8206.85

... More
Staircase

13.53

1043

14115.98

... More
FIRST FLOOR Columns

42

1347

56578.2

... More
Lintels

21.67

609

13208.95

... More
Roof Beam

21.67

1347

29191.66

... More
Roof Slab

83.91

829

69629.36

... More
Chhaja

9.22

829

7650.85

... More
Staircase

15.02

1177

17693.11

... More
HEAD ROOM & TERRACE FLOOR Column terrace Floor

8.4

1539

12931.55

... More
Lintel band

1.71

656

1122.84

... More
Roof slab

8

919

7356.64

... More
Fly Ash Brick masonary with Flyash Bricks of 25cm.x 12cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2 in cement mortar (1:6) in F&P including cost, conveyance& royalties of all materials, labour with T&P etc. complete in all respect.[A/R-2006,Page-71, Item no.03] IN FOUNDATION

17.53

5498

96389.76

... More
IN GROUND FLOOR

61.49

5536

340463.37

... More
IN FIRST FLOOR

33.29

5913

196858.08

... More
IN HEAD ROOM & TERRACE FLOOR

5.85

6346

37126.73

... More
Providing 20 mm thick grading Plaster using cement Plaster (1:4) on roof slab cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer – in – Charge. IN FIRST FLOOR

108.76

327

35569.96

... More
16mm thick cement plaster in cm (1:6) finished smooth to brick or stone masonry including cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-105, Item no.14] IN GROUND FLOOR

278.65

269

74956.85

... More
IN FIRST FLOOR

234.16

275

64595.38

... More
IN HEAD ROOM & TERRACE FLOOR

23.76

282

6722.18

... More
12mm thick cement plaster in cm (1:6) finished smooth to brick masonry including watering, curing, cost, conveyance,, royalties, labour with T&P etc. complete in all respect.[A/R-2006,Page-103, Item no.4] GROUND FLOOR

140.28

186

26151

... More
FIRST FLOOR

90.89

191

17359.99

... More
HEAD ROOM & TERRACE FLOOR

16.86

195

3299.84

... More
Wall painting to interior surface two coats with Plastic Emulsion Paint of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

278.65

265

73998.29

... More
FIRST FLOOR

234.16

271

63546.34

... More
HEAD ROOM

23.76

277

6590.79

... More
Wall painting to interior surface with single coat wall primer etc including cost of all materials& labour with T&P etc. complete in all respect as per the direction of EIC. GROUND FLOOR

278.65

73

20511.43

... More
FIRST FLOOR

234.16

75

17700.15

... More
HEAD ROOM

23.76

77

1844.25

... More
Wall painting two coats with weather coat of approved shade & approved make to give an even shade etc including cost of all materials& labour with T&P etc. complete in all floors as per the direction of EIC GROUND FLOOR

140.28

95

13459.87

... More
FIRST FLOOR

90.89

98

8915.4

... More
HEAD ROOM

16.86

100

1690.89

... More
Weather coat painting two coats over a coat of primer to exterior surface including cost of all materials and labour with T&P etc complete in all respect. GROUND FLOOR

140.28

175

24586.88

... More
FIRST FLOOR

90.89

179

16291.12

... More
HEAD ROOM

16.86

183

3090.94

... More
Supplying, fitting & fixing of Vetrified tilesI in floors treads of steps & landings of premium grade 8 mm to 10 mm thick confirming to IS specification 13756 of 25 cm x 25 cm colored printed series on 12 mm thick cement plaster of cement mortor 1:1 jointed with neat cement slurry & colouring pigments matching with tiles & etc complete including cost, conveyance, taxes royalties of all materials & cost of all labour T&P required for the work & etc complete GROUND FLOOR

88.23

1408

124275.48

... More
FIRST FLOOR

65.12

1421

92585.01

... More
Fixing of Ceramic tiles of size 30x30cm. in floors, Trades or steps & Landing on 25mm thick bed of cement morter(1:1) with pigments to match the shade of the tiles, including polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-89, Item no.16] GROUND FLOOR

15.67

990

15515.96

... More
FIRST FLOOR

10.09

1003

10124.21

... More
Fixing of Ceramic wall tiles in Dado with with cement morter(1:3) with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance& royalties of all materials, labour with T&P complete in all respect.[A/R-2006,Page-90, Item no.17] GROUND FLOOR

20.36

980

19965.63

... More
FIRST FLOOR

16.68

1000

16688.84

... More
Supplying, fitting & fixing of M.S plate door/ MS plate window with MS angle frame & grill in proper position including fixing with RCC (1:2:4) with hard balck broken granite stone chips of 12 mm to 20mm size with cost, conveyance, labour T & P etc complete as per specification & direction of the EIC GROUND FLOOR (Shutter)

8.84

2117

18717.02

19.07

2596

49522.88

... More
FIRST FLOOR(Shutter)

8.11

2117

17171.38

8.96

2596

23268.22

... More
HEAD ROOM

1.89

2596

4908.14

... More
Supplying fitting & fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mmx32xmmx2mm in 3 rows in stair case as per approved design and specification buffing polishing etc with all cost & conveyance etc complete. GROUND FLOOR

7.98

3589

28645.01

... More
FIRST FLOOR

6

3607

21642.6

... More
Providing, fitting, fixing of Aluminium. door with anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member with frame section as 9221 with tapered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 & 12mm thick pre laminated board fixed on door frame including all fitting ,cost of all materials,, labour, T&P etc. complete as per direction of Engineer in Charge. [A/R-2006,XIX. Other building items of SOR 2012, GROUND FLOOR

11.97

9302

111348.53

... More
FIRST FLOOR

8.82

9401

82921.49

... More
Painting with approved quality and shade of enamel paint two coats conforming to IS on steel or wood work to give an even shade with two coats of synthetic enamel paint over an under coat of primer of suitable shade of approved quality including cost of all materials with taxes and transportation all labour scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.GROUND FLOOR

27.8

255

7105.96

... More
FIRST FLOOR

8.34

262

2187.42

... More
HEAD ROOM

0.95

269

255.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.