Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date16 Feb 2024
Closing Date23 Feb 2024
Tender Amount₹ 36,89,648 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ground Floor

101.95

139355

1366.9

... More
Cement concrete (1:4:8) using 4 cm Hand broken h.g. metal.

-

-

-

... More
Ground Floor

24.64

138829

5634.3

... More
Fly ash Brick work (1:6) cement mortar with K.B bricks in Foundation & Basement work

-

-

-

... More
Ground Floor

28.97

150328

5189.1

... More
R.C.C. work of M-20 Grade with 20mm and down graded b.h.c.b.g. chips including hoisting and laying.

-

-

-

... More
Column Base

-

-

-

... More
Ground Floor

16.98

110169

6488.18

... More
Plinth Bend

-

-

-

... More
Ground Floor

10.34

71122

6878.43

... More
Column in Superstructure

-

-

-

... More
Ground Floor

5.61

79195

14116.93

... More
First Floor

3.39

53457

15769.12

... More
Window Sill & Shelves (FF)

-

-

-

... More
Ground Floor

9.72

4064

418.2

... More
First Floor

8.91

3726

418.2

... More
Lintel Bend (10")

-

-

-

... More
Ground Floor

5.11

52696

10312.33

... More
First Floor

2.15

24087

11203.6

... More
Chajja

-

-

-

... More
Ground Floor

6.72

6031

897.6

... More
First Floor

5.04

5045

1001

... More
Wall Beam

-

-

-

... More
Ground Floor

6.31

89077

14116.93

... More
First Floor

6.31

99503

15769.12

... More
Roof Slab

-

-

-

... More
Ground Floor

11.86

127446

10745.93

... More
First Floor

11.41

133769

11723.92

... More
Stair Case

-

-

-

... More
Ground Floor

1.48

18075

12213.23

... More
First Floor

1.48

19957

13484.7

... More
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.

-

-

-

... More
Ground Floor

6.07

52117

8586.07

... More
Fly ash Brick work (1:6) cement mortar with K.B bricks in superstructure

-

-

-

... More
Ground Floor

65.4

341873

5227.43

... More
First Floor

31.49

174020

5526.2

... More
12mm thick cement plaster in (1:6) cement mortar(Out Side)

-

-

-

... More
Ground Floor

247.15

40352

163.27

... More
First Floor

131.89

22330

169.31

... More
16mm thick cement plaster in (1:6) cement mortar (Inside)

-

-

-

... More
Ground Floor

525.43

121426

231.1

... More
First Floor

372.52

88100

236.5

... More
Cutting bending binding of Ms steel bar including cost of steel

-

-

-

... More
Ground Floor

36.87

316568

8586.07

... More
First Floor

27.33

275609

10084.51

... More
Cement Concrete (1:2:4) with 12mm size HGCB

8.8

64758

7358.9

... More
Providing fitting & fixing Plywood Flush door shutter complete

-

-

-

... More
Ground Floor

9.24

54861

5937.4

... More
First Floor

9.24

72825

7881.5

... More
Providing and fixing Iron Window Shutters with Angle Iron Frames and Grill including all

-

-

-

... More
Ground Floor

428.11

41954

98

... More
First Floor

428.11

45807

107

... More
Providing and fixing Iron Door Shutters with Angle Iron Frames including all

-

-

-

... More
Ground Floor

174.94

19418

111

... More
First Floor

174.94

19068

109

... More
Providing and fixing ACP Sheet Shutters with Aluminium Frame including all

-

-

-

... More
Aluminium

-

-

-

... More
Ground Floor

57.68

11392

197.5

... More
First Floor

71.73

31545

439.8

... More
ACP Sheet

-

-

-

... More
Ground Floor

4.56

5654

1240.1

... More
First Floor

5.67

7031

1240.1

... More
Supplying fiting fixing vetrified tile in floors

-

-

-

... More
Ground Floor

86.03

94040

1093.11

... More
First Floor

71.43

65951

923.3

... More
Supplying fiting fixing of wall tile

-

-

-

... More
Ground Floor

78.94

63744

807.5

... More
First Floor

62.9

48973

778.6

... More
Finishing wall surface with cement based wall putty

-

-

-

... More
Ground Floor

454.92

34009

74.76

... More
First Floor

365.26

25538

69.92

... More
Distempering two coata with any approved materials

-

-

-

... More
Ground Floor

454.92

35024

76.99

... More
First Floor

365.26

25838

70.74

... More
Out side weather coat with approved materials

-

-

-

... More
Ground Floor

364.15

30195

82.92

... More
First Floor

131.89

9269

70.28

... More
Door Window Painting

-

-

-

... More
Ground Floor

46.09

7307

158.55

... More
First Floor

66.88

9957

148.88

... More
Priming one coat of wall primer including cost of paint.

-

-

-

... More
Ground Floor

234

7853

33.56

... More
supplying, fitting and fixing of iron gate with shutter………etc complete

-

-

-

... More
Ground Floor

95.61

9274

97

... More
Painting two coats enamel paints over a coat of primer to wood / iron work including all charges.

-

-

-

... More
Ground Floor

2.7

600

222.53

... More
Supplying fitting fixing of stainless steel for hand raliing including all fitings

-

-

-

... More
Ground Floor

31.44

10655

338.9

... More
First Floor

188.64

63892

338.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.