Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Civil And Construction
Road Construction
Eprocure
Opening Date2 Mar 2023
Closing Date16 Mar 2023
Tender Amount₹ 4,24,54,401 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation trenches in hard soil within initial lead and lift including dressing and leveling the bed upto the required depth and depositing the excavated materials away from the working area etc.complete as per the specification and direction of the Engineer-in-charge.

2195.4

-

-

... More
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3 of MoRD.

5600

-

-

... More
Cutting in disintegrated rock not requiring blasting to be removed by pick axes & crow bars & depositing materials within 50m initial lead & 1.5m initial lift including rough dressing & stacking the useful materials separately as ordered as per specification and direction of the Engineer-in-Charge.

5600

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 & clause 305 of MoRT&H specification for Road & Bridge works as per direction of the Engineer-in-Charge.

21742.5

-

-

... More
Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.

329.42

-

-

... More
Construction of granular sub-base by providing Close Graded Granular sub-base Grading - III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete with all leads & lifts including cost, conveyance, royalty of all materials & cost of all labour & T&P required for the work etc as per clause 401 of MoSRT&H Specifications for Road & Bridge works as per direction of the Engineer-in-Charge.

3913.71

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming,requisite type of screening/ binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density including cost, conveyance, royalty of material, labour charges, T&P etc. complete as per Technical Specification Clause 404 of MoRTH specification for road & bridge works (4th revision) by manual means and as per direction of the Engineer-in-Charge.

-

-

-

... More
i)Grading No.-2 with stone screened dust

1539.66

-

-

... More
ii)Grading No.-3 with stone screened dust

1191.11

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means for low porosity surface including cost, conveyance, royalty of materials, labour charges, T&P etc, required for the work complete as per clause 502 of MoRT&H specification and direction of Engineer in Charge.

15881.4

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS -1) at the rate of 0.30 kg per sqm using emulsion pressure distributor on the prepared granular surfaces treated with primer using mechanical means including cost, conveyance, royalty of materials, labour charges, T&P etc, required for the work complete as per clause 503 of MoRT&H specification and direction of Engineer in Charge.

15881.4

-

-

... More
Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of 10mm nominal size (Grading-II) premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede,vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including cost, conveyance, royalty, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge.

397.04

-

-

... More
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification as per clause 1501 of MoRD and direction of Engineer in Charge.

911.34

-

-

... More
Fine dressing and turfing including transportation by mechanical means with all leads and lifts and placing of turfs in position and ramming with thapies including watering and cost of labour and all materials etc.complete as per the direction of the Engineer-in-charge.

12456

-

-

... More
Providing plain cement concrete M-15 with clean black hard granite stone aggregates of 40mm & down graded size of approved quality from approved quarry consistent with strength & cover of concrete & laying in position in layers not exceeding 150mm thick in the proper packing by means of vibrator to proper slope and to the required level including hoisting lowering laying concrete providing side shuttering & finishing all exposed surface smooth supplying & working of pumps, labour & T&P articles & all machineries, dewatering if required with cost conveyance, royality of all materials complete in all respect as per specification & direction of the Engineer-in-Charge.

-

-

-

... More
In Foundation

690.14

-

-

... More
In Substructure

1141.39

-

-

... More
RCC work M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250Kg / Sqm in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of steel tying the grills and placing in proper position as per direction of the Engineer in charge.

-

-

-

... More
In Foundation

141

-

-

... More
In Substructure

82.02

-

-

... More
In Super structure

99.32

-

-

... More
Providing & laying filter media in the rear of abutment & wing walls using 45mm. to 63mm size clean hard granaite hand broken metal of approved quality from approved quarry with smaller size towards soil & bigger size towards wall & providing over the entire surface behind the abutment, wing wall, return wall to the full height complete to firm condition complete as per drawing and technical specification clause 2504 of MORTH & direction of the Engineer-in-Charge including cost, conveyance, royality of all materials,labour charges, T&P articles required for the work etc. complete.

143.45

-

-

... More
Supply of HYSD bars confirming to grade Fe - 500 cutting bending, binding, lapping, splicing, welding etc. (conforming to IS 1786/1985 specification & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying in position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire,laping shall not be considered for payment at all which will be borne by the contractor ) standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987 as per direction of the Engineer in charge.

240.67

-

-

... More
R.C.C. of M-30 in wearing coat as per IRC specification having minimum cube strtength of 300Kg/per Sqcm.on 150mm.cube at 28 days using minimum quantity of cement as per clause 303.5of IRC - 21- 1987 & 1S - 456 - 2000 with clean crusher broken 20mm. size down graded hard granite chips of approved quality from approved quarry including lowering hoisting & laying concrete not exceeding 150mm. thick as per the direction of the Engineer-in-Charge to the required level with proper compaction of each layer of the concrete by means of vibrator providing side steel shuttering, watering, finishing the exposed surface smooth providing grooves & beads where necessary including supplying T&P article & all other machinery required including cost, conveyance, royality of all materials required for the work with all leads & lifts required etc. complete in all respects excluding cost, carriage of Steel & labour charges for straightening, cutting, bending, binding & tying the grills. etc complete as per Engineer in charge.

3.6

-

-

... More
Providing weepholes in brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipes, extending through the full width of the structures with slope of 1(V):20(H) towards drawing face including cost, conveyance, royalty of materials, labour charges, T&P etc, required for the work complete as per specification and direction of Engineer in Charge.

357

-

-

... More
Supplying and laying R.C.C. Hume pipes of NP3 class(confirming to relevant IS specification) for culverts including fixing collar with cement mortar 1:3 including cost, conveyance royality, labour, T&P,all other materials required for the work etc.complete as per direction of Engineer-in-charge.

-

-

-

... More
600 mm dia

20

-

-

... More
1000 mm dia

75

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain & foundation of other structures with all lead & lift by mechanical means graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 & MORD clause 301.5 as directed by Engineer in charge.

5846.55

-

-

... More
Rough stone dry packing in aprons & revetments with hard granite stone of 30cm.size & above having individual weight not less than 40kg. of approved quality from approved quarry including cost, conveyance, royality of all materials, cost of all labour including filling the interstics with small key stones by wedging & hammering & finishing to proper slope including dewatering & T&P articles etc. complete as per specification & direction of the Engineer-in-Charge.

192.32

-

-

... More
Construction of precast RCC railing of M25 grade , aggregate size not exceeding 12mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications including cost, conveyance, royalty of all materials, labour charges, T&P etc. required for the work complete in all respect as per specification and direction of Engineer-in-Charge.

43.2

-

-

... More
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 of MORD Specification for Rural roads including cost,conveyance,royalty, labour and T&P required for the work as per direction of the Engineer-in-Charge.

-

-

-

... More
i) 600mm equilateral triangle

20

-

-

... More
ii) 600mm dia circular

20

-

-

... More
Providing & fixing guard stones of M-15 grade guard /boundary stone /local stone of standard design as per IRC-25 fixed position as per drawing and Technical Specifications MORD clause 1704 and as per direction of Engineer-in-Charge.

300

-

-

... More
Reinforced cement concrete M15 grade Kilometer stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD and as per direction of Engineer-in-Charge.

-

-

-

... More
(i) 200 M Stone (Precast)

22

-

-

... More
(ii) Ordinary kilometer stone (Precast)

6

-

-

... More
(iii) 5 kilometer stone(Precast)

1

-

-

... More
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per Clause 1701 and Annexure 1700.1 of MORD Specification for Rural roads including cost,conveyance,royalty, labour and T&P required for the work and as per direction of Engineer-in-charge.

2

-

-

... More
Maintenance

-

-

-

... More
Restoration of Rain-cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh materials in layers not exceeding 250mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per clause 1902 of MORD specification for Rural roads by manual means and as per direction of Engineer-in -charge.

-

-

-

... More
1st Year

241.31

-

-

... More
2nd Year

289.57

-

-

... More
3rd Year

337.83

-

-

... More
4th Year

386.1

-

-

... More
5th Year

434.36

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of materials/ irregularities of shoulders to the design levels by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000m as per clause 1903 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

495

-

-

... More
2nd Year

594

-

-

... More
3rd Year

693

-

-

... More
4th Year

792

-

-

... More
5th Year

891

-

-

... More
Maintenance of earthen shoulder Stripping of excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per clause 1903 of MORD specification for Rural roads and as per direction of Engineer-in- charge.

-

-

-

... More
1st Year

330

-

-

... More
2nd Year

396

-

-

... More
3rd Year

462

-

-

... More
4th Year

528

-

-

... More
5th Year

594

-

-

... More
Maintenance of Bituminous surface road i.e. repair to pot holes and removal of loose materials, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre mix carpet and seal coat as per clause 1904.2 of MORD specification for Rural roads and as per direction of Engineer-in- charge.

-

-

-

... More
1st Year

510.01

-

-

... More
2nd Year

615.61

-

-

... More
3rd Year

721.21

-

-

... More
4th Year

826.82

-

-

... More
5th Year

932.42

-

-

... More
Maintenance of Hume Pipe culverts by way of clearing , cleaning erosion repair, repair to crack, parapet wall and protection work as per clause 1908 of MORD specification for Rural roads and as per direction of Engineer- in- charge.

-

-

-

... More
1st Year

12

-

-

... More
2nd Year

12

-

-

... More
3rd Year

12

-

-

... More
4th Year

12

-

-

... More
5th Year

12

-

-

... More
Maintenance of Road Signs by way of cleaning and repainting of mandatory. Regulatory/ cautionary/ informatory and place identification sign board as per clause 1910 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

5.5

-

-

... More
2nd Year

5.5

-

-

... More
3rd Year

5.5

-

-

... More
4th Year

5.5

-

-

... More
5th Year

5.5

-

-

... More
Maintenance of 200 m stones and km stones by way of refixing of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200mtr. and KM. stone and 5 km stone as per clause 1912 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

5.5

-

-

... More
2nd Year

5.5

-

-

... More
3rd Year

5.5

-

-

... More
4th Year

5.5

-

-

... More
5th Year

5.5

-

-

... More
Cutting of branches of trees from Roadway or with a R.O.W. including disposal of wood and leaves to suitable location as per clause 1914 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

20

-

-

... More
2nd Year

30

-

-

... More
3rd Year

40

-

-

... More
4th Year

30

-

-

... More
5th Year

35

-

-

... More
Cutting of shrubs from roadway or with in R.O.W. and disposal of shrubs to suitable location as per clause 1914 of MORD specification for Rural roads and as per direction of Engineer-in- charge.

-

-

-

... More
1st Year

55

-

-

... More
2nd Year

55

-

-

... More
3rd Year

55

-

-

... More
4th Year

55

-

-

... More
5th Year

55

-

-

... More
Trimming of grass and weeds from shoulder, berms and disposing off the same to suitable location as per clause 1914 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

252

-

-

... More
2nd Year

300

-

-

... More
3rd Year

349.5

-

-

... More
4th Year

399

-

-

... More
5th Year

448.5

-

-

... More
Maintenance of Slab Type Culverts by way of clearing, cleaning,erosion repair, repairs to cracks, parapet walls and protection works as per drawing and Technical Specification clause 1908 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

5

-

-

... More
2nd Year

5

-

-

... More
3rd Year

5

-

-

... More
4th Year

5

-

-

... More
5th Year

5

-

-

... More
Maintenance and repair of RCC railing to bring it to the original shape cleaning and repairing as per drawing and technical specification clause 1911 and as per direction of Engineer-in-Charge.

-

-

-

... More
1st Year

15

-

-

... More
2nd Year

15

-

-

... More
3rd Year

15

-

-

... More
4th Year

15

-

-

... More
5th Year

15

-

-

... More
White washing two coats on parapet walls of CD works and tree trunks including preparation of surface by cleaning scraping etc as per clause 1915 of MORD specification for Rural roads and as per direction of Engineer-in-charge.

-

-

-

... More
1st Year

252

-

-

... More
2nd Year

300

-

-

... More
3rd Year

349.5

-

-

... More
4th Year

399

-

-

... More
5th Year

448.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.