Rural Development Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date29 Jun 2024
Closing Date10 Jul 2024
Tender Amount₹ 39,59,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.C.M-20 with 20mm and down graded size h.g. chips of approved quality from approved quarry including hoisting, laying concrete to required thickness with cost, conveyance of materials labour T&P required for the work including shuttering, shuttering watering curing and royalty etc.complete as per specification and direction of the Engineer-in-charge.

-

-

-

... More
column base

14.15

109449

7734.95

... More
Column and Beam(GROUND FLOOR)

8.23

128047

15558.6

... More
Column and Beam(1ST FLOOR)

6.88

118935

17287.15

... More
Column and Beam(2ND FLOOR)

1.2

23228

19356.7

... More
Grade beam

6.57

50818

7734.95

... More
Lintel(Ground floor)

3.28

48523

14793.8

... More
Lintel(1st floor)

2.7

44197

16369.3

... More
Lintel(2nd floor)

0.46

8397

18255.4

... More
Chajja(Ground floor)

5.99

7334

1224.5

... More
Chajja(1st floor)

4.74

6538

1379.5

... More
Roof slab(Ground floor)

13.41

189779

14152.1

... More
Roof slab(1st floor)

12.64

197175

15599.3

... More
Roof slab(2nd floor)

1.57

27210

17331.25

... More
Stair case(Ground floor)

1.76

27293

15507.8

... More
Stair case(1st floor)

1.76

30318

17226.2

... More
Supplying, fitting and palcing uncoated HYSD bar rainforcement including cutting, bending, binding of M.S. rod including cost of all materials, labour T&P etc. complete as per direction of the Engineer-in-charge.

-

-

-

... More
HYSD(Ground FLOOR)

44.86

388314

8656.15

... More
HYSD(1ST FLOOR)

23.3

202297

8682.3

... More
HYSD(2nd FLOOR)

3.23

28132

8709.7

... More
Fly ash brick masonary in C.M.(1:6) with Fly ash brick of approved quality and size including splays cutting, circular moulding with cost, conveyance of materials including royalty, watering,curing etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
In Foundation & Plinth

7.06

36241

5133.4

... More
In Superstructure(Ground Floor)

35.03

180991

5166.75

... More
In Superstructure(1st Floor)

27.54

150361

5459.75

... More
In Superstructure(2nd Floor)

15.68

90892

5796.7

... More
Flyash brick masonary in C.M.(1:4) with flyash. brick of approved quality and size in superstructure including splays cutting, circular moulding with cost, conveyance of materials including royalty, watering,curing etc.complete.

-

-

-

... More
In Superstructure(Ground Floor)

4.67

25462

5452.25

... More
In Superstructure(1st Floor)

6.37

34778

5459.75

... More
Cement concrete (1:2:4) with 12mm size H.G.chip of approved quality from approved quarry in foundation including hoisting laying concrete including royalty, watering curing etc.complete.

1.57

13128

8362.35

... More
12mm thick C.P. in C.M.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
12mm thick C.P(Ground floor)

131.87

21870

165.85

... More
12mm thick C.P(1st floor)

115.13

19514

169.5

... More
12mm thick C.P(2nd floor)

68.65

11890

173.2

... More
16mm thick C.P. in C.M.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
16mm thick C.P(Ground floor)

360.53

84436

234.2

... More
16mm thick C.P(1st floor)

290.66

69656

239.65

... More
16mm thick C.P(2nd floor)

62.23

15258

245.2

... More
6mm thick C.P. in C.M.(1:4) to RCC surface finished smooth including closed deep chiping and slury treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
6mm thick C.P(Ground floor)

86.36

15600

180.65

... More
6mm thick C.P(1st floor)

71.82

13275

184.85

... More
6mm thick C.P(2nd floor)

7.48

1415

189.25

... More
Supplying fitting and fixing vetrified tile in floors of size 600mmx600mm of approved make with appliction of polymer modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materials, labour T&P etc.required for the work.

-

-

-

... More
Vetrified tiles(Ground floor)

51.82

77144

1488.7

... More
Vetrified tiles(1st floor)

66.58

100665

1511.95

... More
Supplying, fitting and fixing Granaite tile in floors of approved make conformaing to IS:13755 laid on 20 mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, etc complete as per direction of the Engineer-in-charge.

-

-

-

... More
Granaite tile(Ground floor)

13.26

31516

2376.8

... More
Granaite tile(1st floor)

13.45

32280

2400.05

... More
Fixing glazed Ceramic tiles in floors,treads (400mm x 400mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
Ceramic tiles in floors(Ground floor)

10.08

12652

1255.25

... More
Ceramic tiles in floors(1st floor)

4.83

6174

1278.45

... More
Fixing vertified wall tiles in dados, (600mm x 600mm) skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
vertified wall tiles in dados(Ground floor)

133.06

209662

1575.7

... More
vertified wall tiles in dados(1st floor)

62.88

101183

1609.15

... More
Fixing Vetrified industrials floor tiles of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size (300mm x 300mm) in floor and in rises of steps on 25mm thick bed of cement plaster (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.etc.complete as per direction of the Engineer-in-charge.

15.9

22326

1404.2

... More
Supplying, fitting and fixing MS Door & window shutter including cost of all materials etc.complete as per direction of the Engineer-in-charge.

833.26

120493

144.61

... More
Supplying, fitting and fixing MS Door & window shutter including cost of all materials etc.complete as per direction of the Engineer-in-charge.(1ST FLOOR)

703.5

101729

144.61

... More
Supplying, fitting and fixing MS Door & window shutter including cost of all materials etc.complete as per direction of the Engineer-in-charge.(2ND FLOOR)

73.5

10628

144.61

... More
Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32mm x 2mm @ 0.90 mtr C/C and stainless aquare pipe bracing of size case as per approved design and specification, buffing, polishing etc. with the cost, conveyance taxses of all material, cost of all labour etccomplete as per direction of the Engineer-in-charge.

35.05

107044

3054.05

... More
Finishing wall surface with Acrylic wall putty (water based) of approved make and finish smooth and even surface to receive painting including cost of all materials, labour and T&P etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
Acrylic wall putty(Ground floor)

446.88

42922

96.05

... More
Acrylic wall putty(1st floor)

362.48

35341

97.5

... More
Acrylic wall putty(2nd floor)

69.71

6904

99.05

... More
Priming 1 coat with wall primer water bond cement primer includingcost, conveyance and taxes of all materials etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
Wall primer(Ground floor)

578.76

38661

66.8

... More
Wall primer (1st floor)

477.61

32668

68.4

... More
Wall primer (2nd floor)

138.36

9692

70.05

... More
Wall painting two coats with plastic emulationon paint of approved shae on new work to give an even shade including cost, conveyance of materials labour, T&P etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
Plastic emultion paint (Ground floor)

446.88

39839

89.15

... More
Plastic emultion paint (1st floor)

362.48

33348

92

... More
Plastic emultion paint (1st floor)

69.71

6625

95.05

... More
Finishing wall surface with two coats of weather coat over a coat of primer including cost, conveyance and taxes of materials with all labour and T&P etc.complete as per direction of the Engineer-in-charge.

-

-

-

... More
Weather coat (Ground floor)

131.87

10846

82.25

... More
Weather coat (1st floor)

115.13

9803

85.15

... More
Weather coat (2nd floor)

68.65

6051

88.15

... More
Priming one coat of primer on the steel item with any approved paint including cost of paint.

-

-

-

... More
Priming steel item(Ground floor)

64.9

3965

61.1

... More
Priming steel item (1st floor)

53.09

4034

76

... More
Priming steel item (2nd floor)

5.12

467

91.3

... More
Painting two coats on the steel item with any approved paint including cost of paint.

-

-

-

... More
Painting steel item(Ground floor)

64.9

9906

152.65

... More
Painting steel item (1st floor)

53.09

8305

156.45

... More
Painting steel item (2nd floor)

5.12

820

160.35

... More
Providing, fitting and fixing of aluminium door with OEL anodised al door section of 9202 as vertical member 9201 as top member and 9200 as bottom and middle member and 6mm plain glass in top portion with 12mm thick prelaminated board in bottom portion fixed on door fame by means of jointing angle no.1855 including all cost of labour T&P and hire charges of drilling machine labour charges etc.complete as per specification and direction of the Engineer-in-charge.

3.25

23056

7094.35

... More
Dismetalling of grading concrete from RCC roof and stacking the useful materials for reuse and removing the debris away from work site with all labour & T&P etc.complete as per direction of the Engineer-in-charge.

9.05

11731

1296.25

... More
Dismetalling and removing brick masonry upto 3m height including stacking useful materials for reuse etc.complete as per direction of the Engineer-in-charge.

9.96

12230

1228

... More
Dismentling and removing wrought and roof frame and removing the debries away from site. with all labour & T&P etc.complete as per direction of the Engineer-in-charge.

0.07

78

1122.05

... More
Dismentling and removing A.C. sheet roofing and removing the debries away from site. with all labour & T&P etc.complete as per direction of the Engineer-in-charge.

14.87

1185

79.75

... More
Dismentling and removing old tile flooringand removing the debries away from site. with all labour & T&P etc.complete as per direction of the Engineer-in-charge.

63.73

7003

109.9

... More
Dismentling and removing Doors and windows and removing the debries away from site. and removing the debries away from site. with all labour & T&P etc.complete as per direction of the Engineer-in-charge.

11.24

3937

350.35

... More
Supplying, fitting and fixing Ultra-Designer pre-cast concrete paver tile in floors treads of steps and landingon 80 mm thick bed of cement mortar(1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etccomplete as per direction of the Engineer-in-charge.

15.61

16694

1069.5

... More
Earth work in in hard soil with mechanical lead and lift including rough dressing and and breaking clouds maximum 5cm to 7cm laying in layers not exceeding 0.30m in depth etc.complete as per direction of the Engineer-in-charge.

3.66

1184

323.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.