Rural Development Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 3,780Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CERWI_108940_11Tender No
SETIG-ONLINE-03-2024-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://http://rdodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
FIRST FLOOR
287.09
81
23311.71
... More
Distempering two coats to walls with distemper etc. complete as per direction of Engineer in charge.
289.63
86
25079.06
... More
FIRST FLOOR
287.09
88
25436.17
... More
Earthwork in excavation in hard soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3cm in depth etc complete as per the direction of the E.I.C
12.78
270
3462.1
... More
Filling foundation and plinth with sand,well watering including cost, conveyance, royalty, taxes all labour T&P etc. complete in all respect as per specification and direction of the Engineer-in-charge.
6.39
624
3989.4
... More
C.C (1:4:8) using 40 mm hg metal in foundation as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge
4.26
5381
22924.55
... More
Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge.
3.65
7447
27183.74
... More
Supplying, fitting & fixing of Chequered tiles make in floors, treads or steps and landing on 25 mm thick bed of cement mortar 1:1 (1 cement: 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubing and polishing with cost,coveyance of all materials etc complete as per the direction of the E.I.C
69.25
1056
73160.55
... More
Finishing walls with weather coat paint of approved shade on new work two coat to give an even shade inculding cost of paint. etc. complete in all respect as per specification and direction of the Engineer-in-charge
305.83
81
24894.56
... More
FIRST FLOOR
108.55
83
9009.65
... More
Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance , taxes of all materials, all labour and T&P requred for the work including the cost of primer, all other materials etc complete including 1% cess as per direction of the Engineer in charge.
37.46
255
9574.78
... More
FIRST FLOOR
44.7
262
11720.34
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements