Puri Konark Development Authority Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 73,263Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_PKDA_61658_1Bid Award Id
ViewTender No
TCN No 3 of 2020-21Tender Authority
Puri Konark Development Authority ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling in foundation and plinth by excavated earth including cost of all labour, T&P etc. all complete as per direction of Engineer-in-Charge 2/3rd of item No. 1.
477.98
-
155.76
Supplying all labour, materials and T&P for providing Cement concrete (1:1.5:3) for R.C.C. works with 12mm size hard granite chips including hoisting and laying but includng cost of rigid & smooth centering , shuttering & dismantling after use but excluding cost of MS reinforcement etc all complete as per direction of Engineer-in-Charge
-
-
-
Base of column and footing
118.86
-
7001.22
Plinth Bend
67.8
-
10547.19
Top coping
33.59
-
10547.19
Col. Super structure
39.31
-
13969
Supplyin all material, labour, T& P for providing M.S. Reinforcement for R.C.C. work including labor for cutting, bending, binding & tying the grills & placing in position including cost of binding wire & reinforcement including conveyance to site, complete as per direction of Engineer in charge.(FE 415 grade sttel of SAIL/RSP/JINDAL/VIZAG MAKE)
286
-
6886.82
Supplyin all material, labour, T& P for providing Fly ash brick masonary work using fly ash brick of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance ± 8 percent in cement mortar (1:6) in superstructure including cost all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge .
332.7
-
4291.6
Supplying all labour, materials and T&P for providing 12mm. thick cement plaster (1:6) on the wall etc, all labour ,materials with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
3191.12
-
127.77
Supplying all labour, materials and T&P for providing 6mm thick cement plaster (1:4) on the RCC surface including close deep chipping with slurry treatment with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
128.84
-
150.97
Supplying all labour, materials and T&P for providing one coat of cement primer on the wall etc, all labour ,materials with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
3319.96
-
56.74
Supplying all labour, materials and T&P for providing two coats of weather paint on the plastered surface of wall etc, all labour ,materials with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
3319.96
-
69.14
Supllying all material, labaour & T&P for fitting and fixing of Gate made out of GI square bar as per approved drawing, desing and specification including cost lead and taxes etc. complete as per direction of Engineer-in-Charge
371.25
-
90
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements