Public Health Engineering Organisation Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 6,47,412Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHEO_107208_1Bid Award Id
ViewTender No
SEPHBGR 20/2024-25Tender Authority
Public Health Engineering Organisation ViewPurchaser Address
-Website
http://https://pheoodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply, installation, testing & commissioning of DI Pilot Altitude flow Control valve of DOUBLE CHAMBER (Globe Type) with orfice plate for propose to close valve at maxium water level of ESR & open the refill the ESR AT LOWER ALTITUDE Control valve should be worked at minimum pressuer 1kg/cm². An altitude control valve control at level of a tank .The altitude valve will remain open while the tank is not full and it will close when the ntanks reaches its maximum level. The opening & closing the valve will work without extranal power soures (electric,pneumatic or man power ). It will work automatically. The body, Spool & Cover will be DI ASTM A- 536 standard, Spring, steam, Jam nut, Cover bolt, & cover waser shouuld be SS, DI/SS Diaphragm plate Nytrill/Nylon diaphragm, Brozen cover bushing, Seat plate & ring . The Approved make : (VAG/SINGER/ BURMAD-700/DORT-S300 ) with 2 nos solenoid including cost of all materials with all taxes transportion to site /Storage with insurance.
i) 150mm
2
257279
514558
... More
ii) 200 mm
4
336828
1347312
... More
Design, Drawing and Construction of RCC frame structure single stored building with double storey foundation for watch man with Toilet block at ERS site and complete as per the direction of Engineer-in-charge(3m X 3m) 3Nos
27
16080
434160.81
... More
Boundary Wall:-
Supplying all labour, T&P and Earthwork in all kinds of soil leveling the bed & including sundries, supervision charges, contractor profit & labour cess etc, & as per the direction of engineer- in-charge.
i)Column Base
104.98
293
30763.34
... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty, contractor profit & labour cess etc, all complete as per specification and direction of Engineer-in-charge.
i)Column Base
11.66
563
6564.58
... More
Supplying all labour, T&P and providing Cement Concrete (1:3:6) using 4cm HBG crusher metal including watering curing, supervision conveyance of all materials to worksite, payment of royalty, taxes etc. all complete in F&P as per specification and direction of the Engineer-in-charge.
i)Column Base
11.66
5600
65305.33
... More
R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken Granite chips
i)Column Base,ii) Tappered iii) Column Base Upto Plinth Excluding PL Beam,iv) Plinth Beam,v) Column
86.41
5780
499458.44
... More
Supplying all materials, labour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
i)Tappered,ii)Column base,iii)Column Base up to plinth,iv)Plinth beam
514.8
247
127413
... More
Supplying all materials, labour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
i)Column
259.2
1189
308266.56
... More
Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and laying the grill and position including cost of binding wire 18 to 20 gauge, conveyance of all materials to Work site, payment of royalty, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge (SAIL STEEL TMT-EQR 500/IS 1786 Fe 500 D) Taking 0.80Qtl /cum
69.12
8693
600887.81
... More
Supplying all materials, labour, T&P and Providing Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strength not Less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar(1:6 ) in S/S including cost of conveyance & royalty, sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. wall
186.3
5837
1087507.62
... More
Supplying all materials, labour, T&P and making 12mm thick cement plaster in cement mortar (1:6) for brick or stone masonry work for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, contractor profit & labour cess as per the direction of engineer-in-charge. (Outside wall)
1102.5
185
204183
... More
Supplying all materials, labour, T&P and making 16mm thick cement plaster in cement mortar (1:6) for brick or stone masonry work for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, contractor profit & labour cess as per the direction of engineer-in-charge. (Inside wall)
990
267
264627
... More
Supplying all materials, labour, T&P and filling of foundation and plinth with excavated materials with all kinds of soil as per the direction of engineer-in-charge.
1/3 of Qnty of item Earth work
34.99
162
5696.37
... More
Supplying all materials, labour, T&P and providing Priming 1 coat with any appproved Primer including all materials, conveyance, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. (on Plastered surface)
2092.5
81
170329.5
... More
Supplying all materials, labour, T&P and providing two coat of Weather Coats with any approved shades including cost of conveyance, brushes, sundries, contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge
2092.5
99
208622.25
... More
Pillar and Gate Supplying all labour, T&P and Earthwork in excavation in Stony earth and gravels mixed with stone & boulders not exceeding 0.014 cum in volume with in 50mtr. Initial lead & 1.50m. initial lift including rough dressing, breaking clods & laying in layers not exceeding 0.30m In depth, leveling the bed & including sundries, supervision charges, contractor profit & labour cess etc, & as per the direction of engineer- in-charge. i)Column base
10.38
293
3041.76
... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty, contractor profit & labour cess etc, all complete as per specification and direction of Engineer-in-charge.
0.87
563
489.81
... More
Supplying all labour, T&P and providing Cement Concrete (1:3:6) using 4cm HBG crusher metal including watering curing, supervision conveyance of all materials to worksite, payment of royalty, taxes etc. all complete in F&P as per specification and direction of the Engineer-in-charge.
i)Column base
0.87
5600
4872.7
... More
R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken Granite chips (Beam , column, column base, tapper)
5.31
5780
30692.33
... More
Supplying all materials, labour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.(Column base , plinthbeam, Column, )
11.58
247
2866.05
... More
Supplying all materials, labour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge., (Column, )
21.6
1189
25688.88
... More
Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and laying the grill and position including cost of binding wire 18 to 20 gauge, conveyance of all materials to Work site, payment of royalty, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge (SAIL STEEL TMT-EQR 500/IS 1786 Fe 500 D) taking 0.8 Qtl/cum
4.26
8693
37033.88
... More
6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment
21.6
214
4622.4
... More
Supplying all materials, labour, T&P and filling of foundation and plinth with excavated materials with all kinds of soil as per the direction of engineer-in-charge.
1/3 of Qnty of item earth work
3.45
162
561.66
... More
Supplying all materials, labour, T&P and providing Priming 1 coat with any appproved Primer including all materials, conveyance, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. (on Plastered surface)
21.6
81
1758.24
... More
Supplying all materials, labour, T&P and providing two coat of Weather Coats with any approved shades including cost of conveyance, brushes, sundries, contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge
21.6
99
2153.52
... More
Supplying all materials, labour, T&P and fitting & fixinh of SS Gate proving rincluding cost of conveyance , brushess sundries , contractor profit & labour cess etc all complet as per the direction of EIC,
2 Leaf SS Gate (Size 6.0 M x 1.8 M Ht.) @ 30 KG/Sqm
972
130
126360
... More
1 Leaf SS Gate (Size 1.3 M x 1.8 M Ht.) @ 30 KG/Sqm
210.6
130
27378
... More
Approch Road Supplying all materials, labours, T&P , and filling of road surface with borrow earth (1.0mtr ) from the approved Quantity and compacting to the required density with testing including cost of royality lead & transportation & labour cess etc all complete as per the direction of EIC,
900
154
139347
... More
Construction of granular sub-base by providing Coarse graded Grading-II material as per Table 400-2, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401, with Add 25% of metal volume for consolidation
75
1740
130507.5
... More
roviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works.(Latest Revision)
138
2340
322966.92
... More
Supplying all labour, T&P and providing Cement Concrete (1:3:6) using 4cm HBG crusher metal including watering curing, supervision conveyance of all materials to worksite, payment of royalty, taxes etc. all complete in F&P as per specification and direction of the Engineer-in-charge.
60
5600
336048
... More
M30 Grade concrete using 20mm to 10 mm size crushed stone aggregate mixed by concrete miser layiong in layers compacting by vibrator with proper cambering and filling berm by excavated earth and all leads and lift including frame work etc .complet in all respective as per scope & Technical specification
90
6189
557064
... More
4Year Annual maintenance cost
Supply of manpower consisting of 2 number of unskilled labour as a valve operator/watchman daily basis for 4 year operation and maintenance for keeping sorrounding of ESR and premises clean,detection of leakages and mending and weather coating and display board writing if required (including contribution towards EPF, ESI, Labour cess, Contractors Profit & OH Charges but excluding cost of chemicals & Energy charges) under this project as per the instruction of Engineer-in-charge.
1
1740139
1740139.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements