Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Public Health Engineering Organisation - PHEO Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date28 Oct 2024
Closing Date13 Nov 2024
Tender Amount₹ 7,71,61,673 
Notes
Download

Costs

Summary

Construction Of 11mld Wtp And Other Ancillary Works For Improvement Of Water Supply To Purusottampur Nac Under Amrut 2.0 (swap-iii) Including 5 Years Operation And Maintenance Cost.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying all labour, T&P and Excavation of founation in hard rock (granite) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the Department and direction of the Engineer-in-charge.

592.8

2982

1767729.6

... More
COMPOUND WALL at WTP site - Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge

51.03

293

14953.83

... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty, contractor profit & labour cess etc, all complete as per specification and direction of Engineer-in-charge.

5.67

1198

6796.63

... More
Supplying all labour, T&P and providing Cement Concrete (1:3:6) using 4cm HBG crusher metal including watering curing, supervision conveyance of all materials to worksite, payment of royalty, all taxes etc. all complete in F&P as per specification and direction of the Engineer-in-charge.

5.67

6320

35835.53

... More
Supplying all labour, materials, T&P and providing Cement concrete M20 grade with crusher broken hard granite chips of 20mm & 12mm size for RCC works including cost of conveyance & royalty, all taxes , sundries, watering, curing & lifting & laying concrete at a height of 5 mtr. Maximum, contractor profit & labour cess etc all complete etc all complete (Excluding cost of reinforcement & centering & shuttering)

39.7

6425

255076.47

... More
Supplying all materials, labour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.(i)Column Base

246

247

60885

... More
Column

126

1189

149851.8

... More
Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and laying the grill and position including cost of binding wire 18 to 20 gauge, conveyance of all materials to Work site, payment of royalty, all taxes , contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge (SAIL STEEL TMT-EQR 500/IS 1786 Fe 500 D)

31.76

8687

275925.16

... More
Supplying all materials, labour, T&P and Providing Brick work with Fly Ash Bricks 23cm x 11cm x 8cm size having crushing strength not Less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar(1:6 ) in S/S including cost of conveyance & royalty, all taxes , sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge.

91.13

5666

516397.26

... More
Supplying all materials, labour, T&P and making 12mm thick cement plaster in cement mortar (1:6) for brick or stone masonry work for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, all taxes , contractor profit & labour cess as per the direction of engineer-in-charge.

539

193

104458.2

... More
Supplying all materials, labour, T&P and making 16mm thick cement plaster in cement mortar (1:6) for brick or stone masonry work for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, all taxes , , contractor profit & labour cess as per the direction of engineer-in-charge.

484

277

134406.8

... More
Supplying all materials, labour, T&P and filling of foundation and plinth with excavated materials with all kinds of soil as per the direction of engineer-in-charge.

17.01

162

2769.23

... More
Supplying all materials, labour, T&P and providing Priming 1 coat with any appproved Primer including all materials, conveyance, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. (on Plastered surface)

1023

81

83272.2

... More
Supplying all materials, labour, T&P and providing two coat of Weather Coats with any approved shades including cost of conveyance, brushes, sundries, contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge

1023

99

101993.1

... More
2 Leaf MS/SS Gate fixed with RCC Pillar- Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge

3.46

293

1013.92

... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty, contractor profit & labour cess etc, all complete as per specification and direction of Engineer-in-charge.

0.29

1198

347.62

... More
Supplying all labour, T&P and providing Cement Concrete (1:3:6) using 4cm HBG crusher metal including watering curing, supervision conveyance of all materials to worksite, payment of royalty, taxes etc. all complete in F&P as per specification and direction of the Engineer-in-charge.

0.29

6320

1832.86

... More
Supplying all labour, materials, T&P and providing Cement concrete (1:1½ :3) with crusher broken hard granite chips on 12mm size RCC works including cost of conveyance & royalty, sundries, watering, curing &lifting & laying concrete at a height of 5 mtr. Maximum, contractor profit & labour cess etc all complete etc all complete (Excluding cost of reinforcement & centering & shuttering)

2.02

6425

12978.7

... More
Supplying all materials, labour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.

4.84

247

1197.9

... More
Column

0.9

1189

1070.37

... More
Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and laying the grill and position including cost of binding wire 18 to 20 gauge, conveyance of all materials to Work site, payment of royalty, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge (SAIL STEEL TMT-EQR 500/IS 1786 Fe 500 D)

1.62

8687

14074.27

... More
Supplying of all labour T&P and mterials for 6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment as per direction of Engineer in charge.

3.6

179

647.28

... More
Supplying all materials, labour, T&P and filling of foundation and plinth with excavated materials with all kinds of soil as per the direction of engineer-in-charge.

1.15

162

187.22

... More
Supplying all materials, labour, T&P and providing Priming 1 coat with any appproved Primer including all materials, conveyance, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. (on Plastered surface)

3.6

81

293.04

... More
Supplying all materials, labour, T&P and providing two coat of Weather Coats with any approved shades including cost of conveyance, brushes, sundries, contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge

3.6

99

358.92

... More
Supplying all materials, labour, T&P , fabricating and Fitting & Fixing of 304 Grade Stainless Steel ( profile of TATA / JINDAL make ) Gate including cost , conveyance, contractor profit & labour cess etc., all complete as per the direction of Engineer-in-charge . (i)2 Leaf SS Gate (Size 6.0 M x 1.8 M Ht.)

324

237

76943.52

... More
1 Leaf SS Gate (Size 1.3 M x 1.8 M Ht.)

70.2

237

16671.1

... More
Supply of man power and materials for Operation of 11 MLD capacity WTP and maintenance of all civil structures , mechanical , electrical & instrumentation installations of 11.00 MLD capacity WTP for 5 years as per detailed instructions narrated elsewhere in the attached DTCN and supplying of bulb, Tube all Electrical and mechanical repairs of every component of WTP including repair of Fans, blowers, pumps , annual painting, maintenaining sanitation in premises etc cost for five years ( Excluding cost of operational energy charges of WTP and cost of Chemicals required for treatment of raw water )

1

10924370

10924370



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.