Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date7 Mar 2025
Closing Soon12 Mar 2025
Tender Amount₹ 6,27,76,000 
Notes
Download

AI Insights

Bid Capacity
... View More
Assessed Available Bid Capacity = (A * N * 2) - B Where: A = Maximum value of Civil Engineering works executed in any one year during the last five years (updated to the current price level) N = Number of years prescribed for completion of the works for which the bids are invited (for work completion period less than one year, the value may be taken as one) B = Value of current price level of the existing commitments & ongoing works to be completed during the next years (period of completion of works for which bids are invited)
Technical Capacity
... View More
The required prior work experience for the bidder is not explicitly mentioned in terms of years. However, the bidder needs to submit information on their bid capacity, including works for which bids have been finalized in their favor and works that are yet to be completed. The bidder is required to submit details of their work experience in Format-II (Work in hand), which includes the description of work, place and state, contract number and date, name and address of the employer, value of the contract, stipulated period of completion, value of work already executed, and value of work remaining to be completed. Regarding the value and percentage of similar works completed, the bidder needs to submit the value of work already executed and the value of work remaining to be completed. However, a specific percentage of similar works completed is not mentioned. The bidder must demonstrate having experience and resources sufficient to meet the aggregate of the qualifying criteria for the individual contracts, and details of works of similar type and magnitude carried out by the tenderer should be provided in Format-I.

Costs

Summary

Improvement Of Of Tentulikhunti-mangardora Road Under Mmsy-improvement Of Existing Rd Road In The Districts Of Nabarangpur For The Year 2024-25.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoRTH specifications for Road & Bridge works (4th revision) but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge..

17866.95

200

3589112.92

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).

5210.3

50

262286.5

... More
Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge.

4178.16

74

312192.12

... More
Fine dressing and turfing including transportation by mechanical means with all leads and lifts and placing of turfs in position and ramming with thapies including watering and cost of labour and all materials but excluding the charges of GST etc. complete as per the direction of the Engineer-in-Charge.

23068.47

28

660911.67

... More
Construction of granular Sub base by providing close grade granular sub-base grading-III material as per table-100-1. spreading in uniform layers with motor grader om prepared surface,mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H specifications for road and Bridges work.

2841.15

1675

4760176.36

... More
Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision)

4786.23

2241

10728286.68

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means and including cost conveyance & royality of all materials & cost of all labour & T&P required for the work hire charges of machinaries etc complete but excluding the charges of GST as per Technical specification clause 502 of MORD for low porosity surface but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.

27904.14

40

1130954.79

... More
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH specification for road & bridge works (4th revision) etc complete but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.

27904.14

14

410469.9

... More
Providin & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over previously prepared surface with hydrostatic paver finisher with sensore control to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 504 of MoSRT&H Specifications for road and bridge works (4th Revision) Page-169 Item -45

1395.21

8335

11629326.49

... More
Providing & laying Semi Dense Bituminous Concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen ,transporting the hot mix to work site ,laying with a hydrostatic paver finisher to the required grade,level & allignment and rolling with smooth wheeled ,vibratory and tandem roller to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (Latest Revision) but excluding the charges of GST etc complete including cost conveyance etc required as per specification & direction of Engineer-in-Charge.

697.61

10254

7153397.58

... More
Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge.

1538.4

270

416737.18

... More
Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.

243.12

699

170006.52

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 of MoRD but excluding the charges of GST & as per direction of the Engineer-in-Charge.

-

-

-

... More
1000mm dia Double row

10

6162

61627.9

... More
1200 mm dia Double Row

35

7961

278640.6

... More
Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1200 of MoRD and as per direction of the Engineer-in-Charge.

404.99

8784

3557584.74

... More
PCC M-15 grade in foundation bed using 40mm to 10 mm size crushed stone aggregates mixed by concrete mixer laying in layers and compacting by vibrator & all leads and lifts as per approved drawing & technical specification and as per section 1700& 2100 of MORTH specification for road and bridge works (latest revision) but excluding the charges of GST including cost conveyance etc required as directed by Engineer-in-charge.

-

-

-

... More
Foundation

407.9

6714

2738730.34

... More
Sub-Structure

879.55

6817

5996208.99

... More
R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.

-

-

-

... More
Foundation

144.95

8599

1246439.55

... More
Substructure

73.35

10587

776600.46

... More
Superstructure

178.81

11464

2050011.95

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

41

2402

98499.63

... More
R.C.C M-30 grade in wearing course using 20mm and down grade BHGCB chips of approved quality from approved quarry including hoisting lowering and laying in position in layers with proper packing and ramming by means of vibrator to proper slope and level including watering and curring with cost conveyance royality of all materials required for the work including all labour,T&P for the work etc complete but excluding the charges of GST in all respect as per the specification and direction of Engineer-in-charge.

26.93

8633

232498.81

... More
Providing and laying Filter media with granular crushed aggreates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wingwall return wall to the full height compared to firm condition complete as per drawing and technical specificationn clause 1204.3.8 including cost conveyance but excluding the charges of GST etc required as directed by Engineer-in-charge.

102.04

2243

228876.74

... More
Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level but excluding the charges of GST as per direction of the Engineer-in-charge including dewatering if required.

82.33

1848

152179.6

... More
Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 of MORD specification for Rural roads but excluding the charges of GST and as per direction of Engineer-in- charge.

335

111

37332.4

... More
Reinforced cement concrete M15 grade Kilometer stone/ local stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD but excluding the charges of GST and as per direction of Engineer-in-Charge.

-

-

-

... More
Fixing of 5th. Km. Stone

1

4458

4458.5

... More
Fixing of Km. Stone

4

2660

10643.2

... More
200 mm Stone (Precast)

20

746

14939.4

... More
Guide Post (M-20)

100

705

70532

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform.but excluding the charges of GST etc complete as per the direction of Engineer-in-Charge.

1160.6

352

408972.23

... More
Supplying, fitting, fixing of roads sign board as per approve drawing including cost, conveyance, royality, taxes of all materials, labour, T & P etc. providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC: 67-2010 made of A.C.P. (Aluminium composite panel) used for sign boards with a thermoplastic core of low density polyethylene (LDPE) between two thick sheets of aluminium with over all thickness of 4mm and aluminum thickness of 0.5mm on both sides as per requirement in table 6.1 of IRC-67/2010 and as per technical specifically of clause 801.3 supported on a mild steel angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 40cm x 40cm x 60cm. 60cm below ground level as per approved drawing including excavation, curring but excluding the charges of GST etc. complete as per MoRD Technical Specification Clause 1701 and as per direction of Engineer-in-charge.

-

-

-

... More
Information signs

2

12029

24059.56

... More
Providing and fixing of typical PMGSY Citizen sign board with logo as per MORD specifications and drawing. Two MS plates of 2mm thick, top & middle plate duly welded with MS flat iron 25mmx5mm size on back on edges. The flat iron frame of both plate will be welded to 2nos 75mmx75mm of 12SWG sheet tubes posts duly embeded in C.C. M-15 grade blocks of 600mmx600mmx750mm, 750mm below ground level. The top most dimond plate will be welded to middle plate by 47mmx47mm of 12SWG steel tube. All M.S. will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quailty in required shade & colour. All sections of framed posts & steel tubes will be painted with primer & two coats of paint as per drawing clause 1701 and Annexure 1700.1

2

8998

17996

... More
Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 etc complete including cost conveyance etc required as per specification but excluding the charges of GST & direction of Engineer-in-Charge.

-

-

-

... More
600mm equilateral triangle

15

2278

34178.55

... More
600mm Circular

15

2112

31684.35

... More
Maintenance Works

-

-

-

... More
Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge

-

-

-

... More
1st year

31.5

390

12296.03

... More
2nd year

41.9

390

16355.67

... More
3rd year

52.61

390

20536.31

... More
4th year

63

390

24592.05

... More
5th year

73.4

390

28651.69

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.

-

-

-

... More
1st year

105

44

4663.05

... More
2nd year

139.65

44

6201.86

... More
3rd year

175.35

44

7787.29

... More
4th year

210

44

9326.1

... More
5th year

244.65

44

10864.91

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.

-

-

-

... More
1st year

105

18

1926.75

... More
2nd year

139.65

18

2562.58

... More
3rd year

175.35

18

3217.67

... More
4th year

210

18

3853.5

... More
5th year

244.65

18

4489.33

... More
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge.

-

-

-

... More
1st year

1042

313

326229.36

... More
2nd year

1427.54

313

446934.22

... More
3rd year

1792.24

313

561114.5

... More
4th year

2156.94

313

675294.78

... More
5th year

2532.06

313

792737.35

... More
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge.

-

-

-

... More
1st year

8

1713

13705.68

... More
2nd year

8

1713

13705.68

... More
3rd year

8

1713

13705.68

... More
4th year

8

1713

13705.68

... More
5th year

8

1713

13705.68

... More
Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

5

873

4369.8

... More
2nd year

5

873

4369.8

... More
3rd year

5

873

4369.8

... More
4th year

5

873

4369.8

... More
5th year

5

873

4369.8

... More
Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

50

176

8805.5

... More
2nd year

67

176

11799.37

... More
3rd year

84

176

14793.24

... More
4th year

100

176

17611

... More
5th year

117

176

20604.87

... More
Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year

200

10

2194

... More
2nd year

266

10

2918.02

... More
3rd year

334

10

3663.98

... More
4th year

400

10

4388

... More
5th year

466

10

5112.02

... More
Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge

-

-

-

... More
1st year

105

3

384.3

... More
2nd year

139.65

3

511.12

... More
3rd year

175.35

3

641.78

... More
4th year

210

3

768.6

... More
5th year

244.65

3

895.42



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.