Pradhan Mantri Gram Sadak Yojana Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,58,159Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Or25nbcc190
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CERWI_118663_3Bid Award Id
ViewTender No
NBCC-ODISHA-PMGSY-2022-23-01Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Grading No.-II
270
-
2366.24
Grading No.-III
270
-
2451.97
BITUMINOUS WORKS
-
-
-
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 of MoRD for low porosity surface. and as per direction of Engineer-In-Charge.
4200
-
43.61
Surface Dressing (1st Coat) (Cold Mix) Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregate of specified size and rolling with three wheel 80-100 kn static roller including cleaning the road surface as per Technical Specification Clause 507.
4200
-
90.45
Surface Dressing (2nd Coat) (Cold Mix) Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregate of specified size and rolling with three wheel 80-100 kn static roller including cleaning the road surface as per Technical Specification Clause 507.
4200
-
70.37
CROSS DRAINAGE STRUCTURES
-
-
-
Earth work in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring & bracing removal of stumps and other deleterious material and disposal up to a lead of 50mtr, dressing of sides and bottm and back filling in trenches with excavated suitable material.and as per direction of the Engineer in charge.
256.09
-
194.02
Providing Concrete for Plain/ reinforced concrete in open foundation (1:3:6) complete as per drawing and technical specifications Clauses 802,803,1202 & 1203
6.33
-
4907.03
Providing & laying Plain Cement Concrete M-15 Nominal Mix (1:2.5:5)in open foundation as per drawings & Technical Specification clauses 802,803,1202 & 1203 of MORD and as per direction of Engineer-In-Charge.
20.79
-
4810.96
Providing & laying Plain Cement Concrete M-15 Nominal Mix (1:2.5:5) in substructure as per drawings & Technical Specification clauses 802,804, 805,806, 807,1202 & 1204 of MORD and as per direction of Engineer-In-Charge.
221.52
-
5083.16
RCC M-25 using 20mm down graded chips including laying in position and compacting by using vibrator including shuttering, cost,conveyacne T&P articles as per specification and direction of the E.I.C.
-
-
-
(RCC M-25 for Substructure)
2.25
-
6881.78
(RCC M-25 for Superstructure)
2.65
-
7457.8
Supplying, fitting and placing HYSD bar reinforcement (Fe415) complete as per drawings and technical specifications Clauses 1002,1005,1010 and 1202 and as per direction of Engineer-in-Charge.
-
-
-
In Sub-structure
0.13
-
49010.19
In Super Structure
0.33
-
49867.38
Providing and laying reinforced cement concrete pipe NP3 for culverts on cement concrete bedding including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 as per direction of the Engineer in charge.
-
-
-
1000 mm dia HPC (Single row)
67.5
-
6226.42
PROTECTION WORKS
-
-
-
Earth work in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring & bracing removal of stumps and other deleterious material and disposal up to a lead of 50mtr, dressing of sides and bottm and back filling in trenches with excavated suitable material and as per direction of Engineer-In-Charge.
10.47
-
194.02
Providing & laying Plain Cement Concrete M-15 Nominal Mix (1:2.5:5) in open foundation as per drawings & Technical Specification clauses 802,803,1202 & 1203 of MORD and as per direction of Engineer-In-Charge.
2.99
-
4810.96
Providing & laying Plain Cement Concrete M-15 Nominal Mix (1:2.5:5) in Substructure as per drawings & Technical Specification clauses 802,804, 805,806, 807 ,1202 & 1204 of MORD and as per direction of Engineer-In-Charge.
8.97
-
5083.16
ROAD APPURTENANCES
-
-
-
Supplying and installing of measurement stones including painting, lettering in accordance with the specifications and as approved by the engineer and as per direction of Engineer-In-Charge and as per clause 1700 of MoRD.
-
-
-
i) 5th kilometer stone
2
-
3019.19
ii) Ordinary kilometer stone
9
-
1871.47
iii) 200 mtr Stone
10
-
483.38
Providing logo board [iron] at every 2nd km including cost conveyance, taxes of all materials required including painting, figuring, and fixing at site as per approved drawing and specification and as per direction of Engineering in charge.
5
-
1383.36
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing as per Clause 1700/300/800 of MoRD and as per direction of Engineer-In-charge
4
-
1621.03
Construction of RCC guard posts of 250 mm dia M15 grade cast-in-situ with 20mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 and as per direction of Engineer-in-charge.
20
-
535.98
Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 of MoRD and as per direction of Engineer-In-Charge.
2
-
1982.56
Part-II-Maintanance
-
-
-
Routine Maintenance for 1st Year after completion of construction works
10.14
-
48519.37
Routine Maintenance for 2nd Year after completion of construction works
10.14
-
57622.93
Routine Maintenance for 3rd Year after completion of construction works
10.14
-
81712.68
Routine Maintenance for 4th Year after completion of construction works
10.14
-
86797.7
Routine Maintenance for 5th Year after completion of construction works
10.14
-
94642.14
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements