Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Healthcare and Medicine
Machinery and Tools
Eprocure
Opening Date18 Jul 2022
Closing Date3 Aug 2022
Tender Amount₹ 3,02,68,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road-C

11640

-

1.98

... More
Road-D

6000

-

1.98

... More
Road-E

6000

-

1.98

... More
Road-F

3000

-

1.98

... More
Road-G

3000

-

1.98

... More
Road-H

1500

-

1.98

... More
Scarifing the existing bituminious road surface to a depth of 50mm and disposal of scarifing material with all lifts and lead upto 1000mtr etc complete as per direction of EIC.

-

-

-

... More
Road-A

1300

-

3.4

... More
Providing, laying, spreading and compacting stone aggregate specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber the voids with small stones and hand packing the same to proper camber, applying and brooming requsite type of screening / binding materials filling up interstices of coarse agreegate, watering and compacting to the required density as per clause 404 of MoSRT&H specification for road and bridge work etc all complete including cost, conveyance, royalty and taxes of all materials with all labour and T & P etc complete.

-

-

-

... More
Road-A

134.59

-

1829.15

... More
Road-B

84.49

-

2019.54

... More
Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder of 60/70 penetration grade of bitumen laid onprepared surface and rolling with 8-10 tonne smooth wheeled steel roller as per Clause 510 of MoSRT&H Specifications for Road & Bridge works (4th Revision)

-

-

-

... More
Road-A

890.63

-

92.89

... More
Road-B

2253

-

94.17

... More
Road-C

1455

-

93.5

... More
Road-D

900

-

93.72

... More
Road-E

948.75

-

94.93

... More
Road-F

515.63

-

93.81

... More
Road-G

472.5

-

93.81

... More
Providing & applying primer coat with Bitumen emulsion on prepaired sueface of granular base including cleaning the road surface and spraying primer @ 0.60kg / sqm using mechanical means as per clause 502 of MoSRT & H specification for road & bridge works etc complete as per direction of EIC.

-

-

-

... More
Road-A

1834.4

-

37.09

... More
Road-B

1126.53

-

37.11

... More
Providing & applying tack coat with Bitumen emulsion using emulsion pressere distributer @0.20kg / sqm on the prepared bituminous / granular suerface cleaned with mechanical broom as per clause 503 of MoSRT & H specification for road & bridge works

-

-

-

... More
Road-A

21562.5

-

11.83

... More
Road-B

22530

-

11.84

... More
Road-C

14550

-

8.71

... More
Road-D

7500

-

11.84

... More
Road-E

9487.5

-

11.81

... More
Road-F

10312.5

-

11.82

... More
Road-G

3937.5

-

11.82

... More
Road-H

3150

-

11.81

... More
Providing , laying semi dence bituminious concrete with batch type hot mix plant using crushed aggregates of specified grading, primixed with bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with hydrostaic paver finisher with sensor control to the required grade, level on the alignment, rolling with smooth wheeled, vibratory and tandem roller to the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works etc.complete as per direction of EIC.

-

-

-

... More
Road-A

539.06

-

10775.06

... More
Road-B

563.25

-

10871.03

... More
Road-C

363.75

-

10843.48

... More
Road-D

187.5

-

10862.67

... More
Road-E

237.19

-

11022.62

... More
Road-F

257.81

-

10894.66

... More
Road-G

98.44

-

10862.67

... More
Road-H

78.75

-

10939.45

... More
Construction of enbankment with approved material obtained from borrow pit with lead and lift transporting to site by mechanical means within lead of 5kms, spreading grading to required slope and compacting to meet requirement of table 300-2 and clause 305 of MoSRT&H specification for road and bridge works etc complete as per direction of EIC.

-

-

-

... More
Road-A

600

-

129.05

... More
Road-B

1384

-

129.05

... More
Road-C

400

-

129.05

... More
Road-D

400

-

129.05

... More
Road-E

417

-

129.05

... More
Road-F

526

-

129.05

... More
Road-G

143

-

129.05

... More
Road-H

100

-

129.05

... More
Earth work excavation in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and levelling the bed etc all complete as per the direction of the Engineer-in-charge.

-

-

-

... More
Road-B

183.6

-

195.38

... More
Road-C

13.5

-

195.38

... More
Road-F

10.8

-

195.38

... More
Filling F&P with sand including cost, conveyace, royalty & taxes of all materials etc. complete.

-

-

-

... More
Road-B

24.48

-

504.93

... More
Road-C

1.8

-

462.27

... More
Road-F

1.44

-

398.27

... More
C.C(1:3:6) using 40 mm HG Crusher Broken Metal in luding cost conveyance taxes etc. complete including watering, curing with all labour and T&P required for the work etc. complete.

-

-

-

... More
Road-B

-

-

-

... More
In Foundation

24.48

-

4583.49

... More
In Sub-structure

275.4

-

4686.63

... More
Road-C

-

-

-

... More
In Foundation

1.8

-

4493.39

... More
In Sub-structure

20.25

-

4596.53

... More
Road-F

-

-

-

... More
In Foundation

1.44

-

4480.98

... More
In Sub-structure

16.2

-

4584.12

... More
Providing Weep Holes is Brick Masonry/Paln/Rainforced concrete abutment, wing wall / return wall with 100mm dia AC pipe, extending through the full width of the structure wirh slope of IV:20H towards drawing force etc, complete.

-

-

-

... More
Road-B

272

-

24.85

... More
Road-C

20

-

24.85

... More
Road-F

16

-

24.85

... More
Finishing Wall with Water Proofing Cement paint Two coat over a coat of cement wash of approved shade on new work including all cost of cement paint etc, Complete.

-

-

-

... More
Road-A

248.8

-

33.43

... More
Road-B

267.8

-

33.43

... More
Road-C

212.8

-

33.43

... More
Road-D

106.8

-

33.43

... More
Road-E

106.8

-

33.43

... More
Road-F

106.8

-

33.43

... More
Road-G

94.2

-

33.43

... More
Providing, fitting, fixing & writting of Km stone, 200mtr stone & cautinary sign board etc all complete as per direction of EIC.

-

-

-

... More
Road-A

-

-

-

... More
5TH KM Stone

1

-

3420.75

... More
KM Stone

5

-

2078.17

... More
Guard Stone

22

-

623.61

... More
Information sign board

1

-

11595.84

... More
Road-B

-

-

-

... More
5TH KM Stone

1

-

3420.75

... More
KM Stone

7

-

2121.86

... More
200 mtr Stone

32

-

586.72

... More
Guard Stone

60

-

623.61

... More
Cautionary sign board

6

-

4004.27

... More
Information sign board

1

-

11610.6

... More
Asset board

1

-

26819.96

... More
Road-C

-

-

-

... More
KM Stone

4

-

2093.55

... More
200 mtr Stone

16

-

581.57

... More
Guard Stone

22

-

623.61

... More
Cautionary sign board

7

-

3992.15

... More
Information sign board

1

-

11598.48

... More
Road-D

-

-

-

... More
KM Stone

2

-

2105.95

... More
200 mtr Stone

8

-

583.85

... More
Guard Stone

6

-

623.61

... More
Information sign board

1

-

11604.03

... More
Road-E

-

-

-

... More
KM Stone

3

-

2124.12

... More
200 mtr Stone

12

-

586.79

... More
Information sign board

1

-

11609.12

... More
Road-F

-

-

-

... More
KM Stone

3

-

2089.43

... More
200 mtr Stone

10

-

580.62

... More
Information sign board

1

-

11595.4

... More
Road-G

-

-

-

... More
KM Stone

2

-

2089.43

... More
200 mtr Stone

8

-

580.62

... More
Information sign board

1

-

11595.4

... More
Road-H

-

-

-

... More
KM Stone

2

-

2121.45

... More
200 mtr Stone

2

-

586.32

... More
Cautionary sign board

2

-

4001.74

... More
Information sign board

1

-

11608.07

... More
Asset board

1

-

26819.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.