Paradip Port Trust Tender
... More
The Paradip Port Trust has issued a formal invitation for competitive bids for Construction Of 4-lane Road From L And T Junction At Fishery Harbour Road To Gate No.1 in Kendrapara, Odisha, with an estimated contract value of Rs. 4,75,72,335. The bid opening date for this tender is 10-10-2019 and the last date for bid submission is 01-11-2019. Interested bidders for Paradip Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Paradip Port Trust Tender
Eprocure
Opening Date10 Oct 2019
Closing Date1 Nov 2019
Tender Amount₹ 4,75,72,335
Costs
EMD
₹ 9,51,447Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MoS_510076_1Bid Award Id
ViewTender No
CE/PRD/ACCTS-03/19/401Tender Authority
Paradip Port Trust ViewPurchaser Address
-Website
http://https://paradipport.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Preparation of base for embankment in water logged areas by removing of loose slushy soil upto 1m. depth as required and disposing the slushy soil upto a distance of 500m with supply of all labours, T&P, machineries, operators, helpers, POL, lubricants, all taxes, port entry fees etc. all complete excluding GST as directed by the Engineer-in-charge.
14375
-
-
... More
Earthwork excavation in foundations/ road embankment in all kind of soils inclusive of all lead, lift, descent, dressing to dimensions and disposal of surplus earth at a designated location by loading at one end and unloading at other end with supply of all labours, T&P, machineries, operators, helpers, POL, lubricants, all taxes, port entry fees etc. all complete excluding GST as directed by the Engineer-in-Charge.
8620
-
-
... More
Supplying, transporting, collecting and laying of approved quality inter locking precast Cement Concrete factory made / plant made Paver Blocks of M-50 grade, 100mm thick of required shape, size, design, conveying the same by private trucks with all leads including loading at one end and unloading at other end, on the proposed road over 50mm (Avg.) thick compacted bed of sand, compacting and proper embedding / laying of inter locking paver blocks over the sand bedding layer by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand including cost of paver blocks, all materials, labour, taxes, T&P, port entry fees, operator, hire and running charges of equipment / machineries, curing, cost of sand bedding, water, fuel, lubricant, all testing charges etc. all complete excluding GST as directed by Engineer-In-Charge. N.B.:(i) No damaged paver blocks shall be paid. (ii) Payment shall be released after achievement of designed strength in the Laboratory as per relevant IS Code.
12675
-
-
... More
Cleaning of shrub jungles including cutting, uprooting of small bushes, removal of unsuitable materials like wood pieces, concrete blocks etc. from the ROW and disposing the same at the designated place with lead of 500mtr and initial lift with supply of all labours, T&P, machineries, operators, helpers, POL, lubricants, all taxes, port entry fees etc. all complete excluding GST as directed by the Engineer-in-Charge.
750
-
-
... More
Collecting, Conveying, Supplying and Spreading, IRC Grade-II metal of approved quality and filling the interstices with required quarry dust as per MoRTH specification, laying over the compacted Gr-I surface to required slope, compacting by Vibratory Road Roller including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, Port entry fees, all testing charges etc. all complete excluding GST and as directed by the Engineer-in-Charge. N.B.: The spreading layers should be maintained as per MORTH specification.
3170
-
-
... More
For Foundation and Plinth
135
-
-
... More
For RCC
6050
-
-
... More
RCC (M-20) of approved quality for RCC culvert and drain work including mixing, hoisting and laying the concrete in position, finished smooth to the exposed surface, consolidating with vibrator where found necessary, curing, etc. all complete excluding cost of centering and shuttering and steel with supply of all materials, labour, T&P, taxes, tollage, royalties, all testing charges, transportation, water charges, port entry fees etc. complete, excluding GST in all respect as directed by Engineer-in-charge.
1020
-
-
... More
Back filling in foundation trenches by using the excavated material by the side of drain & culvert as per requirement within initial lead and lift, leveling, dressing, watering, compacting by any approved means with cost of all labour, T&P, transportation, hire and running charges of all equipment / machineries, POL, all taxes, port entry fees etc all complete excluding GST as directed by Engineer-in-Charge.
1300
-
-
... More
PCC (1:4:8) ( 1 cement: 4 coarse sand: 8 graded stone metal of 40mm nominal size crusher broken of approved quality) in foundation etc. including mixing, hoisting and laying the concrete in layers in position, consolidating, curing with supply of all materials, labour, T&P, taxes, tollage, water charges, transportation, royalties, port entry fees etc. all complete, excluding GST as directed by Engineer-in-charge.
121
-
-
... More
Supplying, cutting, straightening, bending, binding and placing in position the reinforcement bars of Fe500 confirming to I.S. specifications of SAIL/TISCON/RINL or of any approved make with supply of binding wire of 18 to 20mm. gauge with supply of all labour, materials, T&P, taxes, tollage, port entry fees, all testing charges, etc. all complete excluding GST as directed by Engineer-in-charge. NB: (i) No wastage shall be paid. (ii) Steel coefficient shall be considered as per IS 1786 for payment purpose with bar bending schedule.
1030
-
-
... More
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the surface in layers including watering, ramming, consolidating, compacting by smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton static weight to the satisfaction of Engineer with supply of all labour, T&P, royalties, taxes, hire and running charges of all equipment, port entry fees, operators expenses, cost of water, fuel, etc all complete excluding GST as directed by the Engineer in charge.
1900
-
-
... More
Filling of Road embankment to the required level with sea sand within a lead of 8km (avg.) by private trucks. The rate shall include excavation from within Port area including loading & unloading, placing, spreading, watering, compacting in layers not exceeding 300mm thick by Vibratory Road roller of minimum 8 to 10 Ton static weight for both dry and wet rolling, trimming and dressing to shape as per drawing including setting out work and survey, with all lead, lift, all testing charges, engagements and machineries, operation charges, POL, lubricants, port entry fees etc all complete excluding GST as directed by the Engineer-in-Charge.
N.B.: 10% voids will be deducted from the measured quantity.
34577
-
-
... More
Collecting, Conveying, Supplying and Spreading, IRC Grade-I metal of approved quality over the prepared sub-base in suitable layers, filling the interstices with required quarry dust as per MoRTH specification, maintaining required slope and level, compacting by smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton static weight for both Dry and Wet rolling to the satisfaction of Engineer including supply of all materials, labour, T&P, transportation, charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, port entry fees, all testing charges etc. all complete excluding GST as directed by the Engineer-in-Charge. N.B.: The spreading layers should be maintained as per MORTH specification.
3170
-
-
... More
Supplying of sweet earth, loading at one end and unloading at road site, spreading the same in shoulder and side slope of the road, dressing, leveling in proper slope as per drawing, breaking the clods to minimum 5cm to 7cm size, removing the roots plants, rolling, compacting by any approved means with supply of all materials, labours, T&P, taxes, tollage, royalties, port entry fees, all testing charges, hire and running charges of machineries, operation charges, etc all complete excluding GST as directed by Engineer-in-Charge.
N.B.: 20% voids will be deducted from the measured quantity.
2330
-
-
... More
Shoring and shuttering for foundation work for preventing the collapse in horizontal / vertical / angled way with supply of all materials, labour, T&P, transportation, staging, taxes, port entry fees etc. all complete excluding GST as directed by Engineer in charge.
110
-
-
... More
Providing rigid, smooth, leak proof good quality centering & shuttering with formworks made out of new ply / Steel shutters, providing openings on walls as per requirement, maintaining proper alignment etc. in both horizontal and vertical plane, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, all transportation charges, staging, scaffolding, royalties, all taxes, port entry fees etc all complete excluding GST as directed by the Engineer in charge.
-
-
-
... More
For RCC(Wall)
145
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements