Panchayati Raj And Drinking Water Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 19,244Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PRBBP_104896_5Bid Award Id
ViewTender No
01/2024-25/BELPADA BLOCKTender Authority
Panchayati Raj And Drinking Water Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Random Rubble Hard Granite Stone Masonary In Cement Mortar (1;6) In Foundation & Plinth Including Cost.
Conveyance, Loading And Unloading, Royalties And Taxes All Materials And Cost Of All Labours, Sundnes, T & P Required For The Work Complete Including Dewatering If Required As per Instruction Of Engineer-In¬Charge.
19.95
75177
3768.3
... More
Fly ash brick masonay in cemnet mortar of (1.6) with
portland slag cement, watering and curing etc. including cost, conveyance, loading and unloading, royalities and taxes of all materials and cost of all lbaour sundries T& P required for the works etc complete in all respect as directed by the Enginner -in-charge.
36.82
180506
4902.4
... More
Providing , lifting hoisting laying Reinforced cement concrete of M20 grade in column footings , as per approved designs and drawings having a munimum compressive strength ( in work test) 200 Kg./ Square cm in 15cm. Cubes at 28 days after mixing and tests conducted in accordance with I.S. 416 using 12mm to 20 mm size black hard crusher broken granite stone ships of approved quality from approved quarry washed and cleaned (20mm size not to exceeds 25%) to be mixed in concrete mixture including noisting, lowering lying an dcompacting concrete by susing vibrators, watering and curing for 28 days finishing the exposed surface smooth proving grooves or beads wherever necessary including cost conveyance, loading and unloading royalities and taxes of all materials and cost of all labours sunones , T & P required fo rthe work ect complete in all respect excluding cost and conveyance of HYSD/MS steel and binding wires , and labour charges for straightaining, cutting , bending etc of M.S. rods of for steel and binding
31.33
157631
5031.8
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
A) Ground floor (Slab & Chajja etc)
101.06
67801
670.9
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
B) Lintel Band
18.87
9925
526
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
C) Staircase (GF)
3.54
3162
893.3
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
D) Col. Below foundation
10.2
2383
233.7
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
D) Col. & Roof Beam
63.39
64055
1010.5
... More
Cold twisted steel reinforcement for RCC work
including cutting bending straightening and binding with
18swg black annealed wire and placing in posting complete as per the instruction of the Engineer-in-charge
28.2
242135
8587.9
... More
Supplying, fitting & fixing of Vitrified colour printed
series tiles in dadoes, skirting and risers of steps of size 600mmx 600mm of approved make confirming to IS:13755 laid on 12 mm thick cement mortar (1:3) (1 cement: 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge
61.2
68378
1117.3
... More
Supplying, fitting & fixing of Vitrified colour printed
series tiles in dadoes, skirting and risers of steps of size 600mmx 600mm of approved make confirming to IS:13755 laid on 12 mm thick cement mortar (1:3) (1 cement: 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge
11.69
14271
1220.8
... More
Supplying, fitting & fixing of CeramicTiles of minimum 16mm thick and above 0.10 sqm of approved make in floors over 25mm thick bed of cement mortar 1:1 jointed with cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect
22.5
23949
1064.4
... More
Fixing ceramic tiles in walls tread, steps on 25mm
thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tile.(toilet)
24.06
29638
1231.8
... More
12mm thick cement Plaster in CM (1:6) over brick work including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge.
106.78
15771
147.7
... More
16mm thick cement plster (1:6) over Brick work including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge.
290.37
61471
211.7
... More
2.5cm A.S. flooring with C.C. (1:2:4) including punning
using 12mm size c/b black hard granite chips(septic tank)
6.51
1379
212
... More
20mm thick cement Plaster in CM (1:6) over brick work including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge.
27.33
6056
221.6
... More
Providng fitting and fixing of M.S.Door/ window frame with integrated grill shutter as per the following design and specificaiton.
670.75
61038
91
... More
Fitting & fixing of door & window inclusive of all fitting fixures such as handle tower bolt stay, hinges , knob , screws, etc with all materials labour T & P etc.
25.2
1766
70.1
... More
Providing and painting two coats of synthetic enamel paints over a coat of primer to steel work including sand papering, scaffolding , cost of conveyance, taxes of all materials. T & P labour required to complete the work as per design/ drawing & instruction of Architect/ Engineer- in- charge.
55.34
11671
210.9
... More
First Floor
-
-
-
... More
Fly ash brick masonay in cemnet mortar of (1.6) with
portland slag cement, watering and curing etc.
including cost, conveyance, loading and unloading, royalities and taxes of all materials and cost of all lbaour sundries T& P required for the works etc complete in all respect as directed by the Enginner -in-charge. in First Floor
28.57
149375
5228.4
... More
Providing , lifting hoisting laying Reinforced cement concrete of M20 grade in column footings , as per approved designs and drawings having a munimum compressive strength ( in work test) 200 Kg./ Square cm in 15cm. Cubes at 28 days after mixing and tests conducted in accordance with I.S. 416 using 12mm to 20 mm size black hard crusher broken granite stone ships of approved quality from approved quarry washed and cleaned (20mm size not to exceeds 25%) to be mixed in concrete mixture including noisting, lowering lying and compacting concrete by susing vibrators, watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth proving grooves or beads wherever necessary including cost conveyance,loading and unloading royalities and taxes of all materials and cost of all labours sunones , T & P required fo rthe work ect complete in all respect excluding cost and conveyance of HYSD/MS steel and binding wires , and labour charges for straightaining, cutting , bending etc of M.S. rods of for steel and binding
For First Floor
18.32
93855
5123.4
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
A) First floor (Slab & Chajja etc)
84.17
67765
805.1
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
B)First Floor Lintel Band
16.47
10397
631.3
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
C) First floor Staircase (GF)
12.27
13152
1071.9
... More
Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete as per the instruction of the Engineer-in-charge.
D) First Floor -Col. & Roof Beam
63.6
77115
1212.5
... More
Cold twisted steel reinforcement for RCC work
including cutting bending straightening and binding with
18swg black annealed wire and placing in posting complete as per the instruction of the Engineer-in-charge For First floor
18.32
157792
8613.6
... More
Fixing ceramic tiles in walls tread, steps on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tile. For First floor
15.14
16458
1087.3
... More
12mm thick cement Plaster in CM (1:6) over brick work including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge.For First floor
110.94
17040
153.6
... More
16mm thick cement plaster (1:6) over Brick work including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. For First floor
195.84
42497
217
... More
Providng fitting and fixing of M.S.Door/ window frame with integrated grill shutter as per the following design and specificaiton. For First floor
690.38
62824
91
... More
Fitting & fixing of door & window inclusive of all fitting fixures such as handle tower bolt stay, hinges , knob , screws, etc with all materials labour T & P etc. For First floor
17.7
1240
70.1
... More
Providing and painting two coats of synthetic enamel paints over a coat of primer to steel work including sand papering, scaffolding , cost of conveyance, taxes of all materials. T & P labour required to complete the work as per design/ drawing & instruction of Architect/ Engineer- in- charge. For First floor
45.74
9888
216.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements