Panchayati Raj And Drinking Water Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Panchayati Raj And Drinking Water Department Tender

Civil And Construction
Building Construction
Eprocure
Opening Date11 Jan 2023
Closing Date30 Jan 2023
Tender Amount₹ 28,45,268 
Notes
Download

Costs

Summary

Sub Centre Building At Uttarana

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge.

19.68

98356

4997.77

... More
Flyash brick masonry using Flyash bricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in F & P including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc.complete in all respect as per the specification & direction of the Engineer-in-Charge.

24.14

104305

4320.84

... More
Flyash brick masonry using Flyash bricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super structure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

47.84

208287

4353.84

... More
First Floor

37.55

173946

4632.4

... More
2ND Floor

7.1

35164

4952.75

... More
R.C.C. work of M - 20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12mm to 20mm size (1/2” to 3/4”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills etc complete as drawing design and direction of Engineer-in-charge. a) Column base

18.52

99228

5357.9

... More
b) Column & Roof Beam

7.9

89106

11279.27

... More
c) Plinth Bend

5.71

32660

5719.84

... More
d) Lintel

3.32

29667

8936.04

... More
e) Chajja

1.33

16833

12656.56

... More
f) Roof slab

11.77

113087

9608.08

... More
g)Stairs

0.72

7758

10775.28

... More
First Floor a) Lintel

2.34

22864

9771.14

... More
b) Column & Roof Beam

6.29

90613

14405.96

... More
c) Roof slab

11.25

118998

10577.6

... More
d) Chajja

1.2

17082

14235.76

... More
e)Stairs

0.72

8624

11978.23

... More
2ND Floor a) Column & Roof Beam

1.24

20249

16330.63

... More
b) Roof slab

1.33

15609

11736.59

... More
Providing, Cutting, straightening coiled or bent up Fe-500 grade steel (SAIL make) welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods, Fe-500 or equivalent and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod, Fe-500 or equivalent consumed in the work and no separate payment will be made towards weight of binding wires which is to be borne by the contractor at his own cost) as per the direction of Engineer-in-charge. Ground Floor

54.19

458287

8457.05

... More
First Floor

23.98

203395

8481.89

... More
2ND Floor

2.54

21610

8507.97

... More
20mm thick grading plaster in cm (1:4) over roof slab including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.. First Floor

119.72

28282

236.24

... More
12 mm thick C.P in cement mortor (1:6) finished to smooth over brick walls after racking out the joints including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete in all respect as per the specification & direction of the Engineer-in-Charge. GFloor

171.25

24959

145.75

... More
First Floor

115.88

17556

151.51

... More
2ND Floor

29.64

4669

157.55

... More
16 mm thick cement plaster in cm (1:6) over brick masonary finished smooth after racking out joints to 12 mm deep including watering for curing with cost & with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

406.33

84565

208.12

... More
First Floor

295.87

63100

213.27

... More
2ND Floor

29.67

6484

218.56

... More
6 mm thick C.P in cement mortor (1:4) including close deep cheeping to the ceiling of the roof including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.. Gfloor

84.81

13844

163.24

... More
First Floor

63.6

10638

167.27

... More
Supply fitting and fixing vitrified floor tiles in floor 600mmx600mm printed/coloured series trade on steps and landing on 20mm thick bed of cement motar (1:4) joint with neat cement slury mixed with pigment to watched and shade of the tile including rubbing and policing etc complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

95.78

91635

956.73

... More
First Floor

68.57

66305

966.97

... More
Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles, labour etc complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

4.75

3733

786.1

... More
First Floor

4.75

3782

796.34

... More
Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles, labour, royalty etc complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

184.52

142043

769.8

... More
First Floor

21.98

17258

785.2

... More
Supply fitting and fixing Chequred tiles in floors on 12mm thick bed of cement motar (1:3) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and polishing etc as per directin of the Engineer in charge . Ground Floor

7.51

4543

605.02

... More
First Floor

8.8

5414

615.26

... More
Supply fitting and fixing Granite tiles above 0.10 sqm & upto 0.40 sqm in walls, dados & skirting on 12mm thick bed of cement motar (1:3) joint with neat cement slury mixed with pigment to watched and shade of the tile including cost f tile, labour, royalty, rubbing and policing etccomplete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

3.53

5732

1623.84

... More
First Floor

2.27

3709

1634.08

... More
Finishing wall with one coat primer water based of approved make and finished smooth and even surfaceto receiving painting including all labour, T & P, cost of paints complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

472.68

29424

62.25

... More
First Floor In Side

354.67

22620

63.78

... More
First Floor Out Side

115.88

7509

64.8

... More
2ND Floor Out Side

29.64

1999

67.47

... More
2ND Floor in Side

29.67

1938

65.35

... More
Distempering 2coats with distemper of approved shade on new work to give an even shade with cost of all materials taxs labour t&p etc complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

301.43

20569

68.24

... More
First Floor

354.67

24770

69.84

... More
2ND Floor in Side

29.67

2120

71.48

... More
Finishing wall with water proofing weather coat paint of approved shade two coats to give an even shade including cost of paints, labour, conveyance etc complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

171.25

13068

76.31

... More
First Floor

115.88

9161

79.06

... More
2ND Floor

29.64

2429

81.95

... More
Supplying fitting fixing of stainless steel of304 grade in hand railing using 50mmdia 2mmthick circular pipe with Balustrade of size 32mmx32mmx2mm @0.90mtr c/c & stainless steel square pipe bracing of size 32mmx32mmx2mm in 3 rows in staircase as per approved design & specification,buffing,polishing etc with cost, conveyance,taxes of materials,labour,t&p reqd.etc. complete complete in all respect as per the specification & direction of the Engineer-in-Charge.. Ground Floor

7.5

26332

3510.96

... More
First Floor

9

31598

3510.96

... More
Finishing wall surface with Cement based wall putty(water based)of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all material, taxes, cess, labour ,T&P etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.. First Floor

353.02

26847

76.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.