Panchayati Raj And Drinking Water Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Panchayati Raj And Drinking Water Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date5 Sep 2024
Closing DateCancelled
Tender Amount₹ 11,98,525 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.5 cm. Damp proof course with C.C. (1:2:4) using 12mm. Size hard broken granite Chips of approved quality from approved quarry incl. hoisting, compacting curing,finishing the exposed surface smooth, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance, royalty & taxes of all materials,cost of labour and T&p etc. all complete as per the direction of E.I.C.

8.4

3316

394.87

... More
Filling in foundation and plinth with excavated materials including water and ramming as directed by the Engineer-in -charge.

46.36

18373

396.32

... More
R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C.

-

-

-

... More
Column Bases

8.21

47828

5825.64

... More
Plinth band

2.51

14622

5825.64

... More
For beam and column

6.24

36352

5825.64

... More
Lintel

1.26

7340

5825.64

... More
Chajja

0.44

2563

5825.64

... More
Slab

9.66

56275

5825.64

... More
Cutting, straightening, coiled or bent up T. S. rod for R.C.C. work incl. bending, binding & tying the grills and placing in proper position with cost, conveyance,taxes of binding wire 18 to 20 gauge and T.S. rod, cost of all labour & T&P etc complete as per the direction of E.I.C.

25.49

217075

8516.77

... More
Rigid and smooth centering and shuttering of RCC work including false work and

-

-

-

... More
i)Column base, Footings & Plinth band

48.24

11928

247.28

... More
ii)Column & Beams

140.91

167152

1186.24

... More
iii)Lintel Band

13.78

7848

569.56

... More
iv)RCC Slab & Chajja

102.69

77384

753.58

... More
Flyash brick masonry in C.M. (1:6) using brick of size 23cmx11cmx 8cm of crushing strength not less than 75kg/cm2 with dimentional tolerance plus minus 8% after immersing the bricks for six hours befour use incl.lowering, placing in position, watering and curing and cost, conveyance, royalties and taxes of all materials, cost of labour & T&P etc. complete as per the direction of E.I.C.(For foundation & plinth). etc all complete.

-

-

-

... More
(For foundation & plinth)

8.71

47431

5445.61

... More
In superstructure

16.39

89794

5478.61

... More
Supplying, fitting and fixing steel Angle iron door and windows as per approved design and drawing including all cost of materials and labour etc complete as per direction of Engineer in charge.

144

11103

77.11

... More
Supplying and fixing of G.I Pressed G.I Door assembly with polymer powder coated including the cost of all materials and fitings etc. complete.

4.55

31850

7000

... More
Labour for fitting and fixing doors and windows etc.all complete.

7.9

185

23.43

... More
6mm thick cement plaster (1:4),finished smooth to R.C.C. surfaces after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.

95.83

15657

163.39

... More
16mm thick cement plaster (1:6),finished smooth to brick masonry work in inside surface after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.

140.54

37291

265.35

... More
12mm thick cement plaster (1:6) for brick masonry work in outside surface after racking out joints incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.

132.06

22858

173.09

... More
20mm thick grading plaster (1:4),finished smooth over roof slab after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.

75.56

20860

276.08

... More
Fixing Kota tiles in Dados on 12 mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shades of the tiles incl. rubbing and polishing complete incl. cost of tile etc all complete.

8.36

12221

1461.93

... More
Fixing Kota tiles in floor on 25 mm thick cement plaster (1:1) joined with neat cement slurry mixed with pigment to match the shades of the tiles incl. rubbing and polishing complete incl. cost of tile etc all complete.

76.08

73555

966.82

... More
Distempering two coats with approved shade over a coat of oil bound primer incl. cost of all material, labour and T&P etc. complete.

80.83

7304

90.37

... More
Painting two coats with approved paint to doors and windows over a coat of primer incl. cost of all material,T&P and labour etc complete. ( for Iron work )

19.14

3606

188.41

... More
Weather coat painting two coats with approved shade over a coat of oil bound primer incl. cost of all material,T&P and labour etc complete.

160.23

14302

89.26

... More
ELECTRIFICATION WORK Recessed wiring to light point/fan point/Exhaust fan point /cell bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor with switch (V.Guard/L&T/Anchor/Havells)

-

-

-

... More
A)GROUP--A

4

1668

417

... More
B)GROUP--B

6

3852

642

... More
C)GROUP-C

3

2772

924

... More
S/F of 5A switch &socket on existing board

3

252

84

... More
Circuit submain wiring in pvc conduit(finolex/anchor)

-

-

-

... More
2 x1.5 sq.mm +1 x1.5 sq.mm

10

1260

126

... More
2 x2.5 sq.mm +1 x1.5 sq.mm

35

4900

140

... More
2 x 4 sq.mm +1 x1.5 sq.mm

10

1570

157

... More
S/F of BK Angle holder

5

290

58

... More
S/F 48" A.C Ceiling fan (bajaj/usha)

2

3500

1750

... More
supply of 9"exhaust fan (ceiling fan)

2

2574

1287

... More
S/F Of 9 watt LED Bulb (bajaj/orient/crompton)

5

785

157

... More
s/f of 20 watt LED batten fitting

4

2640

660

... More
s/f of 4 way MCB DB single door

1

987

987

... More
S/F of B series SP MCB(HAVELS/HPL/Anchor)

4

568

142

... More
S/F OF 32 Amp DP. MAIN Switch (hpl/anchor)

1

987

987

... More
S/F of standard earthing

1

2431

2431

... More
S/L of no.8 SWG COPPER WIRE

10

580

58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.