Panchayati Raj And Drinking Water Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Panchayati Raj And Drinking Water Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date18 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 23,17,890 
Notes
Download

Costs

Summary

Construction Of Office Building Of Pacs And One 50mt Godown At Arikama Under Bolagarh Block

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fly Ash brick work 25cm x 12cm x 8cm size having crushing strength not less than 75 kg/cm2 with dimensional torerance +- 2 percnet in cemnt mortar (1:6) in foundationn and plinth per cum and as per direction of the Engineer-in-charge. ( In foundation)

27.3

5848

159655.86

... More
Fly Ash brick work 25cm x 12cm x 8cm size having crushing strength not less than 75 kg/cm2 with dimensional tolerance +- 2 percent in cement mortar (1:6) in super structure per cum and as per direction of the Engineer-in-charge. (In SS) (a)Godown ( Upto 3mt ht)

23.21

5881

136511.94

... More
(b)Godown (above 3mt ht)

10.78

6252

67399.79

... More
(c)Office

20.74

5881

121984.38

... More
R.C.C work M-20) using 20mm & down size H.G chips including hoisting, lowering & laying & compacting, watering & curing all materials & labour required for the work etc. Complete but excluding cost of M.S rods Enginneer-in-charge. Ground floor A) Column Base/Footing (i)Godown

11.68

6774

79129.66

... More
(B)Plinth Beam (i)Godown

6.58

7641

50277.78

... More
(C)Column (i)Godown (upto 3mt ht)

3.88

15917

61760.68

... More
(ii)Godown (above 3mt ht)

2.25

17940

40365.45

... More
(iii) Office

1.47

15917

23399.02

... More
(D)Lintel Band (i) Godown

3.29

14387

47335.53

... More
(E)Chajja (i) Godown

7.26

1246

9051.04

... More
F)wall beam (i)Godown (upto 3mt ht)

0.76

15917

12097.45

... More
(ii)Godown (above 3mt ht)

2.43

17940

43594.69

... More
(iii) Office

1.56

15917

24831.61

... More
(G)Roof Slab GODOWN

2.44

13953

34046.3

... More
(ii)Godown (above 3mt ht)

5.78

15583

90070.32

... More
(iii) Office

6.94

13953

96836.6

... More
Providing HYSD including cutting, bending, binding and tying the grills and placing in position including cost, covenyance and royalty of all materials and cost of all labour etc. complete,(a) Ground floor

52.59

8601

452363.4

... More
Providing cement concrete (1:2:4) mix with 12MM nomial size H.B. chips aggregate in foundations including cost and conveyance of all materials to site and all labour charges complete or as per direction of E.I.C.

4.8

7838

37624.8

... More
12 mm thick cement plaster (1:6) including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge.(a) Ground floor (i)Godown (upto 3mt ht)

110.3

194

21398.2

... More
(ii)Godown (above 3mt ht)

55.27

201

11142.43

... More
(iii) Office

103.48

194

20075.12

... More
16 mm thick cement plaster (1:6) including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge.(a) Ground floor (i)Godown (upto 3mt ht)

136.68

278

38010.71

... More
(ii)Godown (above 3mt ht)

52.6

284

14985.74

... More
(iii) Office

131.25

278

36500.63

... More
20mm thick grading plaster with cement mortar (1:4) over roof slab laid to proper slope finished smooth watering and curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect,(a) Ground floor (i)Godown (upto 3mt ht)

20.34

303

6169.12

... More
(ii)Godown (above 3mt ht)

48.14

310

14928.21

... More
(iii) Office

55.51

303

16836.18

... More
6mm thick celling plaster with cement mortar (1:4) over R.C.C surface including all cost and conveyance, royality taxes, of all material etc. complete as directed by E.I.C (i)Godown (upto 3mt ht)

12.31

213

2623.26

... More
(ii)Godown (above 3mt ht)

37.5

218

8193.75

... More
(iii) Office

48.17

213

10265.03

... More
Priming one coat two wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete.(a) Ground floor (i)Godown (upto 3mt ht)

259.3

78

20458.77

... More
(ii)Godown (above 3mt ht)

145.37

80

11760.43

... More
(iii) Office

263.42

78

20783.84

... More
Providing & Fixing & Fixing M.S. Doors & window Including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. (a) )Godown

420.54

88

37104.24

... More
(ii) Office

373.32

88

32938.02

... More
Painting two coats over wood and iron work with approved Enamel paint over a coat of primming, including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C..

54.19

255

13850.96

... More
Distempering two coats over interior wall surface with Distemper of approved shade including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C.. (a) Ground floor (i)Godown (upto 3mt ht)

149

86

12903.4

... More
(ii)Godown (above 3mt ht)

90.1

88

7991.87

... More
(iii) Office

179.42

86

15537.77

... More
Finishing wall surface with two coats of weather coat over a coat of cement priming including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges. (a) Ground Floor (i)Godown (upto 3mt ht)

110.3

95

10555.71

... More
(ii)Godown (above 3mt ht)

55.27

99

5488.31

... More
(iii) Office

103.48

95

9903.04

... More
Fixing Vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of precast tiles.(a)Ground Floor

58.48

1147

67123.34

... More
Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles.( Ceramic Tiles )(a) Ground floor

18.14

1277

23179.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.