Panchayati Raj And Drinking Water Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Panchayati Raj And Drinking Water Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date16 Dec 2022
Closing Date9 Jan 2023
Tender Amount₹ 30,87,974
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Construction Of Day Care Sub Centre Cum Health And Wellness Centre At Baredia
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PRBDI_84601_1Bid Award Id
ViewTender No
1/22-23Tender Authority
Panchayati Raj And Drinking Water Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and layingas per the direction of the EIC.
-
-
-
... More
Column Base
17.8
-
-
... More
Plinth Beam
5.47
-
-
... More
Lintel Ground Floor
3.12
-
-
... More
Lintel First Floor
2.76
-
-
... More
Column & beam Ground Floor
7.04
-
-
... More
Column & beam First Floor
5.16
-
-
... More
Roof Slab Ground Floor
11.32
-
-
... More
Roof Slab First Floor
12.11
-
-
... More
Stair Case Ground Floor
1.35
-
-
... More
Stair Case First Floor
2.01
-
-
... More
Chhaja Ground Floor
1.33
-
-
... More
Chhaja First Floor
1.1
-
-
... More
Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification as per the direction of the EIC.
-
-
-
... More
Ground Floor
51.12
-
-
... More
First Floor
22.6
-
-
... More
Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum.(In foundation)as per the direction of the EIC.
15.33
-
-
... More
Fly Ash brick work with 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum.(In Superstructure)as per the direction of the EIC.
-
-
-
... More
Ground Floor
48.57
-
-
... More
First Floor
31.91
-
-
... More
Second Floor
15.83
-
-
... More
12 mm thick cement plaster in cement mortar (1:6) out side/face brick walls etc complete.as per the direction of the EIC.
-
-
-
... More
Ground Floor
142.18
-
-
... More
First Floor
138.83
-
-
... More
Second Floor
43.22
-
-
... More
16 mm thick cement plaster in CM ( 1: 6) over brick work inside surface of the wall including cost carriage royalty taxes and watering & curring etc. completeas per the direction of the EIC.
-
-
-
... More
Ground Floor
329.1
-
-
... More
First Floor
293.14
-
-
... More
Second Floor
65.82
-
-
... More
12 mm thick cement plaster in cement mortar (1:4) out side/face brick walls etc complete.as per the direction of the EIC.
-
-
-
... More
Ground Floor
5.22
-
-
... More
6 mm thick cement plaster in cement mortar (1:4) over rcc surface out side/face brick walls etc complete.as per the direction of the EIC.
-
-
-
... More
Ground Floor
78.43
-
-
... More
First Floor
60.17
-
-
... More
providing and fixing Aluminium framed glazed louvers with all cost labour T& P etc complete as per direction of EIC
-
-
-
... More
Ground Floor
1.8
-
-
... More
First Floor
0.9
-
-
... More
Supplying, fitting and fixing of M.S. door, window and grill gate ... etc. complete as per direction of Engineer in charge..
-
-
-
... More
Door Window Ground Floor
12.95
-
-
... More
Door Window First Floor
12.3
-
-
... More
Grill Ground Floor
9.72
-
-
... More
Grill First Floor
9.72
-
-
... More
20mm thick Cement plaster in C.M. (1:4) in grading plaster over roof slab including cost of all labour, materials etc. complete in all respect including 1% cess as per direction of Engineer-in-charge.
-
-
-
... More
First Floor
96.94
-
-
... More
Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge
-
-
-
... More
Ground Floor
88.69
-
-
... More
First Floor
71.8
-
-
... More
Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles.as per the direction of the EIC.
-
-
-
... More
Ground Floor
11.23
-
-
... More
First Floor
15.51
-
-
... More
Fixing chequre tiles in floor on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles as per the direction of the EIC.
-
-
-
... More
Ground Floor
12.8
-
-
... More
First Floor
12.8
-
-
... More
Fixing granite tiles in floor on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles
-
-
-
... More
Ground Floor
3.52
-
-
... More
First Floor
2.26
-
-
... More
Cement concrete ( 1 : 2: 4) using 12 mm size HG CB chips incuding laying lowering concrete, wartering and curring & cost carriage royalty and taxes of all materials etc.as per the direction of the EIC.
7.53
-
-
... More
Distempering two coats to walls with distemper of approved shade on new work to give an even shade inculding cost of distemper. as per the direction of the EIC
-
-
-
... More
Ground Floor
402.94
-
-
... More
First Floor
362.98
-
-
... More
Finishing surface of walls with Acrylic putty (water based) of approved make & finished smooth & even surface to receive painting incluidng cost of materials taxes labour etc. as per the direction of the EIC.
-
-
-
... More
Ground Floor
402.94
-
-
... More
First Floor
362.98
-
-
... More
Finishing walls with water proofing cement paint approved shade on new work two coat over a coat of primer to give an even shade including cost of paint.as per the direction of the EIC.
-
-
-
... More
Ground Floor
142.18
-
-
... More
First Floor
182.05
-
-
... More
Finishing walls with water proofing Weather coat of approved shade on new work two coat over a coat of primer to give an even shade including cost of paint. as per the direction of the EIC.
-
-
-
... More
Ground Floor
142.18
-
-
... More
First Floor
182.05
-
-
... More
Supplying ,fitting ,fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32x32x2mm @0.90 mtr. C/C and stainless square pipe bracing of size 32x32x2mm in 3 rows in stair case as per approved design and specification, buffing , polishing etc with cost, conveyance, taxes of alll materials, labour, T&P etc required for the coplete in all respect.as per the direction of the EIC.
-
-
-
... More
Ground Floor
6
-
-
... More
First Floor
6
-
-
... More
Supplying ,fitting ,fixing of aluminium door with OEL anodized aiuminium door section of 9202 as vertical member 9201 as top member and 9200 as bottom and middle member and 12 mm thick prelaminated board fixed on door etc complete
-
-
-
... More
Ground Floor
12.26
-
-
... More
First Floor
13.56
-
-
... More
Painting two coats with good enamel paint over a coat of primer / red oxide on iron works including cost, conveyance & taxes of all materials, T&P, labour charges etc complete as per the direction of the EIC.
-
-
-
... More
Ground Floor
38.95
-
-
... More
First Floor
31.6
-
-
... More
Iron work wrought and put up truss & record racks including all cost conveyance etc completeas per the direction of the EIC.
-
-
-
... More
First Floor
0.95
-
-
... More
Supplying ,fitting,fixing of AC sheet including all cost,conveyance etc complete.as per the direction of the EIC.
-
-
-
... More
First Floor
11.09
-
-