Panchayati Raj And Drinking Water Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 67,500Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Construction Of 1st Floor Of Arts Block Of B.b. Mahavidyalaya, Chandikhole, Barchana Block
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PRBCN_102229_1Bid Award Id
ViewTender No
Tenderonline04 BAD/2023-24/1229/22.02.2024Tender Authority
Panchayati Raj And Drinking Water Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying, having a minimum compressive strength ( in work test) of 150Kg/cm sqm in 15cm. Cubes at 28 days with IS 456 and 516 using 10mm to 20mm. size (20mm. Not to exceed 25%) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying and compacting concrete watering an curing for 4 weeks, (excluding centering,shuttering) and finishing the exposed surfaces smooth with cost,conveyance,royalities and taxes of all materials and labour with T&P required for the work etc.complete in all respect but excluding the cost and conveyance M.S. rods or Tor steel and binding wire of 18 to 20 guage and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or tor steel land binding wire of 18 to 20 guage and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or tor steel and binding wire and tying the grills and placing in proper position.
-
-
-
... More
FIRST FLOOR
133.72
842631
6301.32
... More
SECOND FLOOR
8.01
51331
6407.65
... More
Straightening bend up or coiled rods cutting, bending, cranking, hooking,welding or jointing ( if required) the M.S. rods or tor steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost,conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 guage and labour with all T & P required for the work etc.complete in all lfloors ( weight of binding wires will not be considered for payment and payment will be made on weight of M.S. rods or Tor steel only).
-
-
-
... More
FIRST FLOOR
149.92
1288625
8595.65
... More
SECOND FLOOR
9.73
83916
8622.79
... More
Rigid smooth centering & shutteriing for R.C.C. floor, roof slab, landing, balconies, projecting sun-shades & chaja up to 4.30mtr including cost of required wooden bullahs, & wooden planks, false works & other unforseen items as per direction of Engineer in charges.
-
-
-
... More
FIRST FLOOR
891.76
724366
812.29
... More
SECOND FLOOR
50.04
48779
974.75
... More
Rigid smooth centering & shutteriing for R.C.C. beams, column griders & bressmers including cost of required wooden bullahs, & wooden planks, false works & other unforseen items as per direction of Engineer in charges.
-
-
-
... More
FIRST FLOOR
358.48
439624
1226.36
... More
SECOND FLOOR
30.06
44243
1471.63
... More
Rigid smooth centering & shutteriing for R.C.C. Lintel including cost of required wooden bullahs, & wooden planks, false works & other unforseen items as per direction of Engineer in charges.
-
-
-
... More
FIRST FLOOR
187.55
119136
635.22
... More
Providing and fixing Vitrified Tile 600mmx600mm Plain (Ivory) of premium grade in all floors & treads or steps and landing on 25mm thick bed of cement mortar in proportion (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing with cost,conveyance of all materials, royalty, taxes etc. complete and as per the direction of the Engineer-in-charge.
-
-
-
... More
FIRST FLOOR
430.32
602577
1400.31
... More
Fixing tiles in dados skirting and risers of Steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of tiles.
-
-
-
... More
FIRST FLOOR
258.81
394497
1524.28
... More
12mm. thick cement plaster (1:6) finished smooth to out side brick walls after racking out the joint including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc.complete in all respect in all floors.
-
-
-
... More
FIRST FLOOR
1189.82
193690
162.79
... More
SECOND FLOOR
72.55
12078
166.49
... More
16mm. thick cement plaster (1:6) finished smooth to inside smooth surface of brick walls after racking out the joints including watering and curing with the cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalioties etc.complete in lall floors.
-
-
-
... More
FIRST FLOOR
1189.82
275526
231.57
... More
SECOND FLOOR
72.55
17198
237.08
... More
fitting and fixing of departmental G.I. Gates, steel windows M.S. window grills to windows and opening and collapsible gate with top and bottom rails in proper position including making holes in walls, R.C.C. structure and wood work etc. and making good the damages to walls or R.C.C. structure including mending or cutting to sizes or grooves in walls and fixing with R.C.C. (1:2:4) with hard black crusher lbroken/hand broken granite stone chips of 12mm to 20mm. (20mm not to exceed 25%) with cost and conveyance of all materials, Iron works, labour taxes and royalities with all T&P etc.complete in all floors.
5534.98
422706
76.37
... More
6mm. thick cement plaster (1:4) to R.C.C. surfaces finished smooth including closed deep chipping and slury treatment, cost , conveyance and royality of materials curing etc. complete.
-
-
-
... More
FIRST FLOOR
384.24
68283
177.71
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements