Panchayati Raj And Drinking Water Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Panchayati Raj And Drinking Water Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Sep 2024
Closing DateCancelled
Tender Amount₹ 12,38,102 
Notes
Download

Costs

Summary

Construction Of Additional Class Room Building At Kultapada Govt. Nups

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & laying plain cement concrete 1:4:8 ( 1 cement 4 coarse and 8 graded stone aggregate fo 40 mm nominal size) in foundation and pinth including cost of hoisting, lowering laying concrete, ramming , watering and curing etc. complete to required levels laid in layers not exceeding 15cm thick including cost. Conveyance, loading and unloading, royalties and taxes all materials and cost of all labours, sundnes, T & P required for the work complete including dewatering if required as epr instruciton of Engineer-in- charge.

14.17

82156

5797.91

... More
RCC Providing , lifting hoisting laying Reinforced cement concrete of M20 grade in column footings , as per approved designs and drawings having a munimum compressive strength ( in work test) 200 Kg./ Square cm in 15cm. Cubes at 28 days after mixing and tests conducted in accordance with I.S. 416 using 12mm to 20 mm size black hard crusher broken granite stone ships of approved quality from approved quarry washed and cleaned (20mm size not to exceeds 25%) to be mixed in concrete mixture with ordinary protland cement (OPC) including noisting, lowering lying an dcompacting concrete by susing vibrators, watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth proving grooves or beads wherever necessary including cost conveyance, loading and unloading royalities and taxes of all materials and cost of all labours sunones , T & P required fo rthe work ect complete in all respect excluding cost and conveyance of HYSD/MS steel and binding wires , and labour charges for straightaining, cutting , bending etc of M.S. rods of for steel and binding complete as directed by engineer- in charge.

-

-

-

... More
Column Footing

8.25

48202

5842.73

... More
column upto pinth

0.64

11052

17269.62

... More
Plinth beam

2.77

18262

6593.13

... More
Reinforcement Cold twisted steel reinforcemtn for RCC work including cutting bendingstragntening and binding with 18swg black annealed wire and placing in posting complete.

8.42

78902

9370.89

... More
Fly ash brick masonay in cemnet mortar of (1.6) with portland slag cement, watering and curing etc. including cost, conveyance, loading and unloading, royalities and taxes of all materials and cost of all lbaour sundries T& P required for the works etc complete in all respect as directed by the Enginner -in-charge.

12.44

69923

5620.89

... More
PART-2 GROUND FLOOR Providing, lifting, hoisting laying Reinforced cement concrete of M20grade in column footings s per approved designs and drawings having a minimum compressive strength ( in work test) 200 kg/Square cm. in 15 cm cubes at 28 days afterr mixing and tests conducted in accordance with I.S. 416 using 12 mm to 20 mm size black hard crusher broken grantie stone chips of approved quality from approved quarry washed and cleaned (20 mm size not to exceeds 25%) to be mixed in concrete mixure with ordinary portland cement (OPC) includin ghosting, lowering, lying and compacting concrete by using vibrators, watering andcuring for 28 days centering and shuttering and finishing the xposed surface mooth providing grooves of beads wherever necessary including cost. conveyance, loading and unloading , royaliies and teaxes of all materials and cost of all labours , sundries , T &P, required for the work etc. complete in all respect excluding cost and conveyance of HYSD/Ms steel and binding wires and labour charges for straihtaining, cutting, bending etc. of M.S rods of for steel and binding wires and lying the grils and placing in poper postion.complete as directed by engineer- in charge.

-

-

-

... More
Column

1.96

33848

17269.62

... More
Lintel Band

1.7

22893

13466.47

... More
Roof beam

2.25

38856

17269.62

... More
Chhajja

9.48

10143

1069.94

... More
Roof Slab

9.53

114220

11985.33

... More
Cold twisted steel reinforcement for RCC work including cutting bending straihtening and binding with 18swg black annealed wire and placing in position complete

18.66

174860

9370.89

... More
Fly ash first class brick masonry using CB bricks having crushing strength not less than 75 kg per squr.cm. in cement mortar of (1:6) with portland slag cement after immersing the bricks for 6 (six) hours in water before use in superstructure similar such type of works with all necessary projections, watering and curing etc. including cost, conveyance, loading and unloading, royalitioes and taxes of all materials and cost of all labour, sundries, T & P required for the works etc complete in all respect as directed by the Engineer-in-charge.

18.06

102205

5659.21

... More
12 mm cement plaster 1.6 to out side surface

107.98

20372

188.67

... More
16mm cement plaster 1.6 over brick work to inside walls.

95.93

27904

290.88

... More
6mm thick cement plaster ( 1:4 ) to R.C.C. surfaces finished smooth including close deep chiping and slury treatment. Per 1 sqm.

98.47

20608

209.29

... More
20mm thick cement plaster ( 1:4 ). Per 1 sqm.

74.47

21954

294.81

... More
Finishign walls with Distemper of approved shade on new work 2 coats to give an even shade inclduing cost of brushes and putty inclduing cost of paint( per one Sq. Mtr)(for inside)-Distemper complete as directed by engineer- in charge.

184.56

16678

90.37

... More
Wall painting two coats with 100% acrylic Plastic emulsion paint(1st quality) exterior grade of approved make and shade manufactured by reputed manufacture like nerolac/Asian/Berger/Dulax or equivalent to make an even finished surface over a coat of primer with water bond cement primer in all heights with all scaffolding and stagging charges including cost,conveyance,taxes of all materials,cost of all labour T&P sundries etc, as required for the work. (for out side)complete as directed by engineer- in charge.

132.83

13387

100.79

... More
Fixing Kota Stone in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment o match the shades of the tiles including rubbing and polishing complete excluding cost of precast TILES.complete as directed by engineer- in charge.

68.64

110696

1612.71

... More
Fixing Kota Stone in dados skrting on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tile.

9.66

13613

1409.27

... More
Providng fitting and fixing of M.S.Door/ window frame with integrated grill shutter as per the following design and specificaiton.

541

64292

118.84

... More
Providing and painting two coats of synthetic enamel paints over a coat of primer to steel work including sand papering, scaffolding , cost of conveyance, taxes of all materials. T & P labour required to complete the work as per design/ drawing & instruction of Architect/ Engineer- in- charge.

32.83

6185

188.41

... More
Fixing chequred tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment o match the shades of the tiles including rubbing and polishing complete excluding cost of precast TILES.complete as directed by engineer- in charge.

9.29

9679

1041.89

... More
Provision for Display Board

1

3500

3500

... More
Provision for Black Board (Size- 8' x 4')

1

5500

5500

... More
Provision for Fire Fighting Arrangement

1

6500

6500

... More
Part-3 Electrical Works Recessed wiring to light point/fan point/Exhaust fan point /cell bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor with switch (V.Guard/L&T/Anchor/Havells)

-

-

-

... More
A)GROUP--A

4

1668

417

... More
B)GROUP--B

6

3852

642

... More
C)GROUP-C

3

2772

924

... More
S/F of 5A switch &socket on existing board

3

252

84

... More
Circuit submain wiring in pvc conduit(finolex/anchor)

-

-

-

... More
2 x1.5 sq.mm +1 x1.5 sq.mm

10

1260

126

... More
2 x2.5 sq.mm +1 x1.5 sq.mm

35

4900

140

... More
2 x 4 sq.mm +1 x1.5 sq.mm

10

1570

157

... More
S/F of BK Angle holder

5

290

58

... More
S/F 48" A.C Ceiling fan (bajaj/usha)

2

3500

1750

... More
supply of 9"exhaust fan (ceiling fan)

2

2574

1287

... More
S/F Of 9 watt LED Bulb (bajaj/orient/crompton)

5

785

157

... More
s/f of 20 watt LED batten fitting

4

2640

660

... More
s/f of 4 way MCB DB single door

1

987

987

... More
S/F of B series SP MCB(HAVELS/HPL/Anchor)

4

568

142

... More
S/F OF 32 Amp DP. MAIN Switch (hpl/anchor)

1

987

987

... More
S/F of standard earthing

1

2431

2431

... More
S/L of no.8 SWG COPPER WIRE

10

580

58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.