Orissa State Seeds Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,30,386Document Cost
₹ 11,200Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OSSCL_105626_1Bid Award Id
ViewTender No
OSSC/ Engg-99/ 2024Tender Authority
Orissa State Seeds Corporation Limited ViewPurchaser Address
-Website
http://http://www.osscltd.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
RCC work with M25 Grade concrete with 20mm and down graded crusher broken chips having a minimum crushing strength in work test (150 kg/ sqcm) in 15 cm cubes after 28 days curing after mixing and test conducted in accordance with IS-456 and IS-516 including hoisting, lowering, laying concrete, compacting by using vibrators, centring and shuttering and finishing the exposed surface smooth, providing proves and beads wherever necessary with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
-
-
-
In column footing
38.5
6045
232732.89
In column
45.73
6045
276438.31
In plinth beam
29.17
6045
176332.94
In tie beam
13.46
6045
81365.83
In slant of Gabble wall
2.35
6045
14205.77
Cutting, straightening, coiled or bend up MS rod or Tor steel, bending binding, cranking, hooking, welding or jointing if necessary and tying the grills and placing in position for RCC work in all floors and for proving fan hooks, hoisting lowering, laying for concrete with cost of reinforcement, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (payment will be made on weigh of steel only basing on the coefficient of MS or Tor steel bar approved by competent authority and no separate payment will be made for cost of binding wires)
129.16
8445
1090820.78
Fly Ash Brick masonary in (1.6) cm in foundation and plinth in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (in foundation and plinth)
104.77
5596
586314.92
Fly Ash masonary in (1.6) cm in superstructure in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (in super strucure)
217.17
5629
1222495.54
16mm thick cement plaster (1:6) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
1160.45
219
254242.99
12mm thick cement plaster (1:4) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
1347.96
172
231997.4
Supply of all materials, fabricating MS GRILLS as per direction & Fixing the same in position after cutting of brick work as required fixing the grills with concrete and making the suface good after fixing of MS grills
2217.6
125
277554.82
Supply of all materials for fabrication of MS windows with doube openble leafs made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .
936
125
117149.76
Supply and fixing of MS wiremesh with adequate MS member for fixing and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .
750
125
93870
Cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
2508.41
15
39306.78
Painting wall with two coats of cement paint with approved shade over a coat of cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
1347.96
38
51397.71
Painting of primer coats on new surfaces including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge
1160.45
68
79038.25
Wall painting 2 coats with Weathercoat paint of approved shade on new work to give an even shade including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge
1160.45
81
94530.26
Supplying and on site assembling and erecting trusses of approved design for main godown and cantilever trusses in platform side only. This includes erection of trusses, purlins, BTR and false rafters, sleeves and placing of wind bracing etc with nuts and bolts with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
25
135575
3389391.75
Supply and fixing of Colour Coated Profile sheet 0.50 TCT in roof incuding fixisng of ridges and windties excluding cost wind-ties but including the cost of J hooks with cost, conveyance, taxes & royalties of all material and cost of all labour T&P required for the work etc., complete as directed by Engineer in charge
1370.85
901
1235451.15
Supply and fixing of windties after drilling of holes as required and as directed by engineer in charge including all labour, material for hoisting and tying and completing the work in all respect
7.18
7262
52146.26
Supply of materials and executing the work of laying of wiremesh of sieve size 25*32 mm made out of 1.5 mm galvanised wire before floor concrete, fixing the same to floor rigidly to recieve floor concrete properly including cost of all labour, material for hoisting and tying and completing the work in all respect
775.6
276
214825.69
Supply of all materials for fabrication of Rolling Shutters made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .
29.74
4000
118960
Supply of all material and labour for the work Centring and shuttering for RCC Works and finishing the work in all respect as per direction of engineer-in-charge
-
-
-
Column footing
102.21
235
24071.48
Column
372.98
1012
377459.49
Plinth beam
191.64
235
45133.14
Lintel
58.09
527
30634.34
In slant of Gabble wall
18.59
527
9803.62
Painting of two coats with approved quality eanamel paint (Asian Paints) over iron work including cost of scafolding etc and completing the work in all respect as per direction of engineer in charge
868.77
153
133017.37
CC (1:2:4) in flooring using 12mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
90.5
6836
618663.43
CC (1:2:4) in flooring using 6 mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.
18.39
6282
115530.95
Collection of non grinite stones for filling, size 15 cms minimum and stacking them at site for cinvinience in measureing in uniform sizes, including cost of materials labour etc hoisting and lowering if any and completing the work in all respect as per direction of engineer -in- charge,
100.25
764
76617.07
Collection of morrum for filling, and stacking them at site for cinvinience in measureing in uniform sizes, including cost of materials labour etc hoisting and lowering if any and completing the work in all respect as per direction of engineer -in- charge,
83.83
387
32471.55
Conveying from stacks and laying of morrum subbase and compacting with PRR in cluding watering including cost of material, labour and all other charges and completing the work in all respect as per direction of enginner in charge
83.83
434
36460.18
Conveying from stacks and laying of morrum and stone base and compacting with PRR in cluding watering including cost of material, labour and all other charges and completing the work in all respect as per direction of enginner in charge
114.57
579
66392.17
Supply of all materials abd executing the work of Tarfelting including cost of all material, labour, firewoor, hoisting and lowering of materials and cost of scaffoldings if any and completing the work in all respect as per direction of engineer in charge
111.52
390
43498.38
Dismatling of brick masonary and conveying the stcks to designated place including lead and lift and completing the work in all respect as per direction of engineer in charge
51.65
1287
66491.63
Dismatling of Cemnent Concrete from floor and conveying the stcks to designated place including lead and lift and completing the work in all respect as per direction of engineer in charge
16.8
665
11180.4
Supply of submersible pump set 1 HP for fixing in the existing tubewell and completing the work in all respect as per direction of engineer in charge
1
10423
10423
Supply of starter for submersible pump set 1 HP for fixing in the existing tubewell and completing the work in all respect as per direction of engineer in charge
1
2453
2453
Supply of copper cable submersible motor for fixing in the existing tubewell and completing the work in all respect as per direction of engineer in charge
30
60
1820.1
Supply of all materials apart from pump, starter and copper wire and labour and executing the work of installation of submersible pump set in tube well, trial run of the same and completing the work in all respect as per direction of engineer in charge
1
10000
10000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements