Orissa State Seeds Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Orissa State Seeds Corporation Limited - OSSCL Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date11 Dec 2024
Closing Soon20 Dec 2024
Tender Amount₹ 86,29,771 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC work with M25 Grade concrete with 20mm and down graded crusher broken chips having a minimum crushing strength in work test (150 kg/ sqcm) in 15 cm cubes after 28 days curing after mixing and test conducted in accordance with IS-456 and IS-516 including hoisting, lowering, laying concrete, compacting by using vibrators, centring and shuttering and finishing the exposed surface smooth, providing proves and beads wherever necessary with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

-

-

-

... More
In column footing

27.49

6052

166379.1

... More
In column

26.36

6052

159539.95

... More
In plinth beam

20.18

6052

122136.42

... More
In tie beam

9.49

6052

57436.8

... More
In slant of Gabble wall

1.76

6052

10652.14

... More
Cutting, straightening, coiled or bend up MS rod or Tor steel, bending binding, cranking, hooking, welding or jointing if necessary and tying the grills and placing in position for RCC work in all floors and for proving fan hooks, hoisting lowering, laying for concrete with cost of reinforcement, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (payment will be made on weigh of steel only basing on the coefficient of MS or Tor steel bar approved by competent authority and no separate payment will be made for cost of binding wires)

82.47

8445

696500.39

... More
Fly Ash Brick masonary in (1.6) cm in foundation and plinth in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (in foundation and plinth)

48.83

5544

270734.03

... More
Fly Ash masonary in (1.6) cm in superstructure in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (in super strucure)

150.6

5577

839959.45

... More
16mm thick cement plaster (1:6) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

745.35

219

163887.56

... More
12mm thick cement plaster (1:4) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

823.19

172

141662.77

... More
Supply of all materials, fabricating MS GRILLS as per direction & Fixing the same in position after cutting of brick work as required fixing the grills with concrete and making the suface good after fixing of MS grills

940.7

125

117738.01

... More
Supply of all materials for fabrication of MS windows with doube openble leafs made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .

624

125

78099.84

... More
Supply and fixing of MS wiremesh with adequate MS member for fixing and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .

500

125

62580

... More
Cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

1568.54

15

24579.02

... More
Painting wall with two coats of cement paint with approved shade over a coat of cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

823.19

38

31388.23

... More
Painting of primer coats on new surfaces including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge

745.35

68

50765.79

... More
Wall painting 2 coats with Weathercoat paint of approved shade on new work to give an even shade including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge

745.35

81

60716.21

... More
Supplying and on site assembling and erecting trusses of approved design for main godown and cantilever trusses in platform side only. This includes erection of trusses, purlins, BTR and false rafters, sleeves and placing of wind bracing etc with nuts and bolts with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

17

135575

2304786.39

... More
Supply and fixing of Colour Coated Profile sheet 0.50 TCT in roof incuding fixisng of ridges and windties excluding cost wind-ties but including the cost of J hooks with cost, conveyance, taxes & royalties of all material and cost of all labour T&P required for the work etc., complete as directed by Engineer in charge

853.23

901

768956.47

... More
Supply and fixing of windties after drilling of holes as required and as directed by engineer in charge including all labour, material for hoisting and tying and completing the work in all respect

2.51

7262

18229.4

... More
Supply of materials and executing the work of laying of wiremesh of sieve size 25*32 mm made out of 1.5 mm galvanised wire before floor concrete, fixing the same to floor rigidly to recieve floor concrete properly including cost of all labour, material for hoisting and tying and completing the work in all respect

522.68

279

146339.95

... More
Supply of all materials for fabrication of Rolling Shutters made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .

29.74

4000

118960

... More
Supply of all material and labour for the work Centring and shuttering for RCC Works and finishing the work in all respect as per direction of engineer-in-charge

-

-

-

... More
Column footing

73.24

235

17248.75

... More
Column

261.79

1012

264934.1

... More
Plinth beam

140.68

235

33131.55

... More
Lintel

77.51

527

40875.67

... More
In slant of Gabble wall

18.59

527

9803.62

... More
Painting of two coats with approved quality eanamel paint (Asian Paints) over iron work including cost of scafolding etc and completing the work in all respect as per direction of engineer in charge

471.38

153

72172.99

... More
CC (1:2:4) in flooring using 12mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

63.16

6835

431741.55

... More
CC (1:2:4) in flooring using 6 mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

24.67

6281

154973.98

... More
Collection of non grinite stones for filling, size 15 cms minimum and stacking them at site for cinvinience in measureing in uniform sizes, including cost of materials labour etc hoisting and lowering if any and completing the work in all respect as per direction of engineer -in- charge,

53.47

764

40864.98

... More
Collection of morrum for filling, and stacking them at site for cinvinience in measureing in uniform sizes, including cost of materials labour etc hoisting and lowering if any and completing the work in all respect as per direction of engineer -in- charge,

52.7

390

20561.43

... More
Conveying from stacks and laying of morrum subbase and compacting with PRR in cluding watering including cost of material, labour and all other charges and completing the work in all respect as per direction of enginner in charge

52.7

434

22920.81

... More
Conveying from stacks and laying of morrum and stone base and compacting with PRR in cluding watering including cost of material, labour and all other charges and completing the work in all respect as per direction of enginner in charge

61.1

579

35406.84

... More
Supply of all materials abd executing the work of Tarfelting including cost of all material, labour, firewoor, hoisting and lowering of materials and cost of scaffoldings if any and completing the work in all respect as per direction of engineer in charge

83.64

390

32623.78

... More
Provision of bathroom fittings

-

-

-

... More
Comode with cistrn and fittings

1

5643

5643

... More
Angle Cock

1

859

859

... More
Bath room tap long body

1

1074

1074

... More
Bath room tap short body

1

421

421.06

... More
Wiring with 3/4" pipe

20

75

1500

... More
Wiring with 1/2" pipe

20

55

1100

... More
Wiring with 1" pipe

20

110

2200

... More
Water pipe line PHD fitting installation charges

1

5000

5000

... More
Laying of sewerage line including material and labour

40

250

10000

... More
Construction of Inspection Chamber 2'0"x2'0"x2'0" including all material and labour

2

3000

6000

... More
Construction of soak pit including cost of all material and labour

1

7500

7500

... More
Drilling of Borewell

-

-

-

... More
Charges for conducting VES Test by GWS&I Agency for ascertaining location of water source

1

7200

7200

... More
150 MM DIA Bore Well

18

748

13464

... More
100 MM DIA Bore Well

36

549

19764

... More
Supply of PVC Pipe confirming to IS 12818/92

-

-

-

... More
0 mtr to 20 mtr 150 mm dia pipe

18

1491

26838

... More
21 mts to 80 mts 100 mm dia pipe

36

789

28404

... More
Lowering the PVC housing pipe with cost of all amterial labour and T&P

60

76

4560

... More
Cleaning and developing the tube well cost of all material labour and T&P

1

2500

2500

... More
Supply all material labour and T&P cost of all material labour and T&P

1

2000

2000

... More
Supply of 3 HP 3 Phase 380/440 vots of approved make amd model testing for working in proper order before fitting

1

8937

8937.07

... More
Supply and installation of following materials and completing the work in all respect as per directyion of engineer in charge

-

-

-

... More
Finolex 2.5 mm sq submersible cable

75

60

4500

... More
executing the work of earthing as per IE Rules

1

2025

2025.23

... More
Cable Jointing kit

1

750

750

... More
Engineering rope

160

25

4000

... More
Taper coupling with short piece

2

250

500

... More
Pump holding clamp

2

250

500

... More
Bore cover

1

300

300

... More
Required size HDPE pipe as per Clause No.4 IS 4985-1987

-

-

-

50

100

5000

5

65

325

... More
Installatyion of Full way valve

1

650

650

... More
Installation of over head tank 500 lts PVC

1

2004

2004.24



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.