Orissa Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,93,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
E-procurement Notice No.02/occl/2024-25(on-line)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OCCL_103140_1Tender No
Bid identification No. OCCL-HQP/13/2024-25 (On-line)Tender Authority
Orissa Construction Corporation Limited ViewPurchaser Address
-Website
http://http://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Collecting, supplying and stacking at worksite good quality moorum and sand , for pre-measurement in regular box heaps of 1.50Mx1.50Mx0.44M.to be measured as one cum at a regular intervals and conveying from premeasured stacks admixing sand and moorum and spreading over the approved prepared surface road including cost,conveyance,royality of materials, watering in consolidation with P.R.R.etc. complete with all labour, T&P required for the work with labour welfare cess complete as per specification and direction of the Engineer-in-charge.
838.59
1088741
1298.3
Providing laying spreading and compacting stone aggregates of IRC grade-I metal of size 63mm to 45mm to water bound macadam specification including spreading in uniform thickness hand packing , rolling with 3 wheeled steel roller 8-10 tonne in stage to proper grade and camber applying and brooming to requisite type of screening/binding materials to fill up the interstics of coarse aggregate watering and compacting to required density etc all complete as per direction of the Engineer-in-charge.
1113.75
4474713
4017.7
Providing laying spreading and compacting stone aggregates of IRC grade-III metal of size 53mm to 22.4mm to water bound macadam specification including spreading in uniform thickness hand packing , rolling with 3 wheeled steel roller 8-10 tonne in stage to proper grade and camber applying and brooming to requisite type of screening/binding materials to fill up the interstics of coarse aggregate watering and compacting to required density etc all complete as per direction of the Engineer-in-charge.
1049.8
4300610
4096.6
Providing & applying Primer coat with bitumen emulsion over prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60kg/sqm using mechanical means as per clause 502 of MoSRT & H specifications for road & bridge works including cost, carriage and all other taxes of materials to the site of work etc all complete as per direction of the Engineer in charge.
2859.75
102808
35.95
Providing & applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503 of MoSRT & H specifications for road & bridge works including cost, carriage and all other taxes of materials to the site of work etc all complete as per direction of the Engineer in charge.
2859.75
35746
12.5
Providing & laying 50mm thick bituminous macadam with hot mix plant using crush aggregates of 19mm nom,inal size ( grading -II )premixed with bituminous binder of VG 30 ( 60/70 ) bitumen, transported to site laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level, and allignment and rolling with smooth wheeled, vibratory and tandem roller to achive the desired compaction including cost of all labour, hire and running charge of machineries, T&P, with cost, carriage and royalty of all materials to the site of work etc complete as per direction of the Engineer-in-charge.
142.99
1339458
9367.5
Providing and laying 25mm thick semi dense bituminous concrete over 50mm thick bituminous macadam with batch type hot mix plant using crushed aggregates of 13mm nominal size ( grading- I ), premixed with VG 30 ( 60/70 ) bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision)
71.49
838449
11728.2
Fine dressing and turfing the slopes of embankment with compacted dub grass with 3 extra lead over the initial lead of 50m and 1.50,m initial liftwith cost of labour T& P etc. complete as per diection of the Engineer –in –Charge.
14606.6
442579
30.3
The item rates indicated aove work inclusive of cost of all labour, materials,conveyence,taxes and royality(with EMF,DMF and additional charges) of materials,labour cess,here and running charges of all machineries and equipments and other incidental charges so as to complete the item in all respect as per specification and direction of Engineer-In-Charge.Accordingly the bidder has to quote the rates.The rate are exclusive of GST as applicable.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements