Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Orissa Construction Corporation Limited - OCCL Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date20 Jun 2024
Closing DateCancelled
Tender Amount₹ 1,57,06,74,212 
Notes
Download

Costs

Summary

Construction Of Concrete Dam And Spillway Component Structure

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of foundation in all types of D.I. rocks by mechanical means not requiring blasting to be removed by pickaxes and crowbars in both wet and dry condition including shuttering ,propping bullah,piling,and removal of cofferdam, dewatering if required, rough dressing and depositing the excavated materials with all leads, lifts/delifts in the dumping area with all leads as specified including levelling the same in all heights and rough dressing to the useful materials including hire and running charges of all machineries, mobilisation and demobilisation with all incidental charges, Cess etc.complete in all respect.and as per direction of Engineer-in-charge.

47341.12

4961348

104.8

... More
Excavation in foundation in hard rock of all toughtness and boulders above 0.03 cum in volume within 50 meter initial lead and 1.5 meter initial lift including rough dressing as per specification of the department including stacking useful stones and disposal of rock manually with all lead, lifts, delifts & desposing the debries away from the work site with all leads including hire and running charges of all mechinaries, Mobilisation & demobilisation including construction and removal of cofferdam with all labour, T&P, Cess etc.complete in all respect.and as per specification and direction of Engineer-in-charge (Recovery of useful materials of all size with normally be 0.70 cum/cum of excavation measures in dump condition at sites)

45571.77

24868514

545.7

... More
Excavation of Hard rock with rock breaker(Blasting prohibited) in canal of all toughness in canal and cutoff trench of canal and other deep cutting sections by mechanical means with initial lead, lift and delifts, loading into and transportation by transport vehicle with all leads and depositing the excavated materials neatly in specified dump yard and spreading by Dozer including all incidental charges, T&P, Cess etc. complete as per specifications and as directed by the Engineer-in-charge and trimming of bed and slope to the design finished section by manually, if necessary complete. (Recovery of useful materials of all size with normally be 0.50 cum/cum of excavation measures in dump condition at sites)

5063.53

4698955

928

... More
Preparation of foundation bed of spillway by wedging and barring in hard rock including removal of loose rock by manual/mechanical means including stacking of useful materials in regular stacks by manual/mechanical means with all leads/lifts/delifts including cost of dewatering including all incidental charges, Cess etc. complete as per direction of Engineer-in-charge.

2381.48

5393809

2264.9

... More
Preparation of foundation in hard rock requiring chiselling, hammering, tempering, brushing, air & water jetting by mechanical/manual means including hire and running charges of all equipments and T&P etc. complete for dams and spillway works over rock foundation including stacking of useful materials and disposal of debris if any by manual/mechanical means with cost of dewatering, lighting, all incidental charges, Cess etc. complete as per the direction of Engineer-in-charge.

7938.26

2321226

292.41

... More
Clearance of slush and muck from foundation pit by manual means including removal of debris with all leads and lifts including cost of all labour, cess etc. as directed by the Engineer-in-charge.

23814.78

8216099

345

... More
Excavation in any approved type of soil in approved borrow areas by mechanical means including stripping of borrow area and borrowing earth within 3 Km. lead to the work site as required for the work including cost of construction and maintenance of haul roads and approach roads from the borrow area to work site including watering if required in borrow area loading and transporting the excavated materials by mechanical means and laying on properly prepared and scientifically approved surface having 0.6 m to 0.90 m extra width on both side of the embankment beyond design section of bank of canal in filling reaches and levelling the earth in 22.5 cm layer by mechanical means including rehandiling the soil if required ( to make the fill ready for watering and compaction) to proper shape & size with all leads, lifts, delifts and cost of dewatering if any cost of all materials all taxes on materials including the cost of mobilisation and demobilisation supplying operation maintenance of all machineries equipments and labour required for the work inclusive of supervision charges complete including cost of all labour, materials, royalty, EMF, DMF, additional charges as applicable as per direction of Engineer-in-charge complete in all respect (Payment will be made on finished design section, contractor has to arrange borrow earth at his own cost.)

132909.95

22873802

172.1

... More
Watering earth work up to OMC condition and compaction by sheep foot rollers or vibro roller and dozer or by any other mechanical means in layers not exceeding 22.5 cm to required density to achieve 95% compaction including hire and running charges of all machineries including cost of fuel and lubricants, with cost of mobilisation, demobilisation, cess and all incidental charges to complete the item of work as per direction of the Engineer-in-charge. (measurement to be taken on finished compacted section of the fill under O.M.C. condition)

132909.95

6273349

47.2

... More
Providing and placing in position Plain Cement Concrete (PCC) M-15 grade with crushed granite coarse aggregate (CB ) of size 80mm down grade mixed in batching and mixing plant, transporting mixed concrete by machanical means using Tower Crane / Excavator and with cooling of concrete arrangements including cost of all materials,admixture, labour and machineries, including cost ,carriage, royalty, DMF, EMF, Additional charges as applicable, taxes, cess etc , vibrating, finishing, curing, clearing the site with all leads, lifts and delifts for all materials as per approved drawings and specifications in sub- structure and super structure of the flared out walls etc. of the Dam, Spillway, Head Regulator including cost of construction, maintenance and dismantiling of coffer dam & illuminations, cleaning of slush & muck etc dewatering with all incidental charges complete and as per the direction of Engineer-in-Charge.

46693.67

324318822

6945.67

... More
Reinforced Cement Concrete M-25 grade with 20mm downgraded size hard granite (CB) aggregates free from weathered surfaces ,dust and any other deleterious materials including cost ,carriage, royalty,DMF, EMF, Additional charges as applicable, taxes, cess etc of all materials (except cost of reinforcement MS bar) including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position with cooling of concrete and watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam , curing, illumination, dewatering, cleaning of slush and muck, etc complete as per specification ,drawing etc.complete as per direction of Engineer-in-Charge.

1325.55

9708076

7323.81

... More
Reinforced Cement Concrete M-25 grade with 40mm downgraded size hard granite (CB) aggregates free from weathered surfaces ,dust and any other deleterious materials including cost ,carriage, royalty, DMF, EMF, Additional charges as applicable, taxes, cess of all materials (except cost of reinforcement MS bar)including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position with cooling of concrete and watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam , curing, illumination,dewatering, cleaning of slush and muck, etc complete as per specification ,drawing etc.complete as per direction of Engineer-in-Charge.

63451.02

499226875

7867.91

... More
Reinforced Cement Concrete M-20 grade with 40mm downgraded size hard granite (CB) aggregates free from weathered surfaces ,dust and any other deleterious materials including cost ,carriage, royalty, DMF, EMF, Additional charges as applicable, taxes, cess etc of all materials (except cost of reinforcement MS bar)including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position with cooling of concrete ,watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam , curing, illumination, dewatering, cleaning of slush and muck, etc complete as per specification ,drawing etc.complete as per direction of Engineer-in-Charge.

4918.23

31631006

6431.38

... More
Cement Concrete M-30 grade for RCC works with 20mm downgraded size hard granite (CB) aggts free from weathered surfaces ,dust and any other deleterious materials including rigid and smooth centering & shuttering, cost ,carriage, royalty, DMF, EMF, Additional charges as applicable, taxes, cess etc of all materials (Except cost of reinforcement MS bar) including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position , watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam ,curing,illumination,dewatering, cleaning of slush and muck, etc including cost ,carriage, royalty, taxes etc complete as per specification ,drawing etc.complete as per direction of Engineer-in-Charge .

178.09

1305809

7332.3

... More
R.C.C. work of M-40 grade with 20mm downgraded size hard granite (CB) aggts free from weathered surfaces ,dust and any other deleterious materials including rigid and smooth centering & shuttering, cost ,carriage, royalty, DMF, EMF, Additional charges as applicable, taxes, cess etc of all materials (Except cost of reinforcement MS bar) including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position , watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam ,curing,illumination,dewatering, cleaning of slush and muck, etc including cost ,carriage, royalty, taxes etc complete as per specification ,drawing etc.complete as per direction of Engineer-in-Charge .

5.04

37940

7527.9

... More
Cement Concrete M-50 grade (High performance concrete with Silica Fume) cooling with 20mm downgraded size hard granite (CB) aggts free from weathered surfaces ,dust and any other deleterious materials including cost ,carriage, royalty,20mm downgraded size hard granite (CB) aggts free from weathered surfaces ,dust and any other deleterious materials including rigid and smooth centering & shuttering, cost ,carriage, royalty, DMF, EMF, Additional charges as applicable, taxes, cess etc of all materials (Except cost of reinforcement MS bar) including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position , watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam ,curing,illumination,dewatering, cleaning of slush and muck, etc including cost ,carriage, royalty, taxes etc complete as per specification ,drawing etc.complete as per direction of Engineer-in-Charge . etc of all materials (except cost of reinforcement MS bar) including machine mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto mixing yard ,transportation of mixed concrete with all leads, lifts,delifts by mechanical means for hoisting and placement in position, watering, compaction with vibrator for smooth surface with cost of hire and running charges of all machineries, dewatering if required with construction and removal of cofferdam ,curing,illumination,dewatering, cleaning of slush and muck, etc complete as per specification ,drawing etc. as per direction of Engineer-in-Charge charge.

2625

20797875

7923

... More
Straightening, cutting, bending, binding & tying the grills and placing in position for fabrication, fixing of reinforcement including lapping whenever necessary, supply of binding wire with all leads and lifts from bending yard to placement spot including cost of MS rod/tor rod with all leads lifts and all accessories including mobilisation and demobilisation of men materials and machineries including cost ,carriage, cess, taxes etc of all materials etc, and providing illumination if required, construction of approach road to site including clearance of slush and muck after rainy seasons etc complete as per direction of Engineer-in Charge.

23225.69

255208526

10988.2

... More
Providing contraction joint in spillway by installation of two line 'Z' type copper sealing strips of 1.633mm thickness of approved quality,GI pipes opf 20mm dia and filling with asphalt of approved grade including necessary fabrication work cost ,conveyance and storage and taxes of all materials,all labours, cess and machineries required to complete the work as per specifications and drawings and direction of Engineer-in-charge.

463.22

5746105

12404.7

... More
Rough stone dry packing in aprons , revetments and slope to design thickness using 15 cm. to 30 cm. Size hard broken granite stone of approved quality from approved quarry free from weathered skin and any other deleterious materials including filling the interstices with small stones, spalls etc. and wedging with hammer and placing the surface to proper line and level, fixing key stones including dewatering, if any with cost, conveyance and with all leads, lifts and delifts, royalties.DMF, EMF, Additional charges as applicable, Cess and taxes of all materials and labour, T&P etc complete in all respect as per approved drawing,specification and direction of the Engineer-in-Charge.

1332

2862095

2148.72

... More
Fixing 32mm dia anchor bars in foundation rock including drilling 35mm dia holes upto required depth as per specification, wedged anchor and grouting with cement mortar (1:4) including cost conveyance & all taxes of materials (except cost of M S rod) and hire and running charges of all machineries and all labour charges for spillway structure including pullout testing of at least 30% of anchors etc. complete, construction of approach road to site including clearance of slush and muck, cost, conveyance, taxes of all materials, cess etc. and as per the direction of Engineer-in-charge.

16530

8795613

532.1

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100mm dia PVC pipe, extending through the full width of the structure with slope of 1V:20H towards D/s face. Complete including cost of all labour, materials, cess etc as per drawing and Technical Specification.

882

112763

127.85

... More
Back filling with sand behind abutment, wing wall and return wall complete as per drawing and Technical Specification etc., complete including cost conveyance, royalty EMF, DMF, additional charges of all materials, labour, cess etc. complete as per direction of the Engineer-in-charge.

5040.17

12610001

2501.9

... More
Providing block out in concrete for fixing embedded parts in gate grooves and other embedment for dams and barrages etc, with wooden flanks with cost of all materials labour charges, cess, T&P etc,complete including fixing anchor rods complete as directed by Engineer-in-charge.

615.23

1313208

2134.5

... More
Supplying, Manufacturing and fixing embedded parts in concrete including anchoring and placing in specified position including supply of all materials, labour, T&P, cess etc for manufacturing embedded parts, as per design and fixing in position in proper alignment by welding rigidly to reinforcement as directed by Engineer in charge.

166.25

2237774

13460.3

... More
Providing form work for concrete with F1 finish for upstream faces of dam, spillway,Head Regulators unexposed surfaces of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials, cess and T&P complete as directed by Engineer in charge.

11593

13187037

1137.5

... More
Providing form work for concrete with F2 finish for all permanantly exposed surface to public view such as in Concrete Dam , bridge, retaining walls, spillway, Head Regulators with steel shutter, or ply wood shutter including supply or rigid tie and supports with all labour materials & and T&P, cess complete including finishing complete as directed by Engineer in charge.

40912.77

50474084

1233.7

... More
Providing form work for concrete with F2 finish for all permanantly exposed surface to public view such as in Bucket, Ogee, Pier, Noses and other Curved surfaces with steel shutter or ply wood shutter including supply or rigid tie and supports with all labour materials & and T&P, cess complete including finishing complete as directed by Engineer in charge.

1413.68

1781660

1260.3

... More
Providing,fitting,fixing angle iron expansion joints with MS angle of size 75mm x75mm x 6mm thick M.S plate and 12mm dia HYSD bars, including all labour materials and T&P, cess complete as directed by Engineer in charge.

92.8

289025

3114.5

... More
Providing & fixing 25mm Bitumenous board in contraction joints including all cost, carriage, all labour materials & T&P, cess complete as directed by Engineer in charge.

17.65

28326

1604.9

... More
Providing & fixing Neoprene bearing on piers to receive beam of the bridge including cost, carriage, including all labour materials, cess & and T&P complete as directed by Engineer in charge.

42

487053

11596.5

... More
Providing PVC water stop for drainage gallery as per approved design including fixing in proper alignment joining with araldite etc including cost of PVC water stop and all labour materials & and T&P, cess complete as directed by Engineer in charge as directed by the Engineer-in-charge.

1516.01

1855444

1223.9

... More
Pressure drilling by suitable drill machine with NX/BX size drill holes either vertical or inclined with all accessories for drilling in rock/ concrete etc.complete including transportation for cosolidation grouting, running maintenance of equipments, cost of drilling bits & and other consumable materials etc. and positioning of drilling machines, arrangement of water supply for drilling including mobilisation and demobilisation of men/ materials, cess etc complete as per direction of Engineer-in-charge.

13581.33

165713412

12201.56

... More
Consolidation pressure grouting in drill holes using NX/BX size facers in upper and lower up the packer rods at a suitable interval with cement in a proportion fixed by the Dept. with water and agitating the mix continuously including ,transportation, hire and running charges of grout pump set etc, arrangement of water supply and its carriage to work site and cost of all other materials, equipments excluding cost of cement etc, including dewatering and making necessary diversion etc complete including cess as directed by Engineer-in Charge.(Inside Drainage Gallery)

5521.9

27691224

5014.8

... More
Pre and post water loss test in drill holes using NX/BX size facers in upper and lower up the packer rods at a suitable interval with water including ,transportation, hire and running charges of test equipments, arrangement of water supply and its carriage to work site and cost of all other materials & labour, cess etc complete as directed by Engineer-in Charge.

2936

10885513

3707.6

... More
Supply of PSC/OPC cement grade of approved brand confirming to IS specification including cost, conveyance and all taxes with all leads lifts etc. required for consolidation grouting as per direction of Engineer-in-Charge.

11044

4481434

405.78

... More
Providing RCC railings in bridges, spillways as per IRC standard design and specification with CC M-15 grade with hard granite chips 20mm downgraded size including cost of centering, shuttering with cost, conveyance royalty, DMF, EMF, additional charges & all taxes of all materials., cess etc. required to complete the work as per specification, drawing and direction of Engineer-in Charge.etc.complete.

200

440220

2201.1

... More
Providing porus cement concrete blocks of size 0.69x0.69 M cross section with 23 cm dia holes with porus concrete(1:3:5) proportion with 20mm downgraded aggregates with all leads and all heights from ground level of spillway including cost conveyance and all taxes of all materials , royalty, DMF, EMF shuttering positioning in dam spillway with all labours T & p and machineries required to complete the work including curing etc complete as per direction of Engineer-in Charge.

1451.2

4199772

2894

... More
Providing and painting two coats of bituminous paints in contraction Joints (Longitudinal & transverse) including cost carriage,all taxes, cess etc. complete as per direction of Engineer-in-charge.

8558.51

858418

100.3

... More
Manufacturing 1000mm dia vent pipes from 3.15mm thick M.S. plates and embeding the same in concrete or masonry in dam including necessary supporting arrangement before embedment and cost, conveyance, all taxes cess etc., complete as directed by the Enginee-in-charge.

96.6

687734

7119.4

... More
Manufacturing 500mm dia vent pipes from 3.15mm thick M.S. plates and embeding the same in concrete or masonry in dam including necessary supporting arrangement before embedment and cost, conveyance, all taxes etc., complete as directed by the Enginee-in-charge.

89.1

342527

3844.3

... More
Manufacturing 300mm dia vent pipes from 3.15mm thick M.S. plates and embeding the same in concrete or masonry in dam including necessary supporting arrangement before embedment and cost, conveyance, all taxes etc., complete as directed by the Enginee-in-charge.

320.9

816337

2543.9

... More
Providing 200mm dia MS pipe of approved quality and embedding the same in concrete in spillway including providing necessary supporting arrangements before embedment including cost, conveyance and all taxes of materials and labours with all leads/lifts/delifts, cess, T&P machineries required to complete the work as per the specification drawing and direction of the Engr-in-charge.

84

159020

1893.1

... More
Providing 200 x 100 dia GI reducer socket of approved quality and embedding the same in drainage gallary of spillway including providing necessary supporting arrangement before embedging including cost of conveyance and all taxes all materials, cess and all labour with all lead etc.complete as per the specification drawing and direction of the Engineer-in-charge.

84

134400

1600

... More
Providing 100mm dia G.I.pipes of approved quality and embedding the same in concrete in spillway including providing necessary supporting arrangements before embedment including cost, conveyance and all taxes of materials and labours with all leads/lifts/delifts, cess T&P machineries required to complete the work as per the specification drawing and direction of the Engr-in-charge.

126

246015

1952.5

... More
Providing 100mm dia GI cap and 100 mm dia coupling of approved quality and embedding the same in drainage gallary of spillway including providing necessary supporting arrangement before embedding including cost, conveyance and all taxes, cess all materials and all labour with all lead etc. complete. as per the specification drawing and direction of the Engineer-in-charge.

84

83613

995.4

... More
Providing 100 mm dia MS pipes of approved quality and embedding the same in concrete in spillway including providing necessary supporting arrangement before embedding including cost, conveyance, all taxes, all materials and labour, cess with all leads etc. complete. as per the specification drawing and direction of the Engineer-in-charge.

193.2

321793

1665.6

... More
Providing 100 x 50 dia GI Tee of approved quality and embedding the same in drainage gallary of spillway including providing necessary supporting arrangement before embedding including cost of conveyance and all taxes all materials, cess and all labour with all lead etc. complete.as per the specification drawing and direction of the Engineer-in-charge.

84

220600

2626.2

... More
Providing 50mm dia GI pipes of approved quality and embedding the same in concrete in spillway including providing necessary supporting arrangements before embedment including cost, conveyance and all taxes of materials and labours with all leads/lifts/delifts T&P machineries, cess required to complete the work as per the specification drawing and direction of the Engr-in-charge.

117.6

98889

840.9

... More
Providing porus cement concrete with porus concrete(1:3.5) proportion with 20mm downgraded aggregates with all leads and all heights from ground level of spillway including cost conveyance and all taxes of all materials , shuttering positioning in dam spillway with all labours T & P and machineries, cess, royalty, DMF, EMF, Additional charges required to complete the work including curing etc complete as per direction of Engineer-in Charge.

79.5

480943

6049.6

... More
Provision for 100mm dia PVC pipe

119.25

88245

740

... More
Providing Tar Paper in Spillway with cost of all materials & labour, conveyance, leads, lifts & delifts, cess, taxes of all materials with incidental charges etc. complete as per specification, drawing and the direction of Engineer-in-Charge.

95.76

10236

106.9

... More
Provision for dewatering

-

-

-

... More
a) By 5 HP Pump (Deisel)

4536

1057386

233.11

... More
b) By 10 HP Pump (Deisel)

3780

1296918

343.1

... More
c) By 20 HP Pump (Deisel)

3780

2107425

557.52

... More
d) By 40 HP Pump (Deisel)

3024

2528910

836.28

... More
Supplying , laying and collar jointing RCC spun pipes (NP3) with necessary twisted and coltared hemp yarn including caulking and filling with cement mortar (1:1) and finishing the same smooth and curing including, cost, conveyance, taxes, royalty, EMP, DMF, Additional charges as applicable, cost of labour, cess with all leads and lifts complete as per direction of Engineer-in-Charge.

100

972050

9720.5

... More
Provision for Instrument in the instrumentation Gallery

-

-

-

... More
a) Pore Pressure Meter

6

390000

65000

... More
b) Stress Meter

5

325000

65000

... More
c) Temperature Meter

8

208000

26000

... More
d) Linear Joint Meter

6

276000

46000

... More
e) Strain Meter 5 in a Group

3

156000

52000

... More
f) No Stress Meter

3

54000

18000

... More
g) Uplift Pressure Meter

6

270000

45000

... More
h) Plumb Line

1

1200000

1200000

... More
i) Inverted Plumb Line

1

1200000

1200000

... More
j) Strong Motion Acceleograph

1

1100000

1100000

... More
Constuction of 11 KV Line with G.I. Joist poles, stays, Disc insulators, earthing supports, tree cutting, road crossing guarding provision etc with all cost of labour, material etc complete as per direction of Engineer-in-charge and under the supervision of Electrical H.T. License Holder.

2

3633420

1816710

... More
Installation of Online 11 KV AB switch with all fittings and accesorise etc with all cost of labour & material etc. complete under supervision of Electrical H.T. Licence Holder and as per direction of Engineer-in-Charge.

1

170150

170150

... More
Construction of 250 KVA, 11/0.4 KV Plinth mounted S/S with all fixtures and accessories complete under supervision of Electrical H.T. Licence Holder and as per direction of Engineer-in-Charge.

1

1213161

1213161

... More
The item rates indicated aove work inclusive of cost of all labour, materials,conveyence,taxes and royality(with EMF,DMF and additional charges) of materials,labour cess,here and running charges of all machineries and equipments and other incidental charges so as to complete the item in all respect as per specification and direction of Engineer-In-Charge.Accordingly the bidder has to quote the rates.The rate are exclusive of GST as applicable.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.