Orissa Construction Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Orissa Construction Corporation Limited - OCCL Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date16 Jul 2024
Closing Date13 Aug 2024
Tender Amount₹ 2,19,58,401 
Notes
Download

Costs

Summary

E-procurement Notice No.06/occl/2024-25(on-line)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.C.C. M20 in approved surface using 20mm size down graded black hard granite (crusher broken chips) and mixing by concrete mixture including hoisting and laying concrete in position with all leads, with one extra lifts, delifts for mix concrete, royality of all materials and cess including dewatering, vibrator & hire and running charges of machineries required for the work etc. complete as directed by Engineer-in-Charge.

771.08

5141407

6667.8

... More
Rigid smooth centering & shuttering for R.C.C. work including false work & dismentaling them after casting etc complete with all cost, carriage …etc complete as per direction of the Engineer-in-charge. (R.C.C. walls and fins including attached pillasters)

1760.32

836856

475.4

... More
Filling foundation and plinth with excavated materials including watering & ramming etc. complete as per direction of the Engineer-in-charge.

1072.2

824092

768.6

... More
Supplying, laying & fixing in position R.C.C. (NP3) Hume pipe (450mm dia) with collar joints with cement mortar (1:3) etc. complete with all labour, cost of hume pipe with all taxes, carriage etc complete as per direction of the Engineer-in-charge.

10

21115

2111.55

... More
Supplying, laying & fixing in position R.C.C. (NP3) Hume pipe (100mm dia) with collar joints with cement mortar (1:3) etc. complete with all labour, cost of hume pipe with all taxes, carriage etc complete as per direction of the Engineer-in-charge.

48

22819

475.4

... More
Supplying, laying & fixing in position R.C.C. (NP3) Hume pipe (150mm dia) with collar joints with cement mortar (1:3) etc. complete with all labour, cost of hume pipe with all taxes, carriage etc complete as per direction of the Engineer-in-charge.

32

19196

599.9

... More
Supplying, laying & fixing in position R.C.C. (NP3) Hume pipe (600mm dia) with collar joints with cement mortar (1:3) etc. complete with all labour, cost of hume pipe with all taxes, carriage etc complete as per direction of the Engineer-in-charge.

100

307515

3075.15

... More
Earth work in all kinds of soil by mechanical means, with all leads, lifts & delifts including loading into transportation vehicles and unloading from transported vehicle & depositing the same on properly prepared & Scientifically approved surface including rough dressing and breaking clods to maximum 5Cm. to 7Cm. in size with compacting and watering upto O.M.C. rolling earth work with P.R.R. in embankment in layers not exceeding 0.23m by power road roller including hire and running charges of the roller, water, labour etc complete including cost, carriage, royalty etc. complete as per direction of the Engineer-in-charge. (Earth will be arranged by contractor at his own risk & measurement will take on finished section)

12694.63

2731884

215.2

... More
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes, shrubs,saplings and trees girth upto 300mm,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, up to a lead of 1000mtr. including removal and disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of the Engineer-in-charge.

2483.72

27320

11

... More
Collecting, Supplying of Moorum & Sand admixing in 60:40 proportion and Stacking in regular box heaps 1.50m.X 1.50m.X0.50m. including all cost ,carriage & royalty of moorum & sand. Conveying from stacks & spreading moorum sand admixture in sub-base in layers not exceeding 22.5Cm. & compacting to the required density in OMC with Vibrator Roller etc.complete as per the direction of the Engineer-in-charge.

1017

1513041

1487.75

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoRT&H Specifications for Road & Bridge works (4th Revision).

1017

3550296

3490.95

... More
Providing and applying Primer coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Clause 503 of MoSRT&H Specifications for Road & Bridge works. (4th Revision)

6780

230520

34

... More
Providing and laying bituminous macadam with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to be required grade, level and alignment rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specifications for road & Bridge works including hire and running charges of all mechineries with cost, conveyance & royalty of bitumen, metal & chips etc.complete as per direction of the Engineer-in-Charge

339

3132563

9240.6

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Clause 503 of MoSRT&H Specifications for Road & Bridge works. (4th Revision)

6780

84072

12.4

... More
Providing and laying semi dense bituminous concrete (SDBC) with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to be required grade, level and alignment rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specifications for road & Bridge works including hire and running charges of all mechineries with cost, conveyance & royalty of bitumen, metal & chips etc.complete as per direction of the Engineer-in-Charge.

169.5

1964250

11588.5

... More
Collecting, Supplying of Moorum including all cost, carriage & royalty of moorum & spreading moorum on top of soling surface, cosolidation with P.R.R. including watering etc.complete as per the direction of the Engineer-in-charge.

271.2

400562

1477

... More
Dismantling brick or stone masonry in lime or cement mortar under 3 M. height including stacking the usefull materials at site for reuse and removing the debris within with all leads and lifts etc complete as per the direction of Engineer-in-charge

12.9

20247

1569.9

... More
The item rates indicated aove work inclusive of cost of all labour, materials,conveyence,taxes and royality(with EMF,DMF and additional charges) of materials,labour cess,here and running charges of all machineries and equipments and other incidental charges so as to complete the item in all respect as per specification and direction of Engineer-In-Charge.Accordingly the bidder has to quote the rates.The rate are exclusive of GST as applicable.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.