Odisha Water Supply And Sewerage Board Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OWSSB_77390_1Tender No
01(2)/PMU-I/OWSSB/SBP/2022-23 Dt.27.04.2022Tender Authority
Odisha Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://http://www.urbanodisha.gov.in/OWSSB.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1.50 M to 3.0 M depth
139.44
-
-
... More
3.00 M to 4.50 M depth
74.37
-
-
... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty ,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
10.66
-
-
... More
Supplying all materials, labour, T&P of Cement concrete (1:3:6) using 40 mm. size hard granite crusher broken metal including watering and curing including cost, conveyance, royalties and taxes all complete as directed by Engineer-in charge.
12
-
-
... More
Supplying of all materials, labour T&P for RCC M25 with 20mm size and down graded hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
52.88
-
-
... More
Supplying of all materials, labour T&P for RCC M20 with 20mm size and down graded hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
9.95
-
-
... More
Supplying of all materials, labour T&P for M.S reinforcement for RCC work including cutting, bending, binding, straightening & tying grills and placing in position including cost of binding wire 18 to 20 gauge, M.S. Rod/Tor steel with all cost, conveyance & taxes etc. all complete as per P.W.D. specification & direction of Engineer-in-charge.
6.28
-
-
... More
Supplying of all materials, labour T&P fo rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.
-
-
-
... More
Base slab shuttering
8.4
-
-
... More
Wall shuttering
270.2
-
-
... More
Roof slab shuttering
66.06
-
-
... More
Providing 12mm thick cement plaster (1:4) over RCC wall with Cement Punning inside
133
-
-
... More
Supplying of all materials, labour T&P for RCC (1:2:4) with 12mm size hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
4.5
-
-
... More
Supply and placing of heavy duty manhole cover 560mm dia (HD-20) & frame (labour charges fir fixing and concreting comes under shuttering)
2
-
-
... More
Supplying all materials, Labour, T&P for Refilling the excavated trenches with suitable backfill materials at locations identified by the Authority’s Engineer, duly watered and consolidated to 90% of maximum density at optimum moisture content. As per standard specification & direction of the Engineer-in-charge.
74.2
-
-
... More
Supplying of all materials, labour T&P for baricading of trenches
50.8
-
-
... More
Provision for inlet and outlet piping arrangement
1
-
-
... More
Constraction of 200 User Spetic Tank-1 No
Supplying all labour, T&P and Earthwork in excavation in all kind of soil with in 50 m. initial lead & 1.50m. initial lift including Rough dressing, breaking clods, & laying in layers not exceeding 0.30m in depth, leveling the bed & including sundries , supervision charges,contractor profit & labour cess etc, & as per the direction of engineer- in-charge.
-
-
-
... More
0.00 M to 1.50 M depth
99.96
-
-
... More
Supplying all labour, T&P and Earthwork in excavation in DI rock with in 50 m. initial lead & 1.50m. initial lift including Rough dressing, breaking clods, & laying in layers not exceeding 0.30m in depth, leveling the bed & including sundries , supervision charges,contractor profit & labour cess etc, & as per the direction of engineer- in-charge.
-
-
-
... More
1.50 M to 3.0 M depth
99.96
-
-
... More
3.00 M to 4.50 M depth
53.31
-
-
... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty ,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
6.3
-
-
... More
Supplying all materials, labour, T&P of Cement concrete (1:3:6) using 40 mm. size hard granite crusher broken metal including watering and curing including cost, conveyance, royalties and taxes all complete as directed by Engineer-in charge.
9.45
-
-
... More
Supplying of all materials, labour T&P for RCC M25 with 20mm size and down graded hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
41.12
-
-
... More
Supplying of all materials, labour T&P for RCC M20 with 20mm size and down graded hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
6.67
-
-
... More
Supplying of all materials, labour T&P for M.S reinforcement for RCC work including cutting, bending, binding, straightening & tying grills and placing in position including cost of binding wire 18 to 20 gauge, M.S. Rod/Tor steel with all cost, conveyance & taxes etc. all complete as per P.W.D. specification & direction of Engineer-in-charge.
4.78
-
-
... More
Supplying of all materials, labour T&P fo rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.
-
-
-
... More
Base slab shuttering
6.76
-
-
... More
Wall shuttering
218.4
-
-
... More
Roof slab shuttering
44.43
-
-
... More
Providing 12mm thick cement plaster (1:4) over RCC wall with Cement Punning inside
107.1
-
-
... More
Supplying of all materials, labour T&P for RCC (1:2:4) with 12mm size hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
2.97
-
-
... More
Supply and placing of heavy duty manhole cover 560mm dia (HD-20) & frame (labour charges fir fixing and concreting comes under shuttering)
2
-
-
... More
Supplying all materials, Labour, T&P for Refilling the excavated trenches with suitable backfill materials at locations identified by the Authority’s Engineer, duly watered and consolidated to 90% of maximum density at optimum moisture content. As per standard specification & direction of the Engineer-in-charge.
60.55
-
-
... More
Supplying of all materials, labour T&P for baricading of trenches
41
-
-
... More
Provision for inlet and outlet piping arrangement
1
-
-
... More
Constraction of Soak Pit-2 Nos
Supplying all labour, T&P and Earthwork in excavation in all kind of soil with in 50 m. initial lead & 1.50m. initial lift including Rough dressing, breaking clods, & laying in layers not exceeding 0.30m in depth, leveling the bed & including sundries , supervision charges,contractor profit & labour cess etc, & as per the direction of engineer- in-charge.
-
-
-
... More
0.00 M to 1.50 M depth
46.84
-
-
... More
Supplying all labour, T&P and Earthwork in excavation in DI rock with in 50 m. initial lead & 1.50m. initial lift including Rough dressing, breaking clods, & laying in layers not exceeding 0.30m in depth, leveling the bed & including sundries , supervision charges,contractor profit & labour cess etc, & as per the direction of engineer- in-charge.
-
-
-
... More
1.50 M to 3.0 M depth
46.84
-
-
... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty ,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
1.54
-
-
... More
Supplying all materials, labour, T&P of Cement concrete (1:3:6) using 40 mm. size hard granite crusher broken metal including watering and curing including cost, conveyance, royalties and taxes all complete as directed by Engineer-in charge.
1.38
-
-
... More
Fly ash. Bricks (23 Cm. x 11Cm. x 8Cm.) Or 9" having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance +-2 percent.
15.68
-
-
... More
Providing 16mm thick cement plaster (1:3) over brick work masonary with Cement Punning inside
79.7
-
-
... More
Supplying of all materials, labour T&P for RCC M20 with 20mm size and down graded hard granite crusher broken chips for RCC work excluding centring ,shuttering with all cost, conveyance, royalty & taxes etc. all complete as per P.W.D. specification and direction of Engineer-in-charge.
1.9
-
-
... More
Supplying of all materials, labour T&P for M.S reinforcement for RCC work including cutting, bending, binding, straightening & tying grills and placing in position including cost of binding wire 18 to 20 gauge, M.S. Rod/Tor steel with all cost, conveyance & taxes etc. all complete as per P.W.D. specification & direction of Engineer-in-charge.
0.19
-
-
... More
Supplying of all materials, labour T&P fo rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.
-
-
-
... More
Roof slab shuttering
28.2
-
-
... More
Supply and placing of heavy duty manhole cover 560mm dia (HD-20) & frame (labour charges fir fixing and concreting comes under shuttering)
4
-
-
... More
Supplying all materials, labour, T&P and filling in foundation with brick khoa including conveyance of all materials to work site, payment of royalty ,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
32.66
-
-
... More
Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty ,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge.
37.99
-
-
... More
Supplying all materials, Labour, T&P for Refilling the excavated trenches with suitable backfill materials at locations identified by the Authority’s Engineer, duly watered and consolidated to 90% of maximum density at optimum moisture content. As per standard specification & direction of the Engineer-in-charge.
10.86
-
-
... More
Supplying of all materials, labour T&P for baricading of trenches
32.15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements