Odisha University Of Agriculture And Technology Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Odisha University Of Agriculture And Technology - OUAT Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date5 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 12,17,382
Costs
EMD
₹ 12,174Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OUAT_103532_2Bid Award Id
ViewTender No
1/24-25Tender Authority
Odisha University Of Agriculture And Technology ViewPurchaser Address
-Website
http://http://www.ouat.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of 1Cx 400 mm2 LT XLPE CABLE (UN-Armoured) , Complete with all accessories & Connection. Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
120
53122
442.69
S/F of H.G.Fuse (11KV. 200 A. 3 Pole) Complete with all accessories . Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
1
9792
9792.64
S/F of P.G clamp for 55 sq.mm AAA Conductor, Complete with all accessories . Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
6
4222
703.78
Earthing with 50x 6mm G.I flat , 2.36kg/ mtr, (2.5x7 mtr. for mesh formation, 12 mtr. for LA & 2.5 mtr. for raising, 11 mtr for AB switch, 2.8 mtr for HG fuse, 5x2 mtr. for DTR nutral, (1.3+4.5) mtr. for DTR body, 0.500 mtr for LYDB & AB switch operating handle, 3 mtr. for fencing) (each 65.6x2.36=154.81kg) , Complete with all accessories ,including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
154.52
16992
109.97
S/F of 40 mm nominal bore GI pipe (medium gauge) earthing device with 3 mtr long, Complete with all accessories . Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
5
7697
1539.52
S/F of GI Nuts & Bolts of Assorted Size, Complete with all accessories . Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
5
571
114.36
Construction of earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3 mtr GI pipe 40mm/ 50mm including welding of GI flat around pipe.
5
18500
3700
Construction of LTDR plinth , Complete with all accessories . Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
1
3000
3000
Construction of DTR plinth , Complete with all accessories . Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
1
25000
25000
Laying of 1Cx 400 mm2 LT XLPE CABLE (UN-Armoured) , Complete with all accessories & Connection. Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
120
8640
72
Supply & Erection of G.I Fencing with Gate , Complete with all accessories & Connection. Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.
20
72000
3600
supply & laying of 1202 mm 3 P & N U.G armored Cable wire with one ECC No 8 G.I wire by Cutting trench on floor & grove on wall & make good of them all including all accessories & Connection etc at both the end as per Requirement at site Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge.(Finolex/Polycab/Nico/ Gloster/ Havells)
140
135940
971
S/F of 80mm GI Pipe including all accessories & connections Including cost and conveyance of all materials labours all taxes etc all complete as per the direction of Engineer in charge (TATA/ JINDAL/ S.S)
36
35298
980.5
Earth work in excavation of foundation trenches in all kinds of soil including moorum stony earth & earth mixed with boulders except sheet rock & boulders requiring blasting including dressing the leveling the bed up to the required level & depositing the excavated earth away from the site with all leads & lifts including shuttering etc complete all respect as directed by the engineer-in-charge cost & conveyance of all materials labours & T&P etc all complete.( (1x0.30x0.60x36)=6.48 Cum)
6.48
1475
227.7
Charges for making co-ordination and liasoning for external work with TPCODL company, electrical inspecting authority etc. for various approval /permission required to obtaion electrical Inispection report & power supply to the building with depositing required amount of inispection fees , treasary challan etc for charging of the building. (6%)
1
68908
68908.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements